Wind Today - Q1 2008 - (Page 24) WT TECHNICAL: LONG-TERM OPERA TING COSTS POST -WARRANTY management is for data collectors to determine operational parameters to track. Typical causes of losses include wind turbine availability, icing and cold temperature-related issues, blade soiling, grid problems, and service access disruption. Researchers would then compare actual performance to predicted annual energy performance (AEP) from the initial wind resource assessment (WRA). This comparison requires that the components causing downtime be isolated and the downtime quantified for that parameter. It would also require understanding of the definitions in the warranty contract to ensure proper comparison with the initial prediction. The collected and analyzed data would then be used to adjust long-term benchmarks. Failur ailures Understanding Failures A third component of asset management is to understand failures. In 2006, the Institute for Solar Energy Technology, Kassel, Germany (ISET/+49 561 7294-0), completed a study of failure frequency and downtime of components for the German fleet of wind turbines. The top chart shows the annual failure frequency of the respective components to the left in blue and downtime per failure to the right in red based on 34,582 incident reports. Note that electrical system failures occured most frequently, but resulted in a minimal amount of downtime. Generator failure, which occured infrequently, resulted in the highest amount of downtime. The bottom chart depicts the mean time between failures by component. This analysis indicates that the drive train could be expected to operate for almost 20 years (perhaps the lifetime of the wind turbine) before a failure occurs. 24 This kind of data regarding wind turbine component failures can indicate the frequency of component breakdowns, the cost of repair, the duration of outages by component, and overall fleet availability. If wind farm owners and operators can manage their assets conservatively by analyzing industry data and tracking performance of their wind farm, operating costs can be minimized. The alternative is to pay for longterm repair and maintenance which may be easier, but more expensive. WIND TODA Y First Quarter 2008
Table of Contents Feed for the Digital Edition of Wind Today - Q1 2008 Wind Today - Q1 2008 Contents Windpower 2008 U.S. Energy Map Canada Energy Map Global Report Options and Expectations for O&M Service Providers O&M Safety Issues for Wind Farms Guanting Wind Farm to Power 2008 Olympics Operating Economics of Wind Farms Long-Term Operating Costs Post-Warranty Energy Bill Incentives May Have Another Chance Wind Gears: A Closer Look at the Drive Train Elk River Wind Farm Should Lightning Be A Concern For Wind Farms? Interview: Steve Sawyer Zephyr Powers Jiminy Peak Mountain Resort WT News: United States & Canada Interview: Willett Kempton Centennial Wind Energy WT Transmission: Southwest Power Pool EPA's Top 25 Wind Power Projects 2008 RPS Update Mark Scher, MSE Power Systems Richard Legault, Helimax Second Wind Henkels & McCoy NRG Systems Apterra Technologies, Inc. Wind Resource Maps: Michigan and New York Calendar Glossary Product Surveys Ad Index Wind Today - Q1 2008 Wind Today - Q1 2008 - (Page Intro) Wind Today - Q1 2008 - Wind Today - Q1 2008 (Page 1) Wind Today - Q1 2008 - Wind Today - Q1 2008 (Page 2) Wind Today - Q1 2008 - Wind Today - Q1 2008 (Page 3) Wind Today - Q1 2008 - Wind Today - Q1 2008 (Page 4) Wind Today - Q1 2008 - Contents (Page 5) Wind Today - Q1 2008 - Windpower 2008 (Page 6) Wind Today - Q1 2008 - Windpower 2008 (Page 7) Wind Today - Q1 2008 - U.S. Energy Map (Page 8) Wind Today - Q1 2008 - U.S. Energy Map (Page 9) Wind Today - Q1 2008 - Canada Energy Map (Page 10) Wind Today - Q1 2008 - Canada Energy Map (Page 11) Wind Today - Q1 2008 - Global Report (Page 12) Wind Today - Q1 2008 - Global Report (Page 13) Wind Today - Q1 2008 - Options and Expectations for O&M Service Providers (Page 14) Wind Today - Q1 2008 - Options and Expectations for O&M Service Providers (Page 15) Wind Today - Q1 2008 - O&M Safety Issues for Wind Farms (Page 16) Wind Today - Q1 2008 - O&M Safety Issues for Wind Farms (Page 17) Wind Today - Q1 2008 - Guanting Wind Farm to Power 2008 Olympics (Page 18) Wind Today - Q1 2008 - Guanting Wind Farm to Power 2008 Olympics (Page 19) Wind Today - Q1 2008 - Operating Economics of Wind Farms (Page 20) Wind Today - Q1 2008 - Operating Economics of Wind Farms (Page 21) Wind Today - Q1 2008 - Long-Term Operating Costs Post-Warranty (Page 22) Wind Today - Q1 2008 - Long-Term Operating Costs Post-Warranty (Page 23) Wind Today - Q1 2008 - Long-Term Operating Costs Post-Warranty (Page 24) Wind Today - Q1 2008 - Energy Bill Incentives May Have Another Chance (Page 25) Wind Today - Q1 2008 - Wind Gears: A Closer Look at the Drive Train (Page 26) Wind Today - Q1 2008 - Wind Gears: A Closer Look at the Drive Train (Page 27) Wind Today - Q1 2008 - Elk River Wind Farm (Page 28) Wind Today - Q1 2008 - Elk River Wind Farm (Page 29) Wind Today - Q1 2008 - Elk River Wind Farm (Page 30) Wind Today - Q1 2008 - Elk River Wind Farm (Page 31) Wind Today - Q1 2008 - Elk River Wind Farm (Page 32) Wind Today - Q1 2008 - Should Lightning Be A Concern For Wind Farms? (Page 33) Wind Today - Q1 2008 - Interview: Steve Sawyer (Page 34) Wind Today - Q1 2008 - Interview: Steve Sawyer (Page 35) Wind Today - Q1 2008 - Zephyr Powers Jiminy Peak Mountain Resort (Page 36) Wind Today - Q1 2008 - WT News: United States & Canada (Page 37) Wind Today - Q1 2008 - WT News: United States & Canada (Page 38) Wind Today - Q1 2008 - WT News: United States & Canada (Page 39) Wind Today - Q1 2008 - Interview: Willett Kempton (Page 40) Wind Today - Q1 2008 - Interview: Willett Kempton (Page 41) Wind Today - Q1 2008 - Centennial Wind Energy (Page 42) Wind Today - Q1 2008 - Centennial Wind Energy (Page 43) Wind Today - Q1 2008 - Centennial Wind Energy (Page 44) Wind Today - Q1 2008 - Centennial Wind Energy (Page 45) Wind Today - Q1 2008 - WT Transmission: Southwest Power Pool (Page 46) Wind Today - Q1 2008 - EPA's Top 25 (Page 47) Wind Today - Q1 2008 - Wind Power Projects 2008 (Page 48) Wind Today - Q1 2008 - Wind Power Projects 2008 (Page 49) Wind Today - Q1 2008 - Wind Power Projects 2008 (Page 50) Wind Today - Q1 2008 - Wind Power Projects 2008 (Page 51) Wind Today - Q1 2008 - Wind Power Projects 2008 (Page 52) Wind Today - Q1 2008 - Wind Power Projects 2008 (Page 53) Wind Today - Q1 2008 - RPS Update (Page 54) Wind Today - Q1 2008 - RPS Update (Page 55) Wind Today - Q1 2008 - Mark Scher, MSE Power Systems (Page 56) Wind Today - Q1 2008 - Richard Legault, Helimax (Page 57) Wind Today - Q1 2008 - Second Wind (Page 58) Wind Today - Q1 2008 - Henkels & McCoy (Page 59) Wind Today - Q1 2008 - NRG Systems (Page 60) Wind Today - Q1 2008 - Apterra Technologies, Inc. (Page 61) Wind Today - Q1 2008 - Wind Resource Maps: Michigan and New York (Page 62) Wind Today - Q1 2008 - Wind Resource Maps: Michigan and New York (Page 63) Wind Today - Q1 2008 - Calendar (Page 64) Wind Today - Q1 2008 - Glossary (Page 65) Wind Today - Q1 2008 - Product Surveys (Page 66) Wind Today - Q1 2008 - Product Surveys (Page 67) Wind Today - Q1 2008 - Product Surveys (Page 68) Wind Today - Q1 2008 - Product Surveys (Page 69) Wind Today - Q1 2008 - Product Surveys (Page 70) Wind Today - Q1 2008 - Product Surveys (Page 71) Wind Today - Q1 2008 - Ad Index (Page 86) Wind Today - Q1 2008 - Ad Index (Page 87) Wind Today - Q1 2008 - Ad Index (Page 88)
For optimal viewing of this digital publication, please enable JavaScript and then refresh the page. If you would like to try to load the digital publication without using Flash Player detection, please click here.