ASHRAE Journal - January 2010 - 16

for preventive maintenance or component replacement are difficult to maintain and typically perform poorly. BOD narratives should describe how the design provides for maintenance access to the building system elements of building envelope, lighting fixture lamps and major HVAC component replacement, etc. Owners and operators cannot manage what they do not measure or recognize degradation of performance when it occurs. Measurements must be sufficiently granular to provide enough information to effectively identify optimum performance or the lack of performance without costing too much. For example, dividing electrical loads up by load type and metering each load separately; providing water meters for the main facility, landscaping, and cooling tower (if applicable); measuring natural gas consumption via a meter or energy data provided by a central plant; combined with data from the building’s automation systems typically provides the variables necessary to analyze and assess overall facility performance. Measurability in smaller facilities is generally limited to electronic data collected from the utility meters and segregated electrical loads. The size and complexity of a facility dictates the number of commissioning design reviews required. Typically, most projects have three to four reviews, with the schematic design phase being the most important. During these reviews, changes in concepts, reconsideration of established goals and additions or reductions of requirements are easily considered and implemented within the project’s budget and schedule. Modification of scope after schematic design probably will increase cost and schedule. Cost control requires good coordination and a clearly defined scope in contract documents. Clear details and strong design coordination combined with the objectives and criteria established in the OPR and BOD are the main focus of design phase commissioning. Commissioning quality assurance design reviews compare the documentation provided by the designers (BOD, drawings, and specifications) to the OPR and identify when the high level goals are not being met. The reviews assist the team with identifying disconnects and resolving problems to bring the design into compliance or to modify the OPR as directed by the owner. Well-executed design phase commissioning minimizes risk, contractor requests for information, architect supplemental instructions, change orders, and maintenance and performance issues. After the development of the OPR, the CxA performs the role of project advocate by providing design phase checklists, establishing information to be provided at each design milestone, conducting reviews to identify issues and then Testing of exterior door identifying moisture intrusion issue. Moisture intrusion; Compromised service access; Negative pressurization of portions of the building; Comfort problems; Incorrect installation of building envelope and HVAC duct insulation; • Rainwater drainage problems; • Lighting fixture design; and • Building automation control of lighting, HVAC and irrigation. The AMBFO, completed in 2004, was the first LEED Gold certified building in Georgia and the first LEED Gold certified office building in the southeast. The building performed as intended, exceeding Standard 90.1-1999 by 35% in energy efficiency and by 26% in reducing potable water consumption while providing occupants positive physiological and psychological perceptions. 16 ASHRAE Journal Solution as result of testing exterior door to protect wood floor. The most important aspect of this case study is the post occupancy improvement in energy efficiency through the efforts of ongoing monitoring, commissioning, reliabilitycentered maintenance and modification to operations. The AMBFO increased energy efficiency by an additional 5%, resulting in energy performance that exceeds Standard 90.1 by 40%. When the end goals of sustainability are clarified in the predesign phase, documented, measured and verified throughout the design and construction process, project goals can be achieved with only minor initial cost impact to the budget. Quality is a team effort and even the most diligent and thorough commissioning process cannot be successful without the cooperation of the entire project team. Ongoing measurement and review by the CxA over the life of the facility provides the continuity to ensure high building performance. ashrae.org January 2010 • • • • •

ASHRAE Journal - January 2010

Table of Contents for the Digital Edition of ASHRAE Journal - January 2010

ASHRAE Journal - January 2010
Contents
Commentary
Industry News
Letters
Meetings and Shows
Commissioning High Performance Buildings
Sustainability in Cold Climates
Back to Basics: Duct Design Fundamentals
History of Radiant Heating & Cooling Systems, Part 1
Capturing Condensate by Retrofitting AHUs
Washington Report
Building Sciences
Emerging Technologies
Classified Advertising
Advertisers Index
ASHRAE Journal - January 2010 - Intro
ASHRAE Journal - January 2010 - ASHRAE Journal - January 2010
ASHRAE Journal - January 2010 - Cover2
ASHRAE Journal - January 2010 - 1
ASHRAE Journal - January 2010 - 2
ASHRAE Journal - January 2010 - Contents
ASHRAE Journal - January 2010 - 4
ASHRAE Journal - January 2010 - Commentary
ASHRAE Journal - January 2010 - Industry News
ASHRAE Journal - January 2010 - 7
ASHRAE Journal - January 2010 - 8
ASHRAE Journal - January 2010 - Letters
ASHRAE Journal - January 2010 - Meetings and Shows
