BE MINDFUL OF LEAD TIMES.
"What do you mean you didn't order it? You
knew this material had an eight-week lead time."
This happens more often than you think. Specialty or
custom items (and even some stock items like light
fixtures) can take several weeks to receive. It is critical
to understand these lead times and review them with
the contractor so they're aware of this and can factor
it into scheduling.

2

3

BE SURE TO CHECK SHOP AND
ENGINEERING DRAWINGS.
"This isn't what we discussed! Where did that come
from?" Again, not something you want to hear. The
only way to avoid this is to insist on shop or engineering drawings in order to review key design components. These drawings should be carefully examined
to ensure compliance with the original design intent.
Of course, sometimes adjustments are necessary for a
variety of reasons. Make this an opportunity to review
potential changes and discuss them with the contractor so there are no surprises in the end.

4

DEVELOP COMPREHENSIVE
STANDARDS AND CONDUCT A
FIRST ARTICLES REVIEW TO ENSURE
CONSISTENT EXECUTION.
How can you make sure that store number 813 will
look as good as the brand or retailer's prototype location? In two ways: comprehensive standards and first
articles reviews. Notice, I use the term "standards."
Standards are not "guidelines." Guidelines provide
direction on how things are going to work, either
together or individually (such as space planning relationships, feature wall details, etc.), while standards
are meant to set targets to be used as benchmarks for
every single component and every single store without
deviation. First article reviews are the first production
runs of key in-store components, such as signs and
store fixtures. The first articles should be reviewed and
approved before the rollout commences so mistakes
aren't repeated.

5

THINK OF CREATIVE WAYS TO
CONTROL CONSTRUCTION COSTS.
"I didn't realize we could save that much. How did we
do that?" Now that's something everyone wants to
hear. When it comes to major rollouts with multiple
locations, it is possible to negotiate national sales contracts with key suppliers (such as lighting suppliers,
cladding suppliers, flooring companies, fixture companies, etc.) to obtain the best costs possible. Saving
50 cents per square foot may not sound like a lot, but
when it saves "X" amount on 1000 square feet of material on a 500-store rollout, that could mean upward of
$250,000 in savings. It all adds up, and that's only for
one in-store component.
Managing a comprehensive store rollout or conversion with many locations does not have to be a
problematic or stressful experience, especially with
some thoughtful planning and collaboration. Use
these tips to avoid the most common missteps and
ensure that your next rollout is as smooth and successful as possible.

Many times,
specialty
subcontractors
will have
relevant and
interesting
thoughts to
share that
can influence
potential design
improvements.

Kraig Kessel is a member of VMSD's
Editorial Advisory Board and is a licensed
architect who has spent most of his 30-year
career developing branded environments
and international signage programs. He
co-founded his own company, Kraido, in
2010, which creates retail interiors and develops customer
experiences that are strategic, innovative and practical. x

