for tripped breakers, which expose them to arc flashes and other dangers. Meters also eliminate guesswork and save time by quickly pinpointing problems.

New vs. Existing Buildings
In a new building, design engineers have an opportunity to assess and specify the latest technologies. The staff is unencumbered by existing systems, but will need training on the new metering system. New metering systems offer interoperability with other systems (such as energy management systems and building management systems) because engineers can design them to operate on platforms based on open standards. In addition, a new installation requires all new energy meters and possibly a separate network to process the data from these meters. As a result, the initial investment is greater than it would be to just add points to an existing system. In an existing building, installing additional energy monitoring points may reduce overall costs because the equipment and network are already in place. However, equipment interoperability may become an issue when adding new points. If an existing power monitoring system operates smoothly, it offers proven, known value. System expansion, however, may be complicated by the need to install system-compatible metering points. The use of noncompatible metering devices could lead to limited functionality (e.g., one brand of meter data management software may not be able to read the advanced registers in a different brand of meters).

ally billing them for their energy use—can be an effective way to promote energy conservation and help control costs. Intelligent metering systems enable building owners to take advantage of demand management opportunities (e.g., utility company incentives to prechill a building or reduce energy consumption during peak periods) and to calculate needs based on historical records. They also validate energy conservation measures, enabling design engineers or building engineers to build a business case for purchasing new equipment or modifying an existing system.

Justifying the Cost of a Metering System
Not every facility warrants a metering system, and a simple way to cost-justify a utility meter was developed by the U.S. Department of Energy:
   Installed Cost  + Annual Cost      Minimum Annual  Desired Simple Payback   =  Electric Bi ll % Annual Savings

Goals of Energy Metering
The rationale for installing energy meters is twofold: to control energy consumption/costs and to improve equipment energy use/reliability.

where Installed Cost is the total cost to purchase, install and commission the meter. Desired Simple Payback represents the number of years it will take the metering system to produce the cost savings equal to the installed cost. In the federal sector, the simple payback period should be 10 years or less. Annual Cost is the total annual cost of the fees and expenses to cover communications, data collection and storage, data analysis, as well as meter operations and maintenance. Percent Annual Savings is the estimated cost savings benefits to be realized from the productive use of the metered data (typically a minimum of 2%).

Controlling Energy Consumption and Costs
The savings realized by a metering program depend largely on the actions taken with the meter data. Estimates of energy savings have ranged from 1% to 20%, depending on the application of the metering systems (Table 1). The low-end savings of 0% to 2% is generally attributed to the “Hawthorne Effect,” a phenomenon whereby individual behaviors may be altered as a result of the individuals knowing that they are being studied. These savings quickly erode if the occupants realize that the meter data is not being used. To maximize energy savings, the meter data must be used to drive action. Managing equipment based on real-time needs helps maximize the efficiency of building equipment and systems. For instance, turning off certain equipment after-hours will conserve energy and eliminate unnecessary costs associated with operations and maintenance. Time of use or load shifting impacts energy use by staggering when systems start and when they perform certain operations (e.g., precooling a building during off-peak periods). Allocating costs based on consumption—whether the information simply raises awareness among users rather than actuApril 2011

Improving Equipment Use and Reliability
Modern mechanical systems (e.g., chillers, compressors, VFDs, lighting ballasts) generally rely on advanced electronics for their control and operation. Because electronics are sensitive to power quality, mechanical systems may be adversely affected by over- and under-voltage, surges, spikes, transients and harmonics. Advanced submetering systems detect these damaging, power quality events and alert system operators so they can take remedial action before damage occurs. Building and design engineers can improve equipment use by accurately measuring how much equipment and electrical capacity are required for optimum building operation. “Right sizing” mechanical and electrical systems enables engineers to not only improve system efficiencies, but also to better manage utility costs and possibly delay capital expenditures for replacement or expansion systems until absolutely necessary.

