Rural Water - Quarter 3, 2018 - 22

TO INSURE THAT YOUR SYSTEM WILL
BE ABLE TO GUARANTEE ITS CONTINUITY
AND PROTECT ITS ASSETS, PUT TOGETHER
A PLAN FOR YOUR NEEDS.
may significantly understate the likely
current cost of replacement of the system.
Using the estimated replacement value
or capital needs assessment is a more
appropriate approach, however, it requires
the help of architects and consultants.

This method will represent a more reliable
provision for facility needs.
Next, determine the funding for the
reserve. The most appropriate way is to
put aside a stated percentage of your total
revenues or net income each year. This can

GF Piping Systems

9950 Dual Channel SmartPro
Transmitter/Controller
The 9950 SmartPro Transmitter takes a simple approach to modularity.
Choose from DC powered only or AC/ DC powered system. The 9950 is ready
to run out of the box with its standard two 40-2omA passive outputs. Add
optional relay modules and binary inputs, and transform your SmartPro in
to a two channel controller. With on board clock/calendar, derived functions,
and advanced relay operation, you have seemingly countless configurations
to meet your process control needs.

See details at www.gfpiping.com
2270 Level

Pipe, Valves, Fittings, Measurement & Control

2551
2
5 Ultrasonic
s n

9271 Jeronimo Road, Irvine, CA 92618
Phone (714) 731-8800,, Toll Free (800) 854-4090
e-mail: us.ps@georgfischer.com
h
* www.gfpiping.com
f i i

22

THIRD QUARTER 2018

864021_GF.indd 1

4/3/17 2:50 PM

be accomplished by budgeting each year
for a contribution to your reserve. This may
be accomplished by a single contribution at
the end of the year or by making a monthly
contribution of your net income. This
allows for your costs of doing business to
be accounted for and funded before any
funds are moved to the reserve.
It is always a good idea to be proactive
with the subject of reserves and future
planning. And, to successfully accomplish
this is to first have a good reserve policy.
Some key elements are:
* Identify ways you can fund the reserve
* Attach a timeline to the reserve
* Include a means by which the funds will
be dispersed when needed
* Identify a way to track and monitor
the funds.
Funding a reserve should be disciplined
and consistent. Identify how regular
and planned contributions can be made.
There are several sources that could be
used, such as budgeted surplus, funded
depreciation or a dedicated revenue
stream. Whatever way is chosen to be
used supplies the planning documents to
achieve the revenue for the required level.
A timeline for building the reserves
anticipates replacement and improvement
needs, but should also be flexible enough
to respond to unexpected needs.
The means by which the funds will
be dispersed should include the rules for
withdrawing and using the funds. This
should include who is to recommend and
approve the expenditure. During the life
of the reserve, unexpected occurrences
will more than likely occur and should be
anticipated and contain a mechanism for
such needs.
The funds should be monitored and
tracked to insure they are not being
dispersed for anything other than the
designated purpose. These funds do not
necessarily have to be segregated into a
separate account. In fact, it is better to
combine them with other investments to
maximize your return.
To finance future projects, build your
reserves. The simplest way is to first
create a policy that will direct the process,
then do the research to get the numbers
and last, start building your reserve.
The policy should be unique to your
system, making your reserve unique to
your project. ●


