ASHRAE Journal- September 2008 - (Page 26) Lab Unit System With Heat Recovery Units Temperature Bin 102 97 92 87 82 77 72 67 62 57 52 47 42 37 32 27 22 17 12 7 2 –3 Heat Recovery Temperature (°F) 88.3 85.0 82.6 80.5 78.7 77.0 72.0 67.0 62.0 57.0 52.0 51.0 50.8 49.7 48.0 45.9 42.5 39.1 35.7 32.3 28.9 25.5 Total Gallons Per Year: 879,336.8 Enthalpy Btu/lb Air + Moisture 33.01 34.39 35.07 34.01 33.09 33.10 31.50 27.76 24.40 21.37 OA HR 0.01125 0.01223 0.01378 0.01322 0.01265 0.01307 0.01293 0.01083 0.00921 0.00921 13 136 487 423 311 276 255 243 249 228 166 79 33 13 7 1 1 Time of Day 01 – 08 09 – 16 1 17 103 254 370 353 301 262 248 234 213 200 158 108 57 23 8 3 2 3 32 113 229 350 413 301 286 263 241 222 201 135 80 32 10 7 17 – 24 Supply HR 0.00921 0.00921 0.00921 0.00921 0.00921 0.00921 0.00921 0.00921 0.00921 0.00921 Gallons 132.1 3,917.3 39,970.5 95,286.9 136,596.5 210,192.3 289,942.0 103,299.2 0.0 Table 1: Condensate recovery (Emory Winship Cancer Institute 3/19/2004). This can be achieved via three methods: reducing the actual cooling load, using nonoutside air sources, and creative air distribution. Reducing the actual cooling load in the laboratory is an excellent first step to achieve air-side savings. With smaller loads, a smaller HVAC system may be used, reducing not only energy use but also the capital cost, materials, and energy to install the system. When reducing the actual cooling load, there are some items that are relevant in any building and others that are laboratory facility specific. The general building issues take an added importance in the laboratory due to the hours of operation and the typical use of 100% outside air for supply. Building envelope, especially fenestration and shading, should be carefully considered. Daylighting, using natural light to illuminate a space and reduce electric light use, is a common laboratory feature3 (Photo 1). Reducing the overall illumination levels and using task lighting at work surfaces can also reduce the actual cooling load. With careful architectural design and fenestration selection, heat gain from the envelope and lighting can be reduced. 26 ASHRAE Journal A laboratory specific issue is rightsizing the system. Often laboratory facilities, in the absence of specific criteria, are constructed with a high allowance for user equipment, such as 10 W/ft2 or 15 W/ft2 (108 W/m2 or 161 W/m2). This is done based on historical practice and for flexibility. Research by the Lawrence Berkeley National Laboratory4 suggests that actual equipment loads in laboratories are typically lower, resulting in oversized systems and energy waste. Although designers should meet the user’s criteria and provide the desired flexibility, we should also evaluate what is actually required without undue excess. Variable air volume (VAV) systems should also be used when possible to reduce the laboratory system cooling load by reducing supply airflow to match laboratory space load. While inappropriate for some spaces, such as high containment facilities, VAV is appropriate for many facilities, including those with highly variable cooling loads, low fixed equipment exhaust requirements and low minimum air change rates, and spaces with a high fume hood density.5 ANSI/ASHRAE/IESNA Standard 90.1-2004, Energy Standard for Buildings Except Low-Rise Residential Buildings, Section 6.5.6.1, requires either ashrae.org September 2008 http://ashrae.org
Table of Contents Feed for the Digital Edition of ASHRAE Journal- September 2008 ASHRAE Journal- September 2008 Section: Contents Contents Section: Commentary Options for Sustainability Section: Industry News The Silk Route for Energy Solar Thermal Is Unrealized Opportunity Industry Groups Sue City of Albuquerque Section: Letters Letters Section: Meetings and Shows Meetings and Shows Section: Feature Articles Article-Radiant Floor Cooling Systems Article-HVAC Design for Sustainable Lab Article-Mixed Mode Ventilation Article-Single- Design Considerations For Active Chilled Beams Article-Acoustic Design In Green Buildings Article-Teams, Contracts & BIM Section: Building Sciences Some Old Lessons Distilled Section: Washington Report Energy in Federal Buildings Section: Products HVAC&R Product Showplace Section: Emerging Technologies Toplighting & Lighting Controls For Commercial Buildings Section: Special Products Fans & Blowers