Specifying the Right Meter
Energy travels from a utility company’s power supply into a facility’s electrical distribution (ED) system, with the energy handoff occurring at a “service entrance.” In a large commercial building, the service entrance typically sends the high-voltage
ASHRAE Journal 21



ASHRAE Journal - April 2011

Table of Contents for the Digital Edition of ASHRAE Journal - April 2011

ASHRAE Journal - April 2011
Contents
Commentary
Industry News
Letters
Meetings and Shows
Feature Articles
Making the Case for Energy Metering
BIM Test at ASHRAE HQ
Technology Award Case Studies: Adaptive Reuse for Clinics
Earthquake: New Codes Provide Tools, But We Need to Ensure Compliance
Controlling Corrosion in Marine Refrigeration Systems
Solar NZEB Project
Emerging Technologies
IAQ Applications
Washington Report
Products
Special Products
Classified Advertising
Advertisers Index
ASHRAE Journal - April 2011 - Intro
ASHRAE Journal - April 2011 - ASHRAE Journal - April 2011
ASHRAE Journal - April 2011 - Cover2
ASHRAE Journal - April 2011 - 1
ASHRAE Journal - April 2011 - 2
ASHRAE Journal - April 2011 - Contents
ASHRAE Journal - April 2011 - Commentary
ASHRAE Journal - April 2011 - 5
ASHRAE Journal - April 2011 - Industry News
ASHRAE Journal - April 2011 - 7
ASHRAE Journal - April 2011 - 8
ASHRAE Journal - April 2011 - 9
ASHRAE Journal - April 2011 - 10
ASHRAE Journal - April 2011 - 11
ASHRAE Journal - April 2011 - 12
ASHRAE Journal - April 2011 - 13
ASHRAE Journal - April 2011 - 14
ASHRAE Journal - April 2011 - 15
ASHRAE Journal - April 2011 - Letters
ASHRAE Journal - April 2011 - 17a
ASHRAE Journal - April 2011 - 17b
ASHRAE Journal - April 2011 - 17
ASHRAE Journal - April 2011 - Meetings and Shows
ASHRAE Journal - April 2011 - 19
ASHRAE Journal - April 2011 - Making the Case for Energy Metering
ASHRAE Journal - April 2011 - 21
ASHRAE Journal - April 2011 - 22
ASHRAE Journal - April 2011 - 23
ASHRAE Journal - April 2011 - 24
ASHRAE Journal - April 2011 - 25
ASHRAE Journal - April 2011 - 26
ASHRAE Journal - April 2011 - 27
ASHRAE Journal - April 2011 - BIM Test at ASHRAE HQ
ASHRAE Journal - April 2011 - 29
ASHRAE Journal - April 2011 - 30
ASHRAE Journal - April 2011 - 31
ASHRAE Journal - April 2011 - 32
ASHRAE Journal - April 2011 - 33
ASHRAE Journal - April 2011 - 34
ASHRAE Journal - April 2011 - 35
ASHRAE Journal - April 2011 - 36
ASHRAE Journal - April 2011 - 37
ASHRAE Journal - April 2011 - Technology Award Case Studies: Adaptive Reuse for Clinics
ASHRAE Journal - April 2011 - 39
ASHRAE Journal - April 2011 - 40
ASHRAE Journal - April 2011 - 41
ASHRAE Journal - April 2011 - 42
ASHRAE Journal - April 2011 - 43
ASHRAE Journal - April 2011 - Earthquake: New Codes Provide Tools, But We Need to Ensure Compliance
ASHRAE Journal - April 2011 - 45
ASHRAE Journal - April 2011 - 46
ASHRAE Journal - April 2011 - 47
ASHRAE Journal - April 2011 - 48
ASHRAE Journal - April 2011 - 49
ASHRAE Journal - April 2011 - Controlling Corrosion in Marine Refrigeration Systems
ASHRAE Journal - April 2011 - 51
ASHRAE Journal - April 2011 - 52
ASHRAE Journal - April 2011 - 53
ASHRAE Journal - April 2011 - 54
ASHRAE Journal - April 2011 - 55
ASHRAE Journal - April 2011 - 56
ASHRAE Journal - April 2011 - 57
ASHRAE Journal - April 2011 - 58
ASHRAE Journal - April 2011 - 59
ASHRAE Journal - April 2011 - Solar NZEB Project
ASHRAE Journal - April 2011 - 61
ASHRAE Journal - April 2011 - 62
ASHRAE Journal - April 2011 - 63
ASHRAE Journal - April 2011 - 64
ASHRAE Journal - April 2011 - 65
ASHRAE Journal - April 2011 - Emerging Technologies
ASHRAE Journal - April 2011 - 67
ASHRAE Journal - April 2011 - 68
ASHRAE Journal - April 2011 - 69
ASHRAE Journal - April 2011 - IAQ Applications
ASHRAE Journal - April 2011 - 71
ASHRAE Journal - April 2011 - 72
ASHRAE Journal - April 2011 - 73
ASHRAE Journal - April 2011 - Washington Report
ASHRAE Journal - April 2011 - Products
ASHRAE Journal - April 2011 - Special Products
ASHRAE Journal - April 2011 - Classified Advertising
ASHRAE Journal - April 2011 - 78
ASHRAE Journal - April 2011 - 79
ASHRAE Journal - April 2011 - Advertisers Index
ASHRAE Journal - April 2011 - Cover3
ASHRAE Journal - April 2011 - Cover4
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_QJLWMC
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_MCDEBX
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_WNYSQY
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_XATVOD
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_FJSHSS
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_CCBZDS
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_XDEFVG
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2023november_v2
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2023november
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_VHGNBL
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_WPKBNJ
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_UUVCDE
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_RTGDEW
https://www.nxtbook.com/nxtbooks/ashrae/ashraemexico_2023
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_LKRFXS
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_AZSOFG
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_ERCDBH
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_QWDFRV
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_JHGVDF
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_OPUYHG
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_SREIBM
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_LRTGLK
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_OKRFGH
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2022november_v2
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2022november
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_TZSERA
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_LVRUIX
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_RPTVYZ
https://www.nxtbook.com/nxtbooks/ashrae/mini_pub_catalog
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_XIYTGD
https://www.nxtbook.com/nxtbooks/ashrae/ashraemexico_2022
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_RFGDOB
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_PABXNU
