ASHRAE Journal - October 2012 - 62

Cx Process for Design/Build Net Zero Energy School
For a real-life net zero school project, the key owner’s project requirements included the goals of being CHPS compliant, Living Buildings Challenge certified, and net zero energy within surrounding site. This high performance building used a modified commissioning process to accommodate the design/build delivery method.
Commissioning Authority (CxA) is first consultant hired by owner (prior to developing bridging documents or issuing design/build RFP) CxA develops OPR prior to Design/Build team selection CxA performs initial design review of Design/Build bridging documents prior to bid CxA performs phased design review of Design/Build packages as they are issued throughout the project Cx specifications are issued with bridging documents and include: Cx schedule, required to be incorporated into master project schedule Formal Cx notifications protocol, while reserving the right to communicate informally with sub-consultants and sub-contractors when expeditious Requirements for formal submittals from trade contractors for review by engineer of record All related submittals required prior to review, i.e., controls product data will not be reviewed by CxA until controls engineering drawings are provided Requirements for timely responses to Cx design issues by engineer of record Requirements for CxA to receive reviewed design package and approved submittals prior to delivery or start of installation of each system or component Engineer of record required to attendance of at least six Cx meetings during construction Design/build team required to review draft PFCs and FPTs prior to implementation Requirements to perform & document start-up, TAB, & controls point to point checks prior to FPTs Required response in the event of repeated failures of FPTs on major components Required response in the event of numerous failures of FPTs on repetitive components such as VAV boxes Requirements to provide As-Builts, O&Ms, final controls programming and setpoints, and other detailed information to CxA Draft PFCs and FPTs before construction, and finalize based on approved submittals after construction start Single Cx issues log includes all issues whether from design review, construction, FPTs, or other source CxA provides monthly briefing to owner’s project manager summarizing Cx status and noting Cx issues where owner’s help to expedite Design/Build team response is requested

Design Review
Planning commissioning design reviews so that they occur at the appropriate phase of design is complicated by the design/build approach, since design is occurring well into the construction phase. Since the bridging documents set the bar for the quality that the design/build team will have to deliver, commissioning review is very important. On a recent simple dormitory project, a small, fast track LEED-NC 2009 project with simple MEP systems, the second design review was coordinated with the design/build team to occur near the end of coordination when the MEP design was “locked down.” This was effective because the design of the commissioned systems were all completed around the same time.

design review could not be performed until two months prior to completion of construction. The resulting discontinuity in the commissioning design reviews from the bridging documents to construction diminished the impact of the second design review, since the ability to influence the design had dropped so far by the time the review was performed. Another approach is to offer a phased design review process, with necessary fee adjustments to cover the additional effort. This allows timely commissioning review of each aspect of the design as it is completed, before it is too late to influence that area of the design.

Submittal Review
The commissioning authority will often have to perform submittal review in phases over an extended period of time on design/build projects. This is particularly true when different aspects of the design are completed early on, while other aspects of design are still in flux. In some cases, it may be appropriate to insist on waiting to perform commissioning review if related submittals have not yet been received. For example, controls product submittals are rarely reviewed prior to receipt of the controls engineering plans, since it is typically infeasible to review the product submittals without the controls plans in hand. Design/build bridging documents should clearly require a formal submittal review process. On projects without this, deashrae.org October 2012

Phased Design Review
On more complex design/build projects, the design does not typically become fixed early in the construction phase. To further complicate planning the commissioning process, different aspects of the design may be completed early on, while other aspects of design are still not fixed. This can delay the second commissioning design review and, as shown previously, also diminishes the extent to which the commissioning review can influence the design. To address this complication on a recent college athletics center with natatorium, a large, complex project with extensive MEP and on-site renewable energy systems, the second
62 ASHRAE Journal



