ASHRAE Journal - May 2011 - 50

Each local solenoid valve is powered open, fail closed. Natural gas is enabled by the instructor with a key switch at the local control panel. A push button at the local control panel disables natural gas use. If the space becomes unoccupied, natural gas service is disabled automatically after an adjustable time delay. A secondary solenoid valve is installed on the natural gas main that serves all of the laboratory spaces. This valve is enabled based on building occupancy schedule, but may be disabled during emergencies via a local push button switch in the laboratory stockroom. Careful planning during design minimized the building footprint while promoting passive energy saving strategies such as building orientation and daylighting. The location of the solar panel array encourages renewable energy while providing a shaded courtyard at the planetarium. HVAC systems, traditionally isolated between laboratories, classrooms, and offices, were combined to reduce energy and provide a well ventilated environment to all spaces. The simplified approach to laboratory controls reduces both first cost and energy use while promoting student safety. The Physical Sciences Building at Mesa Community College demonstrates that it is possible to build an energyefficient, environment-friendly, and safe facility on a limited

Select rooms function as classrooms or laboratories. A monitored wall switch enables a portable demonstration fume hood. budget. Success came from a coordinated effort among various disciplines. It is this integrated approach to design that develops the synergies needed to meet the project goals. We have found that many times the keys to success are readily available. We simply need to work together to achieve them.

When it has to be stainless, it has to be A-J!
The experts in stainless steel clean air systems for

operating rooms

plus: • Custom fabrication • Rush deliveries A-J Manufacturing offers a complete line of custom and standard stainless steel air distribution products, all designed and manufactured to offer durable, dependable and low maintenance performance necessary for hospitals, labs, wash down areas and more. What’s more, with our state-of-the-art manufacturing capabilities, we can also offer you the industry’s shortest lead times for custom orders. So for continuous linear, security grilles, modular diffusers and much more, contact A-J Manufacturing today!

A-J Manufacturing
800-247-5746 • www.ajmfg.com
www.info.hotims.com/33864-4 www.info.hotims.com/33864-36