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_REMKLS
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_PICVBT
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_AOYTVW
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_JQOPLS
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_IOYTBC
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_SGAJJF
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_IGHYER
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_PDRKLS
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2021november
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2021november_v2
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_XCODFR
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_QSLFGO
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_ILKVNM
https://www.nxtbook.com/nxtbooks/ashrae/ashraemexico_2021
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_OPDJKD
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_VJKSRY
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_SDHUTC
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_JPPKRR
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_SDLTTH
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_CKLLES
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_SLDOX
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_HJETUK
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_OLUHGE
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2020october
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2020october_v2
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_ZERDGH
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_QVMNEO
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_RTPOKE
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_BBATRE
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_STUBMW
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_TPEMPE
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_JNMKDS
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_FBTTPA
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_WQMMNE
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_TVBRYN
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_showguide2020
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_KTUZMA
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_ABEDGD
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201910
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201909
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2019septmeber_v2
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2019september
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201908
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201907
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201906
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201905
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201904
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_2019april
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201903
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_2019march
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201902
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201901
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_showguide2019
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_2018december
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_2018november
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2018fall_v2
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2018fall
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_2018october
https://www.nxtbook.com/nxtbooks/ashrae/ashraemexico_2018
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201810
https://www.nxtbook.com/nxtbooks/ashrae/ashraeinsights_201806
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201805
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201804
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201803
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201712
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201711
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201710
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2017fall_v2
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2017fall
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201709
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201705
https://www.nxtbook.com/nxtbooks/ashrae/ashrae_meetinginsert_201610
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2016fall_v2
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2016fall
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_acrexindia
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2015summer_v2
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2015summer
https://www.nxtbook.com/nxtbooks/amca/2014summer2
https://www.nxtbook.com/nxtbooks/amca/2014summer
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_acma_2014summer
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201311
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201309
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_acmasupp_2013fall
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201305
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201303
https://www.nxtbook.com/nxtbooks/ashrae/pubcatalog_2013winter
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201211
https://www.nxtbook.com/nxtbooks/ashrae/achr_expo_mexico2012
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201209
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201208_v3
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201208_v2
https://www.nxtbook.com/nxtbooks/ashrae/pubcatalog_2012summer
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201205
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201203
https://www.nxtbook.com/nxtbooks/ashrae/pubcatalog_2012winter
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201111_v2
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201109_v2
https://www.nxtbook.com/nxtbooks/ashrae/pubcatalog_2011summer
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201105
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201103
https://www.nxtbookmedia.com