Engineering Inc. - July/August 2008 - (Page 26) MULTI-PROJECT FEATURE The Minnesota Department of Transportation awarded a $234 million contract to rebuild the I-35W St. Anthony Falls Bridge. Rebuilding In the Face of Tragedy Linda Figg PROJECT: I-35W St. Anthony Falls Bridge, Minneapolis FIRM: T 26 FIGG Engineering Group, Tallahassee, Fla. wo months after the terrifying I-35W bridge collapse in Minneapolis on Aug. 1, 2007, the Minnesota Department of Transportation (Mn/DOT) awarded a $234 million design-build contract to the joint venture of Longmont, Colo.–based Flatiron Construction Corporation and Manson Construction Co., Inc., of Seattle, for the bridge’s ENGINEERING INC. replacement. Tallahassee, Fla.–based FIGG Engineering Group is the engineer of record responsible for bridge design, providing quality assurance on-site during construction and managing the overall engineering team, including the general civil engineer and roadway design firm, the geotechnical analysis company, the landscape architects and the aesthetic lighting company. “The project’s goal is to design a bridge for the future that is constructed for safety, sustainability and aesthetics,” says Linda Figg, the firm’s president and CEO. Her firm is charged with designing and overseeing construction of a bridge 1,223 feet long and 189 feet wide with a 100-year projected lifespan, capable of carrying 10 lanes of traffic and supporting future light-rail transportation. In addition, the bridge must maximize openness and green space and provide new opportunities for recreation and reflection. Similar projects usually require four to five years to complete. FIGG has no such luxury. Mn/DOT has determined that the temporary loss of this vital interstate connector over the Mississippi River will have a negative economic impact resulting in business losses of $400,000 to $1 million a day. With those figures in mind, officials have set a target project completion deadline of Dec. 24, 2008. “It took an intense team effort to accomplish the design quickly with multiple levels of quality control that ensure long-term safety and sustainability,” says Figg of the project, which is now under construction. The site has many unique challenges that required special design considerations, including alignment geom- etry to ensure that the vertical and horizontal profiles of the bridge align with and enhance the existing approach roadways, foundation configurations and construction techniques. Other design issues include a site under the bridge where dredged river soil is deposited, two large storm water outfalls, a historic wall that must be preserved and a railroad track. “All of these challenges are being met with a special emphasis on multiple levels of structural redundancy, low maintenance and a design that provides a high-tech, high-performance concrete bridge,” explains Figg. JULY / AUGUST 2008
Table of Contents Feed for the Digital Edition of Engineering Inc. - July/August 2008 Engineering Inc. - July/August 2008 Table of Contents From ACEC to You News & Notes Market Watch Legislative Action Congressman Kendrick Meek Going Global 2008 Professional Liability Insurance Survey Bridging the Gap 2008 Convention Wrap Up 2008-2009 Executive Committee 2008 Fall Conference Primer Business Insights Members in the News One on One Engineering Inc. - July/August 2008 Engineering Inc. - July/August 2008 - Table of Contents (Page 1) Engineering Inc. - July/August 2008 - From ACEC to You (Page 2) Engineering Inc. - July/August 2008 - From ACEC to You (Page 3) Engineering Inc. - July/August 2008 - News & Notes (Page 4) Engineering Inc. - July/August 2008 - Market Watch (Page 5) Engineering Inc. - July/August 2008 - Legislative Action (Page 6) Engineering Inc. - July/August 2008 - Legislative Action (Page 7) Engineering Inc. - July/August 2008 - Congressman Kendrick Meek (Page 8) Engineering Inc. - July/August 2008 - Congressman Kendrick Meek (Page 9) Engineering Inc. - July/August 2008 - Congressman Kendrick Meek (Page 10) Engineering Inc. - July/August 2008 - Congressman Kendrick Meek (Page 11) Engineering Inc. - July/August 2008 - Going Global (Page 12) Engineering Inc. - July/August 2008 - Going Global (Page 13) Engineering Inc. - July/August 2008 - Going Global (Page 14) Engineering Inc. - July/August 2008 - Going Global (Page 15) Engineering Inc. - July/August 2008 - Going Global (Page 16) Engineering Inc. - July/August 2008 - Going Global (Page 17) Engineering Inc. - July/August 2008 - Going Global (Page 18) Engineering Inc. - July/August 2008 - 2008 Professional Liability Insurance Survey (Page 19) Engineering Inc. - July/August 2008 - 2008 Professional Liability Insurance Survey (Page 20) Engineering Inc. - July/August 2008 - 2008 Professional Liability Insurance Survey (Page 21) Engineering Inc. - July/August 2008 - 2008 Professional Liability Insurance Survey (Page 22) Engineering Inc. - July/August 2008 - 2008 Professional Liability Insurance Survey (Page 23) Engineering Inc. - July/August 2008 - Bridging the Gap (Page 24) Engineering Inc. - July/August 2008 - Bridging the Gap (Page 25) Engineering Inc. - July/August 2008 - Bridging the Gap (Page 26) Engineering Inc. - July/August 2008 - Bridging the Gap (Page 27) Engineering Inc. - July/August 2008 - Bridging the Gap (Page 28) Engineering Inc. - July/August 2008 - Bridging the Gap (Page 29) Engineering Inc. - July/August 2008 - 2008 Convention Wrap Up (Page 30) Engineering Inc. - July/August 2008 - 2008 Convention Wrap Up (Page 31) Engineering Inc. - July/August 2008 - 2008 Convention Wrap Up (Page 32) Engineering Inc. - July/August 2008 - 2008 Convention Wrap Up (Page 33) Engineering Inc. - July/August 2008 - 2008-2009 Executive Committee (Page 34) Engineering Inc. - July/August 2008 - 2008-2009 Executive Committee (Page 35) Engineering Inc. - July/August 2008 - 2008 Fall Conference Primer (Page 36) Engineering Inc. - July/August 2008 - 2008 Fall Conference Primer (Page 37) Engineering Inc. - July/August 2008 - Business Insights (Page 38) Engineering Inc. - July/August 2008 - Members in the News (Page 39) Engineering Inc. - July/August 2008 - Members in the News (Page 40) Engineering Inc. - July/August 2008 - Members in the News (Page 41) Engineering Inc. - July/August 2008 - Members in the News (Page 42) Engineering Inc. - July/August 2008 - Members in the News (Page 43) Engineering Inc. - July/August 2008 - One on One (Page 44) Engineering Inc. - July/August 2008 - One on One (Page 45) Engineering Inc. - July/August 2008 - One on One (Page 46) Engineering Inc. - July/August 2008 - One on One (Page 47) Engineering Inc. - July/August 2008 - One on One (Page 48) Engineering Inc. - July/August 2008 - One on One (Page 49) Engineering Inc. - July/August 2008 - One on One (Page 50) Engineering Inc. - July/August 2008 - One on One (Page 51) Engineering Inc. - July/August 2008 - One on One (Page 52) Engineering Inc. - July/August 2008 - One on One (Page 53) Engineering Inc. - July/August 2008 - One on One (Page 54) Engineering Inc. - July/August 2008 - One on One (Page 55) Engineering Inc. - July/August 2008 - One on One (Page 56) Engineering Inc. - July/August 2008 - One on One (Page 57) Engineering Inc. - July/August 2008 - One on One (Page 58) Engineering Inc. - July/August 2008 - One on One (Page 59) Engineering Inc. - July/August 2008 - One on One (Page 60) Engineering Inc. - July/August 2008 - One on One (Page 61) Engineering Inc. - July/August 2008 - One on One (Page 62) Engineering Inc. - July/August 2008 - One on One (Page 63) Engineering Inc. - July/August 2008 - One on One (Page 64) Engineering Inc. - July/August 2008 - One on One (Page 65) Engineering Inc. - July/August 2008 - One on One (Page 66) Engineering Inc. - July/August 2008 - One on One (Page 67) Engineering Inc. - July/August 2008 - One on One (Page 68) Engineering Inc. - July/August 2008 - One on One (Page 69) Engineering Inc. - July/August 2008 - One on One (Page 70) Engineering Inc. - July/August 2008 - One on One (Page 71) Engineering Inc. - July/August 2008 - One on One (Page 72) Engineering Inc. - July/August 2008 - One on One (Page 73) Engineering Inc. - July/August 2008 - One on One (Page 74) Engineering Inc. - July/August 2008 - One on One (Page 75) Engineering Inc. - July/August 2008 - One on One (Page 76) Engineering Inc. - July/August 2008 - One on One (Page 77) Engineering Inc. - July/August 2008 - One on One (Page 78) Engineering Inc. - July/August 2008 - One on One (Page 79) Engineering Inc. - July/August 2008 - One on One (Page 80)
For optimal viewing of this digital publication, please enable JavaScript and then refresh the page. If you would like to try to load the digital publication without using Flash Player detection, please click here.