Maintenance Technology April 2016 - (Page 21)

RELIABILITY & SAFETY Loadability Studies Aid PRC-025-1 Compliance While Bulk Electric System powergeneration facilities have until 2019 to conform to the PRC-025-1 standard, early adopters can begin capturing a range of benefits now. Jane Alexander, Managing Editor IN AUGUST 2003, an electric power blackout across the northeast United States and Ontario, Canada, affected an estimated 50 million people. Analysis of this and other major disturbances over the past 25 years has revealed generators tripped for conditions that did not pose a direct risk to those units and associated equipment. As a result, the North American Electric Reliability Corp. (NERC), Atlanta, created the PRC-025-1 Generator Relay Loadability Standard. According to Steve Nollette, supervising engineer for Emerson Network Power's Electrical Reliability Services, Columbus, OH, the intent of the standard is to increase grid stability during system disturbances by reducing unnecessary tripping of generators or the number of "misoperations" caused by incorrect settings, logic, or design errors. The Federal Energy Regulatory Commission (FERC), Washington, has launched a campaign designed to reduce misoperations by 25%, including implementation of standardized setting methodologies such as PRC-025-1, which is currently enforceable. Bulk Electric System (BES) generation facilities, according to the NERC definition, are required to conform to PRC-025-1 by October 2019. Nollette explained that, while this seems like ample time, facilities should begin planning a loadability study now to reap the following benefits associated with early adoption and, thus, avoid the costly consequences of delay or noncompliance. Better access to engineering resources. As regulatory requirements governing operations continue to change, single generation sites that operate with limited engineering resources may need assistance from external or outsourced resources such as contractors, who can perform the highly technical tasks needed to meet the new regulatory requirements. While multi-site generation entities often already utilize an engineering team specializing in matters pertaining to NERC compliance, they may also need assistance due to the volume of work related to analyzing, implementing, and testing all of their protective relays. "The economic laws of supply and demand dictate that, as a deadline approaches and more generation plants rush to seek out contract assistance, the available supply of contractors and engineering firms will dwindle," Nollette said. "This translates into higher costs and potentially lower quality. Early adopters will have access to greater engineering resources at lower costs." Less business interruption. For generation sites that have completed a system assessment and require changes to the load-sensitive protective relay settings, implementation and testing will need to be scheduled, requiring a maintenance outage. When a loadability study is performed earlier, there is a greater ability to schedule the implementation and testing during a planned outage rather than having to schedule a separate main- Above. Regulatory requirements governing Bulk Electric System (BES) power-generation owners and operators are expected to significantly increase the volume of work related to analyzing, implementing, and testing protective relays at sites. APRIL 2016 MAINTENANCETECHNOLOGY.COM | 21 http://www.MAINTENANCETECHNOLOGY.COM

Table of Contents for the Digital Edition of Maintenance Technology April 2016

My Take
Uptime
On The Floor
Culture Changed At This Indiana Refinery
She Ignores The Glass Ceiling
Loadability Studies Aid PRC-025-1 Compliance
Look System-Wide For Cost Savings
Reliable Pumping Supplement
Fund Lubrication Program With Energy Savings
Emergency-Stop Choices
Cyber Security
Backup Generators
Infrared Safety Tips
Internet Of Things
ISO 55000
Motor-Testing Tools Expand Services
Products
Showcase
Ad Index
Final Thought

