Houseboating Adventures - Issue 17 - (Page 32) A B C D Left, top to bottom: The restoration begins with the walkways (A) , back deck (B), kitchen area (C), master bedroom (D), May sanding and caulking the interior hull (E), and painting the top deck (F). Above: The finished main salon and below, the master bedroom. Right top: The beautifully finished galley. Right lower: The completed master bathroom. All in all, the Penfold’s invested $75,00 and 8months doing renovation work, restoring the original teak structure and refitting the interior to make it livable. E F )6B@" A05("%C&5AB9&@
For optimal viewing of this digital publication, please enable JavaScript and then refresh the page. If you would like to try to load the digital publication without using Flash Player detection, please click here.