pmsc - (Page 15) EXAMPLE Projects Some Example Projects from Industry Continued • Southern Track Renewals Company Safety Case auditing of approved sub-contractors. • Railtrack MPD East Anglia Production of a Simplified Project Safety Case structure for small projects. • Rust Kennedy & Donkin Risk analysis of the task of temporary earth strap installation at Designated Earthing Points. • Owen Williams Railway (Formerly BR DCU, Birmingham) Project risk assessment for location of a crossover near stafford. • Railtrack West Coast Main Line Route Modernisation, Birmingham Assistance to Railtrack in the supply of Safety Risk Manager and Safety Manager Re-Signalling. • Interfleet Technology Limited, Derby Assistance on the HAZOPs for HEX temporary station for the proposed Fast Train Service and the train care facility (depot) for HEX. • Ferson Contractors & Thomas Vale Construction Assistance in the preparation of Contractors Safety Cases for construction contractors working for the first time on the UK railway. • Railtrack Property Projects Organisation and delivery of the 100 basic Principles training courses for engineering work on the UK railway. • Railtrack Thameslink 2000 Project Team Project Management of the Reliability, Availability, Maintainability & Safety, RAMS. 15
Table of Contents Feed for the Digital Edition of pmsc pmsc pmsc - (Page 1) pmsc - (Page 2) pmsc - (Page 3) pmsc - (Page 4) pmsc - (Page 5) pmsc - (Page 6) pmsc - (Page 7) pmsc - (Page 8) pmsc - (Page 9) pmsc - (Page 10) pmsc - (Page 11) pmsc - (Page 12) pmsc - (Page 13) pmsc - (Page 14) pmsc - (Page 15) pmsc - (Page 16) pmsc - (Page 17) pmsc - (Page 18) pmsc - (Page 19) pmsc - (Page 20)
For optimal viewing of this digital publication, please enable JavaScript and then refresh the page. If you would like to try to load the digital publication without using Flash Player detection, please click here.