ASHRAE Journal - January 2010 - 11
ASHRAE Journal - January 2010 - Commissioning High Performance Buildings
ASHRAE Journal - January 2010 - 13
ASHRAE Journal - January 2010 - 14
ASHRAE Journal - January 2010 - 15
ASHRAE Journal - January 2010 - 16
ASHRAE Journal - January 2010 - 17
ASHRAE Journal - January 2010 - 18
ASHRAE Journal - January 2010 - 19
ASHRAE Journal - January 2010 - Sustainability in Cold Climates
ASHRAE Journal - January 2010 - 21
ASHRAE Journal - January 2010 - 22
ASHRAE Journal - January 2010 - 23
ASHRAE Journal - January 2010 - 24
ASHRAE Journal - January 2010 - 25
ASHRAE Journal - January 2010 - 26
ASHRAE Journal - January 2010 - 27
ASHRAE Journal - January 2010 - 28
ASHRAE Journal - January 2010 - 29
ASHRAE Journal - January 2010 - Back to Basics: Duct Design Fundamentals
ASHRAE Journal - January 2010 - 31
ASHRAE Journal - January 2010 - 32
ASHRAE Journal - January 2010 - ME1
ASHRAE Journal - January 2010 - ME2
ASHRAE Journal - January 2010 - ME3
ASHRAE Journal - January 2010 - ME4
ASHRAE Journal - January 2010 - ME5
ASHRAE Journal - January 2010 - ME6
ASHRAE Journal - January 2010 - ME7
ASHRAE Journal - January 2010 - ME8
ASHRAE Journal - January 2010 - 33
ASHRAE Journal - January 2010 - 34
ASHRAE Journal - January 2010 - 35
ASHRAE Journal - January 2010 - 36
ASHRAE Journal - January 2010 - 37
ASHRAE Journal - January 2010 - 38
ASHRAE Journal - January 2010 - 39
ASHRAE Journal - January 2010 - History of Radiant Heating & Cooling Systems, Part 1
ASHRAE Journal - January 2010 - 41
ASHRAE Journal - January 2010 - 42
ASHRAE Journal - January 2010 - 43
ASHRAE Journal - January 2010 - 44
ASHRAE Journal - January 2010 - 45
ASHRAE Journal - January 2010 - 46
ASHRAE Journal - January 2010 - 47
ASHRAE Journal - January 2010 - Capturing Condensate by Retrofitting AHUs
ASHRAE Journal - January 2010 - 49
ASHRAE Journal - January 2010 - 50
ASHRAE Journal - January 2010 - 51
ASHRAE Journal - January 2010 - 52
ASHRAE Journal - January 2010 - 53
ASHRAE Journal - January 2010 - 54
ASHRAE Journal - January 2010 - 55
ASHRAE Journal - January 2010 - Washington Report
ASHRAE Journal - January 2010 - Building Sciences
ASHRAE Journal - January 2010 - 58
ASHRAE Journal - January 2010 - 59
ASHRAE Journal - January 2010 - 60
ASHRAE Journal - January 2010 - 61
ASHRAE Journal - January 2010 - 62
ASHRAE Journal - January 2010 - 63
ASHRAE Journal - January 2010 - Emerging Technologies
ASHRAE Journal - January 2010 - 65
ASHRAE Journal - January 2010 - 66
ASHRAE Journal - January 2010 - 67
ASHRAE Journal - January 2010 - Classified Advertising
ASHRAE Journal - January 2010 - 69
ASHRAE Journal - January 2010 - 70
ASHRAE Journal - January 2010 - Advertisers Index
ASHRAE Journal - January 2010 - 72
ASHRAE Journal - January 2010 - Cover3
ASHRAE Journal - January 2010 - Cover4
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_MCDEBX
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_WNYSQY
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_XATVOD
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_FJSHSS
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_CCBZDS
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_XDEFVG
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2023november_v2
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2023november
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_VHGNBL
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_WPKBNJ
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_UUVCDE
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_RTGDEW
https://www.nxtbook.com/nxtbooks/ashrae/ashraemexico_2023
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_LKRFXS
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_AZSOFG
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_ERCDBH
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_QWDFRV
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_JHGVDF
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_OPUYHG
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_SREIBM
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_LRTGLK
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_OKRFGH
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2022november_v2
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2022november
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_TZSERA
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_LVRUIX
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_RPTVYZ
https://www.nxtbook.com/nxtbooks/ashrae/mini_pub_catalog
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_XIYTGD
https://www.nxtbook.com/nxtbooks/ashrae/ashraemexico_2022
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_RFGDOB
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_PABXNU
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_REMKLS
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_PICVBT
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_AOYTVW
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_JQOPLS
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_IOYTBC
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_SGAJJF
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_IGHYER
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_PDRKLS
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2021november
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2021november_v2
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_XCODFR
