ASHRAE Journal - February 2011 - 48

Power Requirements
Keep in mind that wireless does not always equate to “no power required.” Wireless-enabled building automation controllers and wireless repeaters require some form of ac power. Electrical costs also are associated with the installation of wireless repeaters in a wireless BAS. Consider the battery life in wireless sensors used in any project. Most battery-powered wireless sensors available in today’s marketplace provide a four to five year battery life and use inexpensive “off-the-shelf ” batteries. Note that most sensors provide automatic notification when batteries are running low. Keep in mind that simple devices such as switches and sensors can use energy harvesting for batteryless operation.

Preparing for a Wireless Installation
All installations begin in the engineering office and use mechanical drawings and information about tenant use. By knowing how tenants use the space, the engineering team can recommend a solution that provides the most flexibility. Existing buildings that will be retrofitted can benefit greatly from a site inspection with survey tools to do point-to-point checks. Engineers should consider the life-cycle changes in a building. Wireless communication should not take place between floors because, in many instances, system designers cannot control what is in place on the floors above or below. For ex-

ample, a building occupant may move a metal filing cabinet to another location, which could block the signal to a wireless device on an adjacent floor. Most wireless systems have published communications distances between wireless devices and built-in radio frequency signal strength indicators. This information is useful for sight surveys, as well as during and after installation. Whether wireless, wired, or hybrid, it is best to get all of the stakeholders involved early in the process to understand their expectations and objectives. Engineers and contractors need to know what systems are already within an existing building or are planned for new construction. Engage with a BAS integrator early in the process to ensure that the system design meets business objectives. Wireless networks are in a position to replace wired networks in most building systems applications. The demand to monitor equipment for increased efficiencies is a driving need for wireless applications. Today’s top-to-bottom wireless building automation systems connect across multiple networks’ levels, supervisory devices, equipment controllers, room temperature sensors, and a host of other communicating building devices. Wireless technology can be incorporated at one level or all levels of a BAS infrastructure. This provides control flexibility, streamlines retrofits and results in faster installation times.

48	

ASHRAE	Journal	

www.info.hotims.com/33861-48

	

	