VMSD.COM

|

DECEMBER 2017

41


http://www.VMSD.COM

Table of Contents for the Digital Edition of VMSD - December 2017

Vmsd - December 2017
Contents
From the Editor
Vmsd Editorial Advisory Board
The Goods
Next Store
Top Stories of 2017
Brooklyn Bound
Reality Begins at Home
Special Report: Retail Design & Construction
Showroom
Ad Index
Checking Out
VMSD - December 2017 - Intro
VMSD - December 2017 - BB1
VMSD - December 2017 - BB2
VMSD - December 2017 - Vmsd - December 2017
VMSD - December 2017 - Cover2
VMSD - December 2017 - 1
VMSD - December 2017 - Contents
VMSD - December 2017 - 3
VMSD - December 2017 - From the Editor
VMSD - December 2017 - 5
VMSD - December 2017 - Vmsd Editorial Advisory Board
VMSD - December 2017 - 7
VMSD - December 2017 - The Goods
VMSD - December 2017 - 9
VMSD - December 2017 - 10
VMSD - December 2017 - 11
VMSD - December 2017 - 12
VMSD - December 2017 - 13
VMSD - December 2017 - 14
VMSD - December 2017 - 15
VMSD - December 2017 - Next Store
VMSD - December 2017 - 17
VMSD - December 2017 - Top Stories of 2017
VMSD - December 2017 - 19
VMSD - December 2017 - 20
VMSD - December 2017 - 21
VMSD - December 2017 - 22
VMSD - December 2017 - 23
VMSD - December 2017 - 24
VMSD - December 2017 - 25
VMSD - December 2017 - Brooklyn Bound
VMSD - December 2017 - 27
VMSD - December 2017 - 28
VMSD - December 2017 - 29
VMSD - December 2017 - 30
VMSD - December 2017 - Reality Begins at Home
VMSD - December 2017 - 32
VMSD - December 2017 - Special Report: Retail Design & Construction
VMSD - December 2017 - 34
VMSD - December 2017 - 35
VMSD - December 2017 - 36
VMSD - December 2017 - 37
VMSD - December 2017 - 38
VMSD - December 2017 - 39
VMSD - December 2017 - 40
VMSD - December 2017 - 41
VMSD - December 2017 - 42
VMSD - December 2017 - Showroom
VMSD - December 2017 - 44
VMSD - December 2017 - 45
VMSD - December 2017 - 46
VMSD - December 2017 - 47
VMSD - December 2017 - 48
VMSD - December 2017 - 49
VMSD - December 2017 - 50
VMSD - December 2017 - 51
VMSD - December 2017 - 52
VMSD - December 2017 - 53
VMSD - December 2017 - Ad Index
VMSD - December 2017 - 55
VMSD - December 2017 - Checking Out
VMSD - December 2017 - Cover3
VMSD - December 2017 - Cover4
https://www.nxtbook.com/nxtbooks/STMG/vmsd_202010
https://www.nxtbook.com/nxtbooks/STMG/vmsd_202009
https://www.nxtbook.com/nxtbooks/STMG/vmsd_20200708
https://www.nxtbook.com/nxtbooks/STMG/vmsd_20200506
https://www.nxtbook.com/nxtbooks/STMG/vmsd_20200304
https://www.nxtbook.com/nxtbooks/STMG/vmsd_201802
https://www.nxtbook.com/nxtbooks/STMG/vmsd_201801
https://www.nxtbook.com/nxtbooks/STMG/vmsd_201712
https://www.nxtbook.com/nxtbooks/STMG/vmsd_201711
https://www.nxtbook.com/nxtbooks/STMG/vmsd_201710
https://www.nxtbook.com/nxtbooks/STMG/vmsd_201709
https://www.nxtbook.com/nxtbooks/STMG/vmsd_201708
https://www.nxtbook.com/nxtbooks/STMG/vmsd_201707
https://www.nxtbook.com/nxtbooks/STMG/vmsd_201706
https://www.nxtbook.com/nxtbooks/STMG/vmsd_201705
https://www.nxtbook.com/nxtbooks/STMG/vmsd_201704
https://www.nxtbook.com/nxtbooks/STMG/vmsd_201703
https://www.nxtbook.com/nxtbooks/STMG/vmsd_201702
https://www.nxtbook.com/nxtbooks/STMG/vmsd_201701
https://www.nxtbook.com/nxtbooks/STMG/vmsd_201612
https://www.nxtbook.com/nxtbooks/STMG/vmsd_201611
https://www.nxtbook.com/nxtbooks/STMG/vmsd_201610