Section: Classified Ads Classified Ads Section: Advertising Index Advertising Index ASHRAE Journal- September 2008 ASHRAE Journal- September 2008 - (Page Cover1) ASHRAE Journal- September 2008 - (Page Cover2) ASHRAE Journal- September 2008 - ASHRAE Journal- September 2008 (Page 1) ASHRAE Journal- September 2008 - ASHRAE Journal- September 2008 (Page 2) ASHRAE Journal- September 2008 - Contents (Page 3) ASHRAE Journal- September 2008 - Contents (Page 4) ASHRAE Journal- September 2008 - Options for Sustainability (Page 5) ASHRAE Journal- September 2008 - The Silk Route for Energy (Page 6) ASHRAE Journal- September 2008 - The Silk Route for Energy (Page 7) ASHRAE Journal- September 2008 - The Silk Route for Energy (Page 8) ASHRAE Journal- September 2008 - The Silk Route for Energy (Page 9) ASHRAE Journal- September 2008 - The Silk Route for Energy (Page 10) ASHRAE Journal- September 2008 - Industry Groups Sue City of Albuquerque (Page 11) ASHRAE Journal- September 2008 - Letters (Page 12) ASHRAE Journal- September 2008 - Letters (Page 13) ASHRAE Journal- September 2008 - Meetings and Shows (Page 14) ASHRAE Journal- September 2008 - Meetings and Shows (Page 15) ASHRAE Journal- September 2008 - Article-Radiant Floor Cooling Systems (Page 16) ASHRAE Journal- September 2008 - Article-Radiant Floor Cooling Systems (Page 17) ASHRAE Journal- September 2008 - Article-Radiant Floor Cooling Systems (Page 18) ASHRAE Journal- September 2008 - Article-Radiant Floor Cooling Systems (Page 19) ASHRAE Journal- September 2008 - Article-Radiant Floor Cooling Systems (Page 20) ASHRAE Journal- September 2008 - Article-Radiant Floor Cooling Systems (Page 21) ASHRAE Journal- September 2008 - Article-Radiant Floor Cooling Systems (Page 22) ASHRAE Journal- September 2008 - Article-Radiant Floor Cooling Systems (Page 23) ASHRAE Journal- September 2008 - Article-HVAC Design for Sustainable Lab (Page 24) ASHRAE Journal- September 2008 - Article-HVAC Design for Sustainable Lab (Page 25) ASHRAE Journal- September 2008 - Article-HVAC Design for Sustainable Lab (Page 26) ASHRAE Journal- September 2008 - Article-HVAC Design for Sustainable Lab (Page 27) ASHRAE Journal- September 2008 - Article-HVAC Design for Sustainable Lab (Page 28) ASHRAE Journal- September 2008 - Article-HVAC Design for Sustainable Lab (Page 29) ASHRAE Journal- September 2008 - Article-HVAC Design for Sustainable Lab (Page 30) ASHRAE Journal- September 2008 - Article-HVAC Design for Sustainable Lab (Page 31) ASHRAE Journal- September 2008 - Article-HVAC Design for Sustainable Lab (Page 32) ASHRAE Journal- September 2008 - Article-HVAC Design for Sustainable Lab (Page 33) ASHRAE Journal- September 2008 - Article-HVAC Design for Sustainable Lab (Page 34) ASHRAE Journal- September 2008 - Article-HVAC Design for Sustainable Lab (Page 35) ASHRAE Journal- September 2008 - Article-Mixed Mode Ventilation (Page 36) ASHRAE Journal- September 2008 - Article-Mixed Mode Ventilation (Page 37) ASHRAE Journal- September 2008 - Article-Mixed Mode Ventilation (Page 38) ASHRAE Journal- September 2008 - Article-Mixed Mode Ventilation (Page 39) ASHRAE Journal- September 2008 - Article-Mixed Mode Ventilation (Page 40) ASHRAE Journal- September 2008 - Article-Mixed Mode Ventilation (Page 41) ASHRAE Journal- September 2008 - Article-Mixed Mode Ventilation (Page 42) ASHRAE Journal- September 2008 - Article-Mixed Mode Ventilation (Page 43) ASHRAE Journal- September 2008 - Article-Mixed Mode Ventilation (Page 44) ASHRAE Journal- September 2008 - Article-Mixed Mode Ventilation (Page 45) ASHRAE Journal- September 2008 - Article-Mixed Mode Ventilation (Page 46) ASHRAE Journal- September 2008 - Article-Mixed Mode Ventilation (Page 47) ASHRAE Journal- September 2008 - Article-Mixed Mode Ventilation (Page 48) ASHRAE Journal- September 2008 - Article-Mixed Mode Ventilation (Page 49) ASHRAE Journal- September 2008 - Article-Single- Design Considerations For Active Chilled Beams (Page 50) ASHRAE Journal- September 2008 - Article-Single- Design Considerations For Active Chilled Beams (Page 51) ASHRAE Journal- September 2008 - Article-Single- Design Considerations For Active Chilled Beams (Page 52) ASHRAE Journal- September 2008 - Article-Single- Design Considerations For Active Chilled Beams (Page 53) ASHRAE Journal- September 2008 - Article-Single- Design Considerations For Active Chilled Beams (Page 54) ASHRAE Journal- September 2008 - Article-Single- Design Considerations For Active Chilled Beams (Page 55) ASHRAE Journal- September 2008 - Article-Single- Design Considerations For Active Chilled Beams (Page 56) ASHRAE Journal- September 2008 - Article-Single- Design Considerations For Active Chilled Beams (Page 57) ASHRAE Journal- September 2008 - Article-Single- Design Considerations For Active Chilled Beams (Page 58) ASHRAE Journal- September 2008 - Article-Single- Design Considerations For Active Chilled Beams (Page 59) ASHRAE Journal- September 2008 - Article-Acoustic Design In Green Buildings (Page 60) ASHRAE Journal- September 2008 - Article-Acoustic Design In Green Buildings (Page 61) ASHRAE Journal- September 2008 - Article-Acoustic Design In Green Buildings (Page 62) ASHRAE Journal- September 2008 - Article-Acoustic Design In Green Buildings (Page 63) ASHRAE Journal- September 2008 - Article-Acoustic Design In Green Buildings (Page 64) ASHRAE Journal- September 2008 - Article-Acoustic Design In Green Buildings (Page 65) ASHRAE Journal- September 2008 - Article-Acoustic Design In Green Buildings (Page 66) ASHRAE Journal- September 2008 - Article-Acoustic Design In Green Buildings (Page 67) ASHRAE Journal- September 2008 - Article-Acoustic Design In Green Buildings (Page 68) ASHRAE Journal- September 2008 - Article-Acoustic Design In Green Buildings (Page 69) ASHRAE Journal- September 2008 - Article-Acoustic Design In Green Buildings (Page 70) ASHRAE Journal- September 2008 - Article-Acoustic Design In Green Buildings (Page 71) ASHRAE Journal- September 2008 - Article-Teams, Contracts & BIM (Page 72) ASHRAE Journal- September 2008 - Article-Teams, Contracts & BIM (Page 73) ASHRAE Journal- September 2008 - Article-Teams, Contracts & BIM (Page 74) ASHRAE Journal- September 2008 - Article-Teams, Contracts & BIM (Page 75) ASHRAE Journal- September 2008 - Article-Teams, Contracts & BIM (Page 76) ASHRAE Journal- September 2008 - Article-Teams, Contracts & BIM (Page 77) ASHRAE Journal- September 2008 - Article-Teams, Contracts & BIM (Page 78) ASHRAE Journal- September 2008 - Article-Teams, Contracts & BIM (Page 79) ASHRAE Journal- September 2008 - Article-Teams, Contracts & BIM (Page 80) ASHRAE Journal- September 2008 - Article-Teams, Contracts & BIM (Page 81) ASHRAE Journal- September 2008 - Some Old Lessons Distilled (Page 82) ASHRAE Journal- September 2008 - Some Old Lessons Distilled (Page 83) ASHRAE Journal- September 2008 - Some Old Lessons Distilled (Page 84) ASHRAE Journal- September 2008 - Some Old Lessons Distilled (Page 85) ASHRAE Journal- September 2008 - Some Old Lessons Distilled (Page 86) ASHRAE Journal- September 2008 - Some Old Lessons Distilled (Page 87) ASHRAE Journal- September 2008 - Energy in Federal Buildings (Page 88) ASHRAE Journal- September 2008 - Energy in Federal Buildings (Page 89) ASHRAE Journal- September 2008 - HVAC&R Product Showplace (Page 90) ASHRAE Journal- September 2008 - HVAC&R Product Showplace (Page 91) ASHRAE Journal- September 2008 - Toplighting & Lighting Controls For Commercial Buildings (Page 92) ASHRAE Journal- September 2008 - Toplighting & Lighting Controls For Commercial Buildings (Page 93) ASHRAE Journal- September 2008 - Toplighting & Lighting Controls For Commercial Buildings (Page 94) ASHRAE Journal- September 2008 - Toplighting & Lighting Controls For Commercial Buildings (Page 95) ASHRAE Journal- September 2008 - Toplighting & Lighting Controls For Commercial Buildings (Page 96) ASHRAE Journal- September 2008 - Toplighting & Lighting Controls For Commercial Buildings (Page 97) ASHRAE Journal- September 2008 - Fans & Blowers (Page 98) ASHRAE Journal- September 2008 - Fans & Blowers (Page 99) ASHRAE Journal- September 2008 - Fans & Blowers (Page 100) ASHRAE Journal- September 2008 - Classified Ads (Page 101) ASHRAE Journal- September 2008 - Classified Ads (Page 102) ASHRAE Journal- September 2008 - Classified Ads (Page 103) ASHRAE Journal- September 2008 - Advertising Index (Page 104) ASHRAE Journal- September 2008 - Advertising Index (Page Cover3) ASHRAE Journal- September 2008 - Advertising Index (Page Cover4)
For optimal viewing of this digital publication, please enable JavaScript and then refresh the page. If you would like to try to load the digital publication without using Flash Player detection, please click here.