ASHRAE Journal - October 2012

Table of Contents for the Digital Edition of ASHRAE Journal - October 2012

ASHRAE Journal - October 2012
Contents
Commentary
Industry News
Letters
Meetings and Shows
Feature Articles
Energy Audits, Improvements in Small Office Buildings
Long-Term Commercial GSHP Performance: Part 4: Installation Costs
Using CO2 to Reduce Refrigerant Charge
Technology Award Case Studies:
Efficient Science Building
Commissioning Design/Build Projects
Standing Columns
Building Sciences
Emerging Technologies
Data Centers
IAQ Applications
Refrigeration Applications
Special Products
Washington Report
People
Engineer's Notebook
Products
Classified Advertising
Advertisers Index
ASHRAE Journal - October 2012 - ASHRAE Journal - October 2012
ASHRAE Journal - October 2012 - Cover2
ASHRAE Journal - October 2012 - 1
ASHRAE Journal - October 2012 - 2
ASHRAE Journal - October 2012 - Contents
ASHRAE Journal - October 2012 - Commentary
ASHRAE Journal - October 2012 - 5
ASHRAE Journal - October 2012 - Industry News
ASHRAE Journal - October 2012 - 7
ASHRAE Journal - October 2012 - 8
ASHRAE Journal - October 2012 - Letters
ASHRAE Journal - October 2012 - Meetings and Shows
ASHRAE Journal - October 2012 - 11
ASHRAE Journal - October 2012 - 12
ASHRAE Journal - October 2012 - 13
ASHRAE Journal - October 2012 - Energy Audits, Improvements in Small Office Buildings
ASHRAE Journal - October 2012 - 15
ASHRAE Journal - October 2012 - 16
ASHRAE Journal - October 2012 - 17
ASHRAE Journal - October 2012 - 18
ASHRAE Journal - October 2012 - 19
ASHRAE Journal - October 2012 - 20
ASHRAE Journal - October 2012 - 21
ASHRAE Journal - October 2012 - 22
ASHRAE Journal - October 2012 - 23
ASHRAE Journal - October 2012 - 24
ASHRAE Journal - October 2012 - 25
ASHRAE Journal - October 2012 - Long-Term Commercial GSHP Performance: Part 4: Installation Costs
ASHRAE Journal - October 2012 - 27
ASHRAE Journal - October 2012 - 28
ASHRAE Journal - October 2012 - 29
ASHRAE Journal - October 2012 - 30
ASHRAE Journal - October 2012 - 31
ASHRAE Journal - October 2012 - 32
ASHRAE Journal - October 2012 - 33
ASHRAE Journal - October 2012 - 34
ASHRAE Journal - October 2012 - 35
ASHRAE Journal - October 2012 - 36
ASHRAE Journal - October 2012 - 37
ASHRAE Journal - October 2012 - Using CO2 to Reduce Refrigerant Charge
ASHRAE Journal - October 2012 - 39
ASHRAE Journal - October 2012 - 40
ASHRAE Journal - October 2012 - 41
ASHRAE Journal - October 2012 - 42
ASHRAE Journal - October 2012 - 43
ASHRAE Journal - October 2012 - 44
ASHRAE Journal - October 2012 - 45
ASHRAE Journal - October 2012 - Efficient Science Building
ASHRAE Journal - October 2012 - 47
ASHRAE Journal - October 2012 - 48
ASHRAE Journal - October 2012 - 49
ASHRAE Journal - October 2012 - 50
ASHRAE Journal - October 2012 - 51
ASHRAE Journal - October 2012 - 52
ASHRAE Journal - October 2012 - 53
ASHRAE Journal - October 2012 - Commissioning Design/Build Projects
ASHRAE Journal - October 2012 - 55
ASHRAE Journal - October 2012 - 56
ASHRAE Journal - October 2012 - 57
ASHRAE Journal - October 2012 - 58
ASHRAE Journal - October 2012 - 59
ASHRAE Journal - October 2012 - 60
ASHRAE Journal - October 2012 - 61
ASHRAE Journal - October 2012 - 62
ASHRAE Journal - October 2012 - 63
ASHRAE Journal - October 2012 - 64
ASHRAE Journal - October 2012 - 65
ASHRAE Journal - October 2012 - Building Sciences
ASHRAE Journal - October 2012 - 67
ASHRAE Journal - October 2012 - 68
ASHRAE Journal - October 2012 - 69
ASHRAE Journal - October 2012 - 70
ASHRAE Journal - October 2012 - 71
ASHRAE Journal - October 2012 - 72
ASHRAE Journal - October 2012 - 73
ASHRAE Journal - October 2012 - 74
ASHRAE Journal - October 2012 - 75
ASHRAE Journal - October 2012 - 76
ASHRAE Journal - October 2012 - 77
ASHRAE Journal - October 2012 - 78
ASHRAE Journal - October 2012 - 79
ASHRAE Journal - October 2012 - 80
ASHRAE Journal - October 2012 - HR1
ASHRAE Journal - October 2012 - HR2
ASHRAE Journal - October 2012 - HR3
ASHRAE Journal - October 2012 - HR4
ASHRAE Journal - October 2012 - HR5
ASHRAE Journal - October 2012 - HR6
ASHRAE Journal - October 2012 - HR7
ASHRAE Journal - October 2012 - HR8
ASHRAE Journal - October 2012 - HR9
ASHRAE Journal - October 2012 - HR10
ASHRAE Journal - October 2012 - HR11
ASHRAE Journal - October 2012 - HR12
ASHRAE Journal - October 2012 - HR13
ASHRAE Journal - October 2012 - HR14
ASHRAE Journal - October 2012 - HR15
ASHRAE Journal - October 2012 - HR16
ASHRAE Journal - October 2012 - HR17
ASHRAE Journal - October 2012 - HR18
ASHRAE Journal - October 2012 - HR19
ASHRAE Journal - October 2012 - HR20
ASHRAE Journal - October 2012 - HR21
ASHRAE Journal - October 2012 - HR22
ASHRAE Journal - October 2012 - HR23
ASHRAE Journal - October 2012 - HR24
ASHRAE Journal - October 2012 - HR25
ASHRAE Journal - October 2012 - HR26
ASHRAE Journal - October 2012 - HR27
ASHRAE Journal - October 2012 - HR28
ASHRAE Journal - October 2012 - HR29
ASHRAE Journal - October 2012 - HR30
ASHRAE Journal - October 2012 - HR31
ASHRAE Journal - October 2012 - HR32
ASHRAE Journal - October 2012 - Emerging Technologies
ASHRAE Journal - October 2012 - 82
ASHRAE Journal - October 2012 - 83
ASHRAE Journal - October 2012 - 84
ASHRAE Journal - October 2012 - 85
ASHRAE Journal - October 2012 - Data Centers
ASHRAE Journal - October 2012 - 87
ASHRAE Journal - October 2012 - 88
ASHRAE Journal - October 2012 - 89
ASHRAE Journal - October 2012 - 90
ASHRAE Journal - October 2012 - 91
ASHRAE Journal - October 2012 - IAQ Applications
ASHRAE Journal - October 2012 - 93
ASHRAE Journal - October 2012 - Refrigeration Applications
ASHRAE Journal - October 2012 - 95
ASHRAE Journal - October 2012 - Special Products
ASHRAE Journal - October 2012 - 97
ASHRAE Journal - October 2012 - Washington Report
ASHRAE Journal - October 2012 - People
ASHRAE Journal - October 2012 - Engineer's Notebook
ASHRAE Journal - October 2012 - 101
ASHRAE Journal - October 2012 - Products
ASHRAE Journal - October 2012 - Classified Advertising
ASHRAE Journal - October 2012 - Advertisers Index
ASHRAE Journal - October 2012 - Cover3
ASHRAE Journal - October 2012 - Cover4
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_MCDEBX
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_WNYSQY
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_XATVOD
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_FJSHSS
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_CCBZDS
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_XDEFVG
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2023november_v2
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2023november
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_VHGNBL
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_WPKBNJ
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_UUVCDE
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_RTGDEW
https://www.nxtbook.com/nxtbooks/ashrae/ashraemexico_2023
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_LKRFXS
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_AZSOFG
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_ERCDBH
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_QWDFRV