Maintenance Technology April 2016

http://www.nxtbook.com/atp/MaintenanceTechnology/epfeb2020
http://www.nxtbook.com/atp/MaintenanceTechnology/epjan2019
http://www.nxtbook.com/atp/MaintenanceTechnology/epnovdec2019
http://www.nxtbook.com/atp/MaintenanceTechnology/epseptoct2019
http://www.nxtbook.com/atp/MaintenanceTechnology/epmay2019
http://www.nxtbook.com/atp/MaintenanceTechnology/epapril2019
http://www.nxtbook.com/atp/MaintenanceTechnology/epmarch2019
http://www.nxtbook.com/atp/MaintenanceTechnology/epfebruary2019
http://www.nxtbook.com/atp/MaintenanceTechnology/epjanuary2019
http://www.nxtbook.com/atp/MaintenanceTechnology/epdecember2018
http://www.nxtbook.com/atp/MaintenanceTechnology/epnovember2018
http://www.nxtbook.com/atp/MaintenanceTechnology/epoctober2018
http://www.nxtbook.com/atp/MaintenanceTechnology/epseptember2019
http://www.nxtbook.com/atp/MaintenanceTechnology/epaugust2018
http://www.nxtbook.com/atp/MaintenanceTechnology/0818schneider
http://www.nxtbook.com/atp/MaintenanceTechnology/epjuly2018
http://www.nxtbook.com/atp/MaintenanceTechnology/epjune2018
http://www.nxtbook.com/atp/MaintenanceTechnology/epmay2018
http://www.nxtbook.com/atp/MaintenanceTechnology/epapril2018
http://www.nxtbook.com/atp/MaintenanceTechnology/epmarch2018
http://www.nxtbook.com/atp/MaintenanceTechnology/epfebruary2018
http://www.nxtbook.com/atp/MaintenanceTechnology/epjanuary2018
http://www.nxtbook.com/atp/MaintenanceTechnology/epdecember2017
http://www.nxtbook.com/atp/MaintenanceTechnology/epnovember2017
http://www.nxtbook.com/atp/MaintenanceTechnology/epoctober2017
http://www.nxtbook.com/atp/MaintenanceTechnology/mtsept2017
http://www.nxtbook.com/atp/MaintenanceTechnology/mtaugust2017
http://www.nxtbook.com/atp/MaintenanceTechnology/mtjuly2017
http://www.nxtbook.com/atp/MaintenanceTechnology/mtjune2017
http://www.nxtbook.com/atp/MaintenanceTechnology/mtmay2017
http://www.nxtbook.com/atp/MaintenanceTechnology/mtapril2017
http://www.nxtbook.com/atp/MaintenanceTechnology/mtmarch2017
http://www.nxtbook.com/atp/MaintenanceTechnology/mtfebruary2017
http://www.nxtbook.com/atp/MaintenanceTechnology/mtjanuary2017
http://www.nxtbook.com/atp/MaintenanceTechnology/mtdecember2016
http://www.nxtbook.com/atp/MaintenanceTechnology/mtnovember2016
http://www.nxtbook.com/atp/MaintenanceTechnology/mtoctober2016
http://www.nxtbook.com/atp/MaintenanceTechnology/mtseptember2016
http://www.nxtbook.com/atp/MaintenanceTechnology/mtaugust2016
http://www.nxtbook.com/atp/MaintenanceTechnology/mtjuly2016
http://www.nxtbook.com/atp/MaintenanceTechnology/mtjune2016
http://www.nxtbook.com/atp/MaintenanceTechnology/mtmay2016
http://www.nxtbook.com/atp/MaintenanceTechnology/mtapril2016
http://www.nxtbook.com/atp/MaintenanceTechnology/mtmarch2016
http://www.nxtbook.com/atp/MaintenanceTechnology/mtfebruary2016
http://www.nxtbook.com/atp/MaintenanceTechnology/mtjanuary2016
http://www.nxtbook.com/atp/MaintenanceTechnology/mtdecember2015
http://www.nxtbook.com/atp/MaintenanceTechnology/mtnovember2015
http://www.nxtbook.com/atp/MaintenanceTechnology/mtoctober2015
http://www.nxtbook.com/atp/MaintenanceTechnology/mtseptember2015
http://www.nxtbook.com/atp/MaintenanceTechnology/MTAugust2015
http://www.nxtbook.com/atp/MaintenanceTechnology/MTJuly2015
http://www.nxtbook.com/atp/MaintenanceTechnology/MTJune2015
http://www.nxtbook.com/atp/MaintenanceTechnology/M
http://www.nxtbook.com/atp/MaintenanceTechnology/0415endress
http://www.nxtbook.com/atp/MaintenanceTechnology/MTApril2015
http://www.nxtbook.com/atp/MaintenanceTechnology/MTMarch2015
http://www.nxtbook.com/atp/MaintenanceTechnology/MTFebruary2015
http://www.nxtbook.com/atp/MaintenanceTechnology/MTJanuary2015
http://www.nxtbook.com/atp/MaintenanceTechnology/MTDecember2014
http://www.nxtbook.com/atp/MaintenanceTechnology/MTNovember2014
http://www.nxtbook.com/atp/MaintenanceTechnology/MTOctober2014
http://www.nxtbook.com/atp/MaintenanceTechnology/MTSeptember2014
http://www.nxtbook.com/atp/MaintenanceTechnology/MTAugust2014
http://www.nxtbook.com/atp/MaintenanceTechnology/MTJuly2014
http://www.nxtbookMEDIA.com