February	 2011



ASHRAE Journal - February 2011

Table of Contents for the Digital Edition of ASHRAE Journal - February 2011

ASHRAE Journal - February 2011
Contents
Commentary
Industry News
Letters
Meetings and Shows
Feature Articles
Thermal Coupling of Cooling and Heating Systems
10 Common Problems in Energy Audits
Hall of Fame Feature: History of the Changing Concepts in Ventilation Requirements
A Guide to Wireless Technologies
Building Sciences
Solar NZEB Project
Emerging Technologies
People
Special Section
InfoCenter
Commissioning
Products
Washington Report
Classified Advertising
Advertisers Index
ASHRAE Journal - February 2011 - ASHRAE Journal - February 2011
ASHRAE Journal - February 2011 - Cover2
ASHRAE Journal - February 2011 - 1
ASHRAE Journal - February 2011 - 2
ASHRAE Journal - February 2011 - Contents
ASHRAE Journal - February 2011 - Commentary
ASHRAE Journal - February 2011 - 5
ASHRAE Journal - February 2011 - Industry News
ASHRAE Journal - February 2011 - 7
ASHRAE Journal - February 2011 - Letters
ASHRAE Journal - February 2011 - 9
ASHRAE Journal - February 2011 - 10
ASHRAE Journal - February 2011 - 11
ASHRAE Journal - February 2011 - 12
ASHRAE Journal - February 2011 - 13
ASHRAE Journal - February 2011 - 14
ASHRAE Journal - February 2011 - 15
ASHRAE Journal - February 2011 - Meetings and Shows
ASHRAE Journal - February 2011 - 17
ASHRAE Journal - February 2011 - Thermal Coupling of Cooling and Heating Systems
ASHRAE Journal - February 2011 - 19
ASHRAE Journal - February 2011 - 20
ASHRAE Journal - February 2011 - 21
ASHRAE Journal - February 2011 - 22
ASHRAE Journal - February 2011 - 23
ASHRAE Journal - February 2011 - 24
ASHRAE Journal - February 2011 - 25
ASHRAE Journal - February 2011 - 10 Common Problems in Energy Audits
ASHRAE Journal - February 2011 - 27
ASHRAE Journal - February 2011 - 28
ASHRAE Journal - February 2011 - 29
ASHRAE Journal - February 2011 - 30
ASHRAE Journal - February 2011 - 31
ASHRAE Journal - February 2011 - 32
ASHRAE Journal - February 2011 - 33
ASHRAE Journal - February 2011 - Hall of Fame Feature: History of the Changing Concepts in Ventilation Requirements
ASHRAE Journal - February 2011 - 35
ASHRAE Journal - February 2011 - 36
ASHRAE Journal - February 2011 - 37
ASHRAE Journal - February 2011 - 38
ASHRAE Journal - February 2011 - 39
ASHRAE Journal - February 2011 - 40
ASHRAE Journal - February 2011 - 41
ASHRAE Journal - February 2011 - 42
ASHRAE Journal - February 2011 - 43
ASHRAE Journal - February 2011 - A Guide to Wireless Technologies
ASHRAE Journal - February 2011 - 45
ASHRAE Journal - February 2011 - 46
ASHRAE Journal - February 2011 - 47
ASHRAE Journal - February 2011 - 48
ASHRAE Journal - February 2011 - 49
ASHRAE Journal - February 2011 - Building Sciences
ASHRAE Journal - February 2011 - 51
ASHRAE Journal - February 2011 - 52
ASHRAE Journal - February 2011 - 53
ASHRAE Journal - February 2011 - 54
ASHRAE Journal - February 2011 - 55
ASHRAE Journal - February 2011 - 56
ASHRAE Journal - February 2011 - 57
ASHRAE Journal - February 2011 - 58
ASHRAE Journal - February 2011 - 59
ASHRAE Journal - February 2011 - 60
ASHRAE Journal - February 2011 - 61
ASHRAE Journal - February 2011 - Solar NZEB Project
ASHRAE Journal - February 2011 - 63
ASHRAE Journal - February 2011 - 64
ASHRAE Journal - February 2011 - 65
ASHRAE Journal - February 2011 - 66
ASHRAE Journal - February 2011 - 67
ASHRAE Journal - February 2011 - 68
ASHRAE Journal - February 2011 - 69
ASHRAE Journal - February 2011 - Emerging Technologies
ASHRAE Journal - February 2011 - 71
ASHRAE Journal - February 2011 - 72
ASHRAE Journal - February 2011 - 73
ASHRAE Journal - February 2011 - 74
ASHRAE Journal - February 2011 - 75
ASHRAE Journal - February 2011 - People
ASHRAE Journal - February 2011 - 77
ASHRAE Journal - February 2011 - InfoCenter
ASHRAE Journal - February 2011 - 79
ASHRAE Journal - February 2011 - 80
ASHRAE Journal - February 2011 - 81
ASHRAE Journal - February 2011 - 82
ASHRAE Journal - February 2011 - 83
ASHRAE Journal - February 2011 - 84
ASHRAE Journal - February 2011 - 85
ASHRAE Journal - February 2011 - Commissioning
ASHRAE Journal - February 2011 - 87
ASHRAE Journal - February 2011 - 88
ASHRAE Journal - February 2011 - 89
ASHRAE Journal - February 2011 - 90
ASHRAE Journal - February 2011 - Products
ASHRAE Journal - February 2011 - Washington Report
ASHRAE Journal - February 2011 - Classified Advertising
ASHRAE Journal - February 2011 - 94
ASHRAE Journal - February 2011 - 95
ASHRAE Journal - February 2011 - Advertisers Index
ASHRAE Journal - February 2011 - Cover3
ASHRAE Journal - February 2011 - Cover4
http://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201910
http://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201909
http://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2019septmeber_v2
http://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2019september
http://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201908
http://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201907
http://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201906
http://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201905
http://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201904
http://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_2019april
http://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201903
http://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_2019march
http://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201902
http://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201901
http://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_showguide2019
http://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_2018december
http://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_2018november
http://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2018fall_v2
http://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2018fall
http://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_2018october
http://www.nxtbook.com/nxtbooks/ashrae/ashraemexico_2018
http://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201810
http://www.nxtbook.com/nxtbooks/ashrae/ashraeinsights_201806
http://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201805
http://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201804
http://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201803
http://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201712
http://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201711
http://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201710
http://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2017fall_v2
http://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2017fall
http://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201709
http://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201705
http://www.nxtbook.com/nxtbooks/ashrae/ashrae_meetinginsert_201610
http://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2016fall_v2
http://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2016fall
http://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_acrexindia
http://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2015summer_v2
http://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2015summer
http://www.nxtbook.com/nxtbooks/amca/2014summer2
http://www.nxtbook.com/nxtbooks/amca/2014summer
http://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_acma_2014summer
http://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201311
http://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201309
http://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_acmasupp_2013fall
http://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201305
http://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201303
http://www.nxtbook.com/nxtbooks/ashrae/pubcatalog_2013winter
http://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201211
http://www.nxtbook.com/nxtbooks/ashrae/achr_expo_mexico2012
http://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201209
http://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201208_v3
http://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201208_v2
http://www.nxtbook.com/nxtbooks/ashrae/pubcatalog_2012summer
http://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201205
http://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201203
http://www.nxtbook.com/nxtbooks/ashrae/pubcatalog_2012winter
http://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201111_v2
http://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201109_v2
http://www.nxtbook.com/nxtbooks/ashrae/pubcatalog_2011summer
http://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201105
http://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201103
http://www.nxtbookMEDIA.com