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_QSLFGO
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_ILKVNM
https://www.nxtbook.com/nxtbooks/ashrae/ashraemexico_2021
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_OPDJKD
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_VJKSRY
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_SDHUTC
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_JPPKRR
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_SDLTTH
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_CKLLES
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_SLDOX
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_HJETUK
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_OLUHGE
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2020october
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2020october_v2
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_ZERDGH
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_QVMNEO
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_RTPOKE
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_BBATRE
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_STUBMW
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_TPEMPE
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_JNMKDS
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_FBTTPA
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_WQMMNE
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_TVBRYN
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_showguide2020
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_KTUZMA
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_ABEDGD
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201910
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201909
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2019septmeber_v2
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2019september
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201908
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201907
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201906
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201905
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201904
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_2019april
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201903
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_2019march
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201902
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201901
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_showguide2019
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_2018december
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_2018november
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2018fall_v2
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2018fall
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_2018october
https://www.nxtbook.com/nxtbooks/ashrae/ashraemexico_2018
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201810
https://www.nxtbook.com/nxtbooks/ashrae/ashraeinsights_201806
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201805
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201804
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201803
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201712
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201711
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201710
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2017fall_v2
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2017fall
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201709
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201705
https://www.nxtbook.com/nxtbooks/ashrae/ashrae_meetinginsert_201610
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2016fall_v2
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2016fall
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_acrexindia
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2015summer_v2
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2015summer
https://www.nxtbook.com/nxtbooks/amca/2014summer2
https://www.nxtbook.com/nxtbooks/amca/2014summer
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_acma_2014summer
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201311
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201309
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_acmasupp_2013fall
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201305
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201303
https://www.nxtbook.com/nxtbooks/ashrae/pubcatalog_2013winter
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201211
https://www.nxtbook.com/nxtbooks/ashrae/achr_expo_mexico2012
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201209
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201208_v3
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201208_v2
https://www.nxtbook.com/nxtbooks/ashrae/pubcatalog_2012summer
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201205
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201203
https://www.nxtbook.com/nxtbooks/ashrae/pubcatalog_2012winter
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201111_v2
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201109_v2
https://www.nxtbook.com/nxtbooks/ashrae/pubcatalog_2011summer
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201105
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201103
https://www.nxtbookmedia.com