ASHRAE Journal- September 2008 - (Page 58) Non-POE Refrigeration Oil for HFC Equipment out C h e c k it e ebs our w for o r c a ll FREE E! SAMPL Benefits Compatible with all HFC refrigerants R134a, R404A, R407C, R410A, etc. No Hydrolysis unlike POE (Polyolester) lubricants No reaction with water! PVE bond energy enhances anti-wear effectiveness Anti-wear effectiveness is enhanced when compared to POE Better solubility with process fluids Capillary Tube Blockage Superior resistance due to lack of hydrolysis Possible to eliminate HVAC systems filter dryer Traditionally, the ventilation ductwork for a VAV system is sized for maximum cooling and minimum ventilation rates. The VAV damper controlling the airflow into the occupied zone for ACBs can be sized for the greatest of either the ventilation air or the air volume required to control the latent cooling requirements. As the duct velocities are too low to support traditional VAV damper control, a more effective and stable control methodology is required. The static pressure at the chilled beam plenum can be used as the velocity pressure input signal to modulate the position of the VAV valve for fan energy savings, and is particularly effective at managing highly variable latent loads. Care must be exercised to monitor the return air CO2 levels to ensure that the space is not underventilated. Additionally, a dew-point sensor on the chilled water supply line is necessary to give priority control of the ventilation air in the event that the latent load exceeded the limits of the dehumidification effect offered via the primary air supply. Night setback, chilled water, hot water, and primary air reset are all effective strategies in mitigating operational costs. These should be considered a fundamental aspect of building control, given their relatively low-cost-to-benefit ratio. Maintenance Current Customers Carrier ● Daikin ● Hitachi LG Electronics ● Panasonic Sanyo ● Tecumseh and more In a properly designed ACB project, the coil surfaces will not condense. The fins of the unit mounted coils will remain dry, and will not become tacky. Although not true for every space, maintenance vacuuming can be as infrequent as once every three to five years. Additionally, since the fin surfaces of an ACB are relatively well gapped, dust and dirt particles tend not to bridge the fin surfaces. ACBs equipped with rubber nozzles may need to be replaced as a result of dry rot within their service life. Maintenance is nearly a nonissue with active chilled beams and can be used to address a variety of challenging applications. Summary Although they are not the solution for every space within commercial and institutional buildings, the strengths of active chilled beams are becoming a more useful tool to handle challenging spaces in today’s high performance buildings. The difficulty of meeting comfort requirements with a mechanical system that is exceedingly transparent is becoming easier thanks to the growing popularity of decoupled ventilation systems and active chilled beams. References Idemitsu Lubricants America Corporation 2000 Town Center • Suite 1450 • Southfield, MI 48075 phone: fax: (248) 355-0666 (248) 355-9337 For product and purchase inquiries, visit our website: PVE-Idemitsu-usa.com www.info.hotims.com/19354-31 1. Rumsey, P. 2007. “Chilled beams in labs: eliminating reheat and saving energy on a budget.” ASHRAE Journal 49(1):18 – 25. 2. Feustel, H. 1994. “Hydronic radiant cooling systems.” Center for Building Science News. Berkeley, Calif.: Lawrence Berkeley National Laboratory (3). 3. Butler, D., et al. 2007. Chilled Beam Application Guidebook, second ed. Belguim: REHVA. 4. Zboril, V., et al. “Air flow distribution in rooms with chilled beams.” Proceedings of Roomvent 2007. September 2008 58 ASHRAE Journal http://PVE-Idemitsu-usa.com http://PVE-Idemitsu-usa.com http://www.info.hotims.com/19354-31