50

ASHRAE Journal

May 2011



ASHRAE Journal - May 2011

Table of Contents for the Digital Edition of ASHRAE Journal - May 2011

ASHRAE Journal - May 2011
Contents
Commentary
Industry News
Letters
Meetings and Shows
Feature Articles
Seismic Restraint
Plug Load Design Factors
Technology Award Case Studies:
State-of-Art School
Green School Lab
Eco-Friendly, Affordable, School
Building Sciences
Special Section
InfoCenter
Solar NZEB Project
Emerging Technologies
IAQ Applications
Washington Report
International Column
Products
People
Classified Advertising
Advertisers Index
ASHRAE Journal - May 2011 - Intro
ASHRAE Journal - May 2011 - ASHRAE Journal - May 2011
ASHRAE Journal - May 2011 - Cover2
ASHRAE Journal - May 2011 - 1
ASHRAE Journal - May 2011 - 2
ASHRAE Journal - May 2011 - Contents
ASHRAE Journal - May 2011 - Commentary
ASHRAE Journal - May 2011 - 5
ASHRAE Journal - May 2011 - Industry News
ASHRAE Journal - May 2011 - 7
ASHRAE Journal - May 2011 - 8
ASHRAE Journal - May 2011 - 9
ASHRAE Journal - May 2011 - 10
ASHRAE Journal - May 2011 - 11
ASHRAE Journal - May 2011 - 12
ASHRAE Journal - May 2011 - 13
ASHRAE Journal - May 2011 - Letters
ASHRAE Journal - May 2011 - 15
ASHRAE Journal - May 2011 - 16
ASHRAE Journal - May 2011 - 16a
ASHRAE Journal - May 2011 - 16b
ASHRAE Journal - May 2011 - 17
ASHRAE Journal - May 2011 - Meetings and Shows
ASHRAE Journal - May 2011 - 19
ASHRAE Journal - May 2011 - Seismic Restraint
ASHRAE Journal - May 2011 - 21
ASHRAE Journal - May 2011 - 22
ASHRAE Journal - May 2011 - 23
ASHRAE Journal - May 2011 - 24
ASHRAE Journal - May 2011 - 25
ASHRAE Journal - May 2011 - 26
ASHRAE Journal - May 2011 - 27
ASHRAE Journal - May 2011 - 28
ASHRAE Journal - May 2011 - 29
ASHRAE Journal - May 2011 - Plug Load Design Factors
ASHRAE Journal - May 2011 - 31
ASHRAE Journal - May 2011 - 32
ASHRAE Journal - May 2011 - 33
ASHRAE Journal - May 2011 - 34
ASHRAE Journal - May 2011 - 35
ASHRAE Journal - May 2011 - State-of-Art School
ASHRAE Journal - May 2011 - 37
ASHRAE Journal - May 2011 - 38
ASHRAE Journal - May 2011 - 39
ASHRAE Journal - May 2011 - 40
ASHRAE Journal - May 2011 - 41
ASHRAE Journal - May 2011 - 42
ASHRAE Journal - May 2011 - 43
ASHRAE Journal - May 2011 - Green School Lab
ASHRAE Journal - May 2011 - 45
ASHRAE Journal - May 2011 - 46
ASHRAE Journal - May 2011 - 47
ASHRAE Journal - May 2011 - 48
ASHRAE Journal - May 2011 - 49
ASHRAE Journal - May 2011 - 50
ASHRAE Journal - May 2011 - 51
ASHRAE Journal - May 2011 - Eco-Friendly, Affordable, School
ASHRAE Journal - May 2011 - 53
ASHRAE Journal - May 2011 - 54
ASHRAE Journal - May 2011 - 55
ASHRAE Journal - May 2011 - 56
ASHRAE Journal - May 2011 - 57
ASHRAE Journal - May 2011 - Building Sciences
ASHRAE Journal - May 2011 - 59
ASHRAE Journal - May 2011 - 60
ASHRAE Journal - May 2011 - 61
ASHRAE Journal - May 2011 - 62
ASHRAE Journal - May 2011 - 63
ASHRAE Journal - May 2011 - 64
ASHRAE Journal - May 2011 - 65
ASHRAE Journal - May 2011 - 66
ASHRAE Journal - May 2011 - 67
ASHRAE Journal - May 2011 - InfoCenter
ASHRAE Journal - May 2011 - 69
ASHRAE Journal - May 2011 - 70
ASHRAE Journal - May 2011 - 71
ASHRAE Journal - May 2011 - 72
ASHRAE Journal - May 2011 - 73
ASHRAE Journal - May 2011 - 74
ASHRAE Journal - May 2011 - 75
ASHRAE Journal - May 2011 - 76
ASHRAE Journal - May 2011 - 77
ASHRAE Journal - May 2011 - Solar NZEB Project
ASHRAE Journal - May 2011 - 79
ASHRAE Journal - May 2011 - 80
ASHRAE Journal - May 2011 - 81
ASHRAE Journal - May 2011 - 82
ASHRAE Journal - May 2011 - 83
ASHRAE Journal - May 2011 - 84
ASHRAE Journal - May 2011 - 85
ASHRAE Journal - May 2011 - 86
ASHRAE Journal - May 2011 - 87
ASHRAE Journal - May 2011 - 88
ASHRAE Journal - May 2011 - 89
ASHRAE Journal - May 2011 - Emerging Technologies
ASHRAE Journal - May 2011 - 91
ASHRAE Journal - May 2011 - 92
ASHRAE Journal - May 2011 - 93
ASHRAE Journal - May 2011 - 94
ASHRAE Journal - May 2011 - 95
ASHRAE Journal - May 2011 - IAQ Applications
ASHRAE Journal - May 2011 - 97
ASHRAE Journal - May 2011 - 98
ASHRAE Journal - May 2011 - 99
ASHRAE Journal - May 2011 - 100
ASHRAE Journal - May 2011 - 101
ASHRAE Journal - May 2011 - Washington Report
ASHRAE Journal - May 2011 - 103
ASHRAE Journal - May 2011 - International Column
ASHRAE Journal - May 2011 - 105
ASHRAE Journal - May 2011 - 106
ASHRAE Journal - May 2011 - Products
ASHRAE Journal - May 2011 - 108
ASHRAE Journal - May 2011 - People
ASHRAE Journal - May 2011 - Classified Advertising
ASHRAE Journal - May 2011 - 111
ASHRAE Journal - May 2011 - Advertisers Index
ASHRAE Journal - May 2011 - Cover3
ASHRAE Journal - May 2011 - Cover4
http://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_ABEDGD
http://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201910
http://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201909
http://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2019septmeber_v2
http://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2019september
http://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201908
http://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201907
http://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201906
http://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201905
http://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201904
http://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_2019april
http://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201903
http://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_2019march
http://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201902
http://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201901
http://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_showguide2019
http://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_2018december
http://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_2018november
http://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2018fall_v2
http://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2018fall
http://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_2018october
http://www.nxtbook.com/nxtbooks/ashrae/ashraemexico_2018
http://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201810
http://www.nxtbook.com/nxtbooks/ashrae/ashraeinsights_201806
http://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201805
http://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201804
http://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201803
http://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201712
http://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201711
http://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201710
http://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2017fall_v2
http://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2017fall
http://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201709
http://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201705
http://www.nxtbook.com/nxtbooks/ashrae/ashrae_meetinginsert_201610
http://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2016fall_v2
http://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2016fall
http://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_acrexindia
http://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2015summer_v2
http://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2015summer
http://www.nxtbook.com/nxtbooks/amca/2014summer2
http://www.nxtbook.com/nxtbooks/amca/2014summer
http://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_acma_2014summer
http://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201311
http://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201309
http://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_acmasupp_2013fall
http://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201305
http://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201303
http://www.nxtbook.com/nxtbooks/ashrae/pubcatalog_2013winter
http://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201211
http://www.nxtbook.com/nxtbooks/ashrae/achr_expo_mexico2012
http://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201209
http://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201208_v3
http://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201208_v2
http://www.nxtbook.com/nxtbooks/ashrae/pubcatalog_2012summer
http://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201205
http://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201203
http://www.nxtbook.com/nxtbooks/ashrae/pubcatalog_2012winter
http://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201111_v2
http://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201109_v2
http://www.nxtbook.com/nxtbooks/ashrae/pubcatalog_2011summer
http://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201105
http://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201103
http://www.nxtbookMEDIA.com