http://www.gfpiping.com http://www.gfpiping.com http://www.gfpiping.com

Table of Contents for the Digital Edition of Rural Water - Quarter 3, 2018

From the President
Infrastructure and Rural Water
Rural Prosperity Through Infrastructure, Partnerships and Innovation
Building Your Reserves to Plan for the Future
Rural Water Loan Fund Helps Small System Repair Well After Lightning Strike
State Rural Water Association Profile: Kansas Rural Water Association
A Day in the Life of a Circuit Rider
Regulatory Update
Case Study: Screw Pumps Provide Treatment Plant with Efficient Alternative
Up the Creek: The Secret of Longevity
Index to Advertisers/Advertisers.com
From the CEO
Rural Water - Quarter 3, 2018 - Intro
Rural Water - Quarter 3, 2018 - bellyband1
Rural Water - Quarter 3, 2018 - bellyband2
Rural Water - Quarter 3, 2018 - cover1
Rural Water - Quarter 3, 2018 - cover2
Rural Water - Quarter 3, 2018 - 3
Rural Water - Quarter 3, 2018 - 4
Rural Water - Quarter 3, 2018 - 5
Rural Water - Quarter 3, 2018 - 6
Rural Water - Quarter 3, 2018 - 7
Rural Water - Quarter 3, 2018 - 8
Rural Water - Quarter 3, 2018 - 9
Rural Water - Quarter 3, 2018 - 10
Rural Water - Quarter 3, 2018 - From the President
Rural Water - Quarter 3, 2018 - Infrastructure and Rural Water
Rural Water - Quarter 3, 2018 - 13
Rural Water - Quarter 3, 2018 - 14
Rural Water - Quarter 3, 2018 - 15
Rural Water - Quarter 3, 2018 - 16
Rural Water - Quarter 3, 2018 - 17
Rural Water - Quarter 3, 2018 - Rural Prosperity Through Infrastructure, Partnerships and Innovation
Rural Water - Quarter 3, 2018 - 19
Rural Water - Quarter 3, 2018 - 20
Rural Water - Quarter 3, 2018 - Building Your Reserves to Plan for the Future
Rural Water - Quarter 3, 2018 - 22
Rural Water - Quarter 3, 2018 - 23
Rural Water - Quarter 3, 2018 - 24
Rural Water - Quarter 3, 2018 - Rural Water Loan Fund Helps Small System Repair Well After Lightning Strike
Rural Water - Quarter 3, 2018 - State Rural Water Association Profile: Kansas Rural Water Association
Rural Water - Quarter 3, 2018 - 27
Rural Water - Quarter 3, 2018 - 28
Rural Water - Quarter 3, 2018 - 29
Rural Water - Quarter 3, 2018 - 30
Rural Water - Quarter 3, 2018 - A Day in the Life of a Circuit Rider
Rural Water - Quarter 3, 2018 - 32
Rural Water - Quarter 3, 2018 - 33
Rural Water - Quarter 3, 2018 - 34
Rural Water - Quarter 3, 2018 - Regulatory Update
Rural Water - Quarter 3, 2018 - 36
Rural Water - Quarter 3, 2018 - 37
Rural Water - Quarter 3, 2018 - 38
Rural Water - Quarter 3, 2018 - 39
Rural Water - Quarter 3, 2018 - 40
Rural Water - Quarter 3, 2018 - Case Study: Screw Pumps Provide Treatment Plant with Efficient Alternative
Rural Water - Quarter 3, 2018 - 42
Rural Water - Quarter 3, 2018 - 43
Rural Water - Quarter 3, 2018 - 44
Rural Water - Quarter 3, 2018 - Up the Creek: The Secret of Longevity
Rural Water - Quarter 3, 2018 - 46
Rural Water - Quarter 3, 2018 - 47
Rural Water - Quarter 3, 2018 - Index to Advertisers/Advertisers.com
Rural Water - Quarter 3, 2018 - 49
Rural Water - Quarter 3, 2018 - From the CEO
Rural Water - Quarter 3, 2018 - cover3
Rural Water - Quarter 3, 2018 - cover4
http://www.nxtbook.com/naylor/NRWQ/NRWQ0418
http://www.nxtbook.com/naylor/NRWQ/NRWQ0318
http://www.nxtbook.com/naylor/NRWQ/NRWQ0218
http://www.nxtbook.com/naylor/NRWQ/NRWQ0118
http://www.nxtbook.com/naylor/NRWQ/NRWQ0417
http://www.nxtbook.com/naylor/NRWQ/NRWA0016
http://www.nxtbook.com/naylor/NRWQ/NRWQ0317
http://www.nxtbook.com/naylor/NRWQ/NRWQ0217
http://www.nxtbook.com/naylor/NRWQ/NRWQ0117
http://www.nxtbook.com/naylor/NRWQ/NRWQ0416
http://www.nxtbook.com/naylor/NRWQ/NRWQ0316
http://www.nxtbook.com/naylor/NRWQ/NRWA0015
http://www.nxtbook.com/naylor/NRWQ/NRWQ0216
http://www.nxtbook.com/naylor/NRWQ/NRWQ0116
http://www.nxtbook.com/naylor/NRWQ/NRWQ0415
http://www.nxtbook.com/naylor/NRWQ/NRWQ0315
http://www.nxtbook.com/naylor/NRWQ/NRWQ0215
http://www.nxtbook.com/naylor/NRWQ/NRWQ0115
http://www.nxtbook.com/naylor/NRWQ/NRWQ0414
http://www.nxtbook.com/naylor/NRWQ/NRWQ0314
http://www.nxtbook.com/naylor/NRWQ/NRWQ0214
http://www.nxtbook.com/naylor/NRWQ/NRWQ0114
http://www.nxtbook.com/naylor/NRWQ/NRWQ0413
http://www.nxtbook.com/naylor/NRWQ/NRWQ0313
http://www.nxtbook.com/naylor/NRWQ/NRWQ0213
http://www.nxtbook.com/naylor/NRWQ/NRWQ0113
http://www.nxtbook.com/nxtbooks/naylor/NRWQ0412
http://www.nxtbook.com/nxtbooks/naylor/NRWQ0312
http://www.nxtbook.com/nxtbooks/naylor/NRWQ0212
http://www.nxtbook.com/nxtbooks/naylor/NRWQ0112
http://www.nxtbook.com/nxtbooks/naylor/NRWQ0411
http://www.nxtbook.com/nxtbooks/naylor/NRWQ0311
http://www.nxtbook.com/nxtbooks/naylor/NRWQ0211
http://www.nxtbook.com/nxtbooks/naylor/NRWQ0111
http://www.nxtbook.com/nxtbooks/naylor/NRWQ0410
http://www.nxtbook.com/nxtbooks/naylor/NRWQ0310
http://www.nxtbook.com/nxtbooks/naylor/NRWQ0210
http://www.nxtbook.com/nxtbooks/naylor/NRWQ0110
http://www.nxtbook.com/nxtbooks/naylor/NRWQ0409
http://www.nxtbook.com/nxtbooks/naylor/NRWQ0309
http://www.nxtbook.com/nxtbooks/naylor/NRWQ0209
http://www.nxtbook.com/nxtbooks/naylor/NRWQ0109
http://www.nxtbook.com/nxtbooks/naylor/NRWQ0408
http://www.nxtbook.com/nxtbooks/naylor/NRWQ0308
http://www.nxtbook.com/nxtbooks/naylor/NRWQ0208
http://www.nxtbook.com/nxtbooks/naylor/NRWQ0108
http://www.nxtbookMEDIA.com