Ashrae Journal - October 2008 - (Page HQ10) Mark Brandli, design principal/Richard Wittschiebe Hand Some 900 square feet of Cherokee White marble slabs donated by Brandli is being used on the wet wall locations in the restrooms at Headquarters. Quarried around 1965, the panels were reclaimed from a 2004 Atlanta office building renovation. Since landfill costs prohibited disposal, some 5,000 square feet of marble was salvaged and reused in numerous Atlanta area projects from 2004 to 2008. Commissioning & Green Building Solutions (CxGBS) Inc. Holistic Commissioning™ Using this integrated process results in a fully functional, fine-tuned facility with complete documentation of its systems and assemblies and trained operating and maintenance personnel. The commissioning process can reduce the cost of construction as well as the life-cycle cost of the building and increase the comfort and productivity of the occupants. http://www.aircuity.com http://www.aircuity.com
Table of Contents Feed for the Digital Edition of Ashrae Journal - October 2008 Ashrae Journal - October 2008
For optimal viewing of this digital publication, please enable JavaScript and then refresh the page. If you would like to try to load the digital publication without using Flash Player detection, please click here.