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_JHGVDF
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_OPUYHG
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_SREIBM
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_LRTGLK
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_OKRFGH
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2022november_v2
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2022november
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_TZSERA
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_LVRUIX
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_RPTVYZ
https://www.nxtbook.com/nxtbooks/ashrae/mini_pub_catalog
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_XIYTGD
https://www.nxtbook.com/nxtbooks/ashrae/ashraemexico_2022
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_RFGDOB
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_PABXNU
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_REMKLS
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_PICVBT
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_AOYTVW
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_JQOPLS
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_IOYTBC
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_SGAJJF
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_IGHYER
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_PDRKLS
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2021november
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2021november_v2
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_XCODFR
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_QSLFGO
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_ILKVNM
https://www.nxtbook.com/nxtbooks/ashrae/ashraemexico_2021
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_OPDJKD
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_VJKSRY
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_SDHUTC
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_JPPKRR
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_SDLTTH
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_CKLLES
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_SLDOX
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_HJETUK
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_OLUHGE
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2020october
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2020october_v2
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_ZERDGH
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_QVMNEO
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_RTPOKE
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_BBATRE
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_STUBMW
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_TPEMPE
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_JNMKDS
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_FBTTPA
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_WQMMNE
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_TVBRYN
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_showguide2020
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_KTUZMA
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_ABEDGD
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201910
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201909
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2019septmeber_v2
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2019september
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201908
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201907
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201906
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201905
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201904
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_2019april
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201903
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_2019march
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201902
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201901
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_showguide2019
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_2018december
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_2018november
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2018fall_v2
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2018fall
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_2018october
https://www.nxtbook.com/nxtbooks/ashrae/ashraemexico_2018
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201810
https://www.nxtbook.com/nxtbooks/ashrae/ashraeinsights_201806
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201805
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201804
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201803
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201712
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201711
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201710
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2017fall_v2
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2017fall
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201709
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201705
https://www.nxtbook.com/nxtbooks/ashrae/ashrae_meetinginsert_201610
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2016fall_v2
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2016fall
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_acrexindia
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2015summer_v2
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2015summer
https://www.nxtbook.com/nxtbooks/amca/2014summer2
https://www.nxtbook.com/nxtbooks/amca/2014summer
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_acma_2014summer
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201311
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201309
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_acmasupp_2013fall
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201305
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201303
https://www.nxtbook.com/nxtbooks/ashrae/pubcatalog_2013winter
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201211
https://www.nxtbook.com/nxtbooks/ashrae/achr_expo_mexico2012
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201209
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201208_v3
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201208_v2
https://www.nxtbook.com/nxtbooks/ashrae/pubcatalog_2012summer
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201205
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201203
https://www.nxtbook.com/nxtbooks/ashrae/pubcatalog_2012winter
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201111_v2
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201109_v2
https://www.nxtbook.com/nxtbooks/ashrae/pubcatalog_2011summer
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201105
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201103
https://www.nxtbookmedia.com