Table of Contents Feed for the Digital Edition of ASHRAE Journal- September 2008 ASHRAE Journal- September 2008 Section: Contents Contents Section: Commentary Options for Sustainability Section: Industry News The Silk Route for Energy Solar Thermal Is Unrealized Opportunity Industry Groups Sue City of Albuquerque Section: Letters Letters Section: Meetings and Shows Meetings and Shows Section: Feature Articles Article-Radiant Floor Cooling Systems Article-HVAC Design for Sustainable Lab Article-Mixed Mode Ventilation Article-Single- Design Considerations For Active Chilled Beams Article-Acoustic Design In Green Buildings Article-Teams, Contracts & BIM Section: Building Sciences Some Old Lessons Distilled Section: Washington Report Energy in Federal Buildings Section: Products HVAC&R Product Showplace Section: Emerging Technologies Toplighting & Lighting Controls For Commercial Buildings Section: Special Products Fans & Blowers Section: Classified Ads Classified Ads Section: Advertising Index Advertising Index ASHRAE Journal- September 2008 ASHRAE Journal- September 2008 - (Page Cover1) ASHRAE Journal- September 2008 - (Page Cover2) ASHRAE Journal- September 2008 - ASHRAE Journal- September 2008 (Page 1) ASHRAE Journal- September 2008 - ASHRAE Journal- September 2008 (Page 2) ASHRAE Journal- September 2008 - Contents (Page 3) ASHRAE Journal- September 2008 - Contents (Page 4) ASHRAE Journal- September 2008 - Options for Sustainability (Page 5) ASHRAE Journal- September 2008 - The Silk Route for Energy (Page 6) ASHRAE Journal- September 2008 - The Silk Route for Energy (Page 7) ASHRAE Journal- September 2008 - The Silk Route for Energy (Page 8) ASHRAE Journal- September 2008 - The Silk Route for Energy (Page 9) ASHRAE Journal- September 2008 - The Silk Route for Energy (Page 10) ASHRAE Journal- September 2008 - Industry Groups Sue City of Albuquerque (Page 11) ASHRAE Journal- September 2008 - Letters (Page 12) ASHRAE Journal- September 2008 - Letters (Page 13) ASHRAE Journal- September 2008 - Meetings and Shows (Page 14) ASHRAE Journal- September 2008 - Meetings and Shows (Page 15) ASHRAE Journal- September 2008 - Article-Radiant Floor Cooling Systems (Page 16) ASHRAE Journal- September 2008 - Article-Radiant Floor Cooling Systems (Page 17) ASHRAE Journal- September 2008 - Article-Radiant Floor Cooling Systems (Page 18) ASHRAE Journal- September 2008 - Article-Radiant Floor Cooling Systems (Page 19) ASHRAE Journal- September 2008 - Article-Radiant Floor Cooling Systems (Page 20) ASHRAE Journal- September 2008 - Article-Radiant Floor Cooling Systems (Page 21) ASHRAE Journal- September 2008 - Article-Radiant Floor Cooling Systems (Page 22) ASHRAE Journal- September 2008 - Article-Radiant Floor Cooling Systems (Page 23) ASHRAE Journal- September 2008 - Article-HVAC Design for Sustainable Lab (Page 24) ASHRAE Journal- September 2008 - Article-HVAC Design for Sustainable Lab (Page 25) ASHRAE Journal- September 2008 - Article-HVAC Design for Sustainable Lab (Page 26) ASHRAE Journal- September 2008 - Article-HVAC Design for Sustainable Lab (Page 27) ASHRAE Journal- September 2008 - Article-HVAC Design for Sustainable Lab (Page 28) ASHRAE Journal- September 2008 - Article-HVAC Design for Sustainable Lab (Page 29) ASHRAE Journal- September 2008 - Article-HVAC Design for Sustainable Lab (Page 30) ASHRAE Journal- September 2008 - Article-HVAC Design for Sustainable Lab (Page 31) ASHRAE Journal- September 2008 - Article-HVAC Design for Sustainable Lab (Page 32) ASHRAE Journal- September 2008 - Article-HVAC Design for Sustainable Lab (Page 33) ASHRAE Journal- September 2008 - Article-HVAC Design for Sustainable Lab (Page 34) ASHRAE Journal- September 2008 - Article-HVAC Design for Sustainable Lab (Page 35) ASHRAE Journal- September 2008 - Article-Mixed Mode Ventilation (Page 36) ASHRAE Journal- September 2008 - Article-Mixed Mode Ventilation (Page 37) ASHRAE Journal- September 2008 - Article-Mixed Mode Ventilation (Page 38) ASHRAE Journal- September 2008 - Article-Mixed Mode Ventilation (Page 39) ASHRAE Journal- September 2008 - Article-Mixed Mode Ventilation (Page 40) ASHRAE Journal- September 2008 - Article-Mixed Mode Ventilation (Page 41) ASHRAE Journal- September 2008 - Article-Mixed Mode Ventilation (Page 42) ASHRAE Journal- September 2008 - Article-Mixed Mode Ventilation (Page 43) ASHRAE Journal- September 2008 - Article-Mixed Mode Ventilation (Page 44) ASHRAE Journal- September 2008 - Article-Mixed Mode Ventilation (Page 45) ASHRAE Journal- September 2008 - Article-Mixed Mode Ventilation (Page 46) ASHRAE Journal- September 2008 - Article-Mixed Mode Ventilation (Page 47) ASHRAE Journal- September 2008 - Article-Mixed Mode Ventilation (Page 48) ASHRAE Journal- September 2008 - Article-Mixed Mode Ventilation (Page 49) ASHRAE Journal- September 2008 - Article-Single- Design Considerations For Active Chilled Beams (Page 50) ASHRAE Journal- September 2008 - Article-Single- Design Considerations For Active Chilled Beams (Page 51) ASHRAE Journal- September 2008 - Article-Single- Design Considerations For Active Chilled Beams (Page 52) ASHRAE Journal- September 2008 - Article-Single- Design Considerations For Active Chilled Beams (Page 53) ASHRAE Journal- September 2008 - Article-Single- Design Considerations For Active Chilled Beams (Page 54) ASHRAE Journal- September 2008 - Article-Single- Design Considerations For Active Chilled Beams (Page 55) ASHRAE Journal- September 2008 - Article-Single- Design Considerations For Active Chilled Beams (Page 56) ASHRAE Journal- September 2008 - Article-Single- Design Considerations For Active Chilled Beams (Page 57) ASHRAE Journal- September 2008 - Article-Single- Design Considerations For Active Chilled Beams (Page 58) ASHRAE Journal- September 2008 - Article-Single- Design Considerations For Active Chilled Beams (Page 59) ASHRAE Journal- September 2008 - Article-Acoustic Design In Green Buildings (Page 60) ASHRAE Journal- September 2008 - Article-Acoustic Design In Green Buildings (Page 61) ASHRAE Journal- September 2008 - Article-Acoustic Design In Green Buildings (Page 62) ASHRAE Journal- September 2008 - Article-Acoustic Design In Green Buildings (Page 63) ASHRAE Journal- September 2008 - Article-Acoustic Design In Green Buildings (Page 64) ASHRAE Journal- September 2008 - Article-Acoustic Design In Green Buildings (Page 65) ASHRAE Journal- September 2008 - Article-Acoustic Design In Green Buildings (Page 66) ASHRAE Journal- September 2008 - Article-Acoustic Design In Green Buildings (Page 67) ASHRAE Journal- September 2008 - Article-Acoustic Design In Green Buildings (Page 68) ASHRAE Journal- September 2008 - Article-Acoustic Design In Green Buildings (Page 69) ASHRAE Journal- September 2008 - Article-Acoustic Design In Green Buildings (Page 70) ASHRAE Journal- September 2008 - Article-Acoustic Design In Green Buildings (Page 71) ASHRAE Journal- September 2008 - Article-Teams, Contracts & BIM (Page 72) ASHRAE Journal- September 2008 - Article-Teams, Contracts & BIM (Page 73) ASHRAE Journal- September 2008 - Article-Teams, Contracts & BIM (Page 74) ASHRAE Journal- September 2008 - Article-Teams, Contracts & BIM (Page 75) ASHRAE Journal- September 2008 - Article-Teams, Contracts & BIM (Page 76) ASHRAE Journal- September 2008 - Article-Teams, Contracts & BIM (Page 77) ASHRAE Journal- September 2008 - Article-Teams, Contracts & BIM (Page 78) ASHRAE Journal- September 2008 - Article-Teams, Contracts & BIM (Page 79) ASHRAE Journal- September 2008 - Article-Teams, Contracts & BIM (Page 80) ASHRAE Journal- September 2008 - Article-Teams, Contracts & BIM (Page 81) ASHRAE Journal- September 2008 - Some Old Lessons Distilled (Page 82) ASHRAE Journal- September 2008 - Some Old Lessons Distilled (Page 83) ASHRAE Journal- September 2008 - Some Old Lessons Distilled (Page 84) ASHRAE Journal- September 2008 - Some Old Lessons Distilled (Page 85) ASHRAE Journal- September 2008 - Some Old Lessons Distilled (Page 86) ASHRAE Journal- September 2008 - Some Old Lessons Distilled (Page 87) ASHRAE Journal- September 2008 - Energy in Federal Buildings (Page 88) ASHRAE Journal- September 2008 - Energy in Federal Buildings (Page 89) ASHRAE Journal- September 2008 - HVAC&R Product Showplace (Page 90) ASHRAE Journal- September 2008 - HVAC&R Product Showplace (Page 91) ASHRAE Journal- September 2008 - Toplighting & Lighting Controls For Commercial Buildings (Page 92) ASHRAE Journal- September 2008 - Toplighting & Lighting Controls For Commercial Buildings (Page 93) ASHRAE Journal- September 2008 - Toplighting & Lighting Controls For Commercial Buildings (Page 94) ASHRAE Journal- September 2008 - Toplighting & Lighting Controls For Commercial Buildings (Page 95) ASHRAE Journal- September 2008 - Toplighting & Lighting Controls For Commercial Buildings (Page 96) ASHRAE Journal- September 2008 - Toplighting & Lighting Controls For Commercial Buildings (Page 97) ASHRAE Journal- September 2008 - Fans & Blowers (Page 98) ASHRAE Journal- September 2008 - Fans & Blowers (Page 99) ASHRAE Journal- September 2008 - Fans & Blowers (Page 100) ASHRAE Journal- September 2008 - Classified Ads (Page 101) ASHRAE Journal- September 2008 - Classified Ads (Page 102) ASHRAE Journal- September 2008 - Classified Ads (Page 103) ASHRAE Journal- September 2008 - Advertising Index (Page 104) ASHRAE Journal- September 2008 - Advertising Index (Page Cover3) ASHRAE Journal- September 2008 - Advertising Index (Page Cover4)
For optimal viewing of this digital publication, please enable JavaScript and then refresh the page. If you would like to try to load the digital publication without using Flash Player detection, please click here.