https://www.nxtbook.com/nxtbooks/STMG/vmsd_201609
https://www.nxtbook.com/nxtbooks/STMG/vmsd_201608
https://www.nxtbook.com/nxtbooks/STMG/vmsd_201607
https://www.nxtbook.com/nxtbooks/STMG/vmsd_201606
https://www.nxtbook.com/nxtbooks/STMG/vmsd_201605
https://www.nxtbook.com/nxtbooks/STMG/vmsd_201604
https://www.nxtbook.com/nxtbooks/STMG/vmsd_201603
https://www.nxtbook.com/nxtbooks/STMG/vmsd_201602
https://www.nxtbook.com/nxtbooks/STMG/vmsd_201601
https://www.nxtbook.com/nxtbooks/STMG/vmsd_201512
https://www.nxtbook.com/nxtbooks/STMG/vmsd_201511
https://www.nxtbook.com/nxtbooks/STMG/vmsd_201510
https://www.nxtbook.com/nxtbooks/STMG/vmsd_201509
https://www.nxtbook.com/nxtbooks/STMG/vmsd_201508
https://www.nxtbook.com/nxtbooks/STMG/vmsd_201507
https://www.nxtbook.com/nxtbooks/STMG/vmsd_201506
https://www.nxtbook.com/nxtbooks/STMG/vmsd_201505
https://www.nxtbook.com/nxtbooks/STMG/vmsd_201504
https://www.nxtbook.com/nxtbooks/STMG/vmsd_201503
https://www.nxtbook.com/nxtbooks/STMG/vmsd_201502
https://www.nxtbook.com/nxtbooks/STMG/vmsd_201501
https://www.nxtbook.com/nxtbooks/STMG/vmsd_201412
https://www.nxtbook.com/nxtbooks/STMG/vmsd_201411
https://www.nxtbook.com/nxtbooks/STMG/vmsd_201410
https://www.nxtbook.com/nxtbooks/STMG/vmsd_201409
https://www.nxtbook.com/nxtbooks/STMG/vmsd_201408
https://www.nxtbook.com/nxtbooks/STMG/vmsd_201407
https://www.nxtbook.com/nxtbooks/STMG/vmsd_201406
https://www.nxtbook.com/nxtbooks/STMG/vmsd_201405
https://www.nxtbook.com/nxtbooks/STMG/vmsd_201404
https://www.nxtbook.com/nxtbooks/STMG/vmsd_201403
https://www.nxtbook.com/nxtbooks/STMG/vmsd_201402
https://www.nxtbook.com/nxtbooks/STMG/vmsd_201401
https://www.nxtbook.com/nxtbooks/STMG/vmsd_201312
https://www.nxtbook.com/nxtbooks/STMG/vmsd_201311
https://www.nxtbook.com/nxtbooks/STMG/vmsd_201310
https://www.nxtbook.com/nxtbooks/STMG/vmsd_201309
https://www.nxtbook.com/nxtbooks/STMG/vmsd_201308
https://www.nxtbook.com/nxtbooks/STMG/vmsd_201307
https://www.nxtbook.com/nxtbooks/STMG/vmsd_201306
https://www.nxtbook.com/nxtbooks/STMG/vmsd_201305
https://www.nxtbook.com/nxtbooks/STMG/vmsd_201304
https://www.nxtbook.com/nxtbooks/STMG/vmsd_201303
https://www.nxtbook.com/nxtbooks/STMG/vmsd_201302
https://www.nxtbook.com/nxtbooks/STMG/vmsd_201301
https://www.nxtbook.com/nxtbooks/STMG/vmsd_201212
https://www.nxtbook.com/nxtbooks/STMG/vmsd_201211
https://www.nxtbook.com/nxtbooks/STMG/vmsd_201210
https://www.nxtbook.com/nxtbooks/STMG/vmsd_201209
https://www.nxtbook.com/nxtbooks/STMG/vmsd_201208
https://www.nxtbook.com/nxtbooks/STMG/vmsd_201207
https://www.nxtbook.com/nxtbooks/STMG/vmsd_201206
https://www.nxtbook.com/nxtbooks/STMG/vmsd_201205
https://www.nxtbook.com/nxtbooks/STMG/vmsd_201204
https://www.nxtbook.com/nxtbooks/STMG/vmsd_201203
https://www.nxtbook.com/nxtbooks/STMG/vmsd_201202
https://www.nxtbook.com/nxtbooks/STMG/vmsd_201201
https://www.nxtbook.com/nxtbooks/STMG/vmsd_201112
https://www.nxtbook.com/nxtbooks/STMG/vmsd_201111
https://www.nxtbook.com/nxtbooks/STMG/vmsd_201110
https://www.nxtbook.com/nxtbooks/STMG/vmsd_201109
https://www.nxtbook.com/nxtbooks/STMG/vmsd_201108
https://www.nxtbook.com/nxtbooks/STMG/vmsd_201107
https://www.nxtbook.com/nxtbooks/STMG/vmsd_201106
https://www.nxtbook.com/nxtbooks/STMG/vmsd_201105
https://www.nxtbookmedia.com