Figure 2a: A simplified schematic illustrating a central modular water-to-water heat pump system designed to supply hot or
chilled water to air handlers in a building. A chilled water tank or ice storage tank is integrated with the GCHP system. Figure 2b:
Illustrates two water-to-water heat pumps drawing heat from the GHX and producing hot water. Figure 2c: Illustrates two heat
pumps providing chilled water to air handlers and rejecting heat to the GHX. Figure 2d: One heat pump is building chilled water
or ice in a storage tank and rejecting heat to the GHX. Figure 2e: One heat pump builds storage while simultaneously producing
hot water for use in the building. Figure 2f: System uses full heat pump capacity to produce chilled water for air conditioning
while using the storage tank to provide supplemental cooling capacity.
The length of the boreholes was calGCHP Without TES
GCHP With TES
culated based on the following parameters and is summarized in Table 6:
Total Borehole Length
18,964 ft
16,104 ft
• Grid of six boreholes is multiplied
Minimum Fluid Temperature to Building
50.5°F
49.8°F
by 12 boreholes: 20 ft (6.1 m) spacing;
• Undisturbed ground temperature:
Maximum Fluid Temperature to Building
95.0°F
95.0°F
56°F (13.3°C);
• Average thermal conductivity of Table 6: Total borehole length for GHX calculated for a five year prediction time to
soil: 1.40 Btu/h·ft·°F (2.42 W/[m·K]);
reach a maximum temperature of 95°F (35°C). These calculations are based on site
• Average thermal diffusivity of soil/ specific data, and will vary by geology and geography.
rock: 0.90 ft2/day (0.084 m2/day); and
• The GHX was modeled to operate at a maximum tempera- cost of tanks and controls. Capital cost savings for equipment
ture of 95°F (29.4°C).
and the GHX help provide a more attractive financial model
In this building, the amount of drilling required can be re- for the owner. The estimated simple payback for the standard
duced by approximately 15% if chilled water or ice storage is GCHP system and the GCHP with TES is summarized in Taintegrated with the mechanical system and has little impact on ble 7.
the operating temperatures of the GHX. This has a significant
impact on the cost of constructing a GHX for this facility. At a Central Plant Schematic Design with TES
cost of $12 to $22/ft ($40 to $72/m), the cost to construct the
Chilled water or ice storage tanks are most easily inteGHX is reduced by $34,000 to $63,000.
grated into a central plant design using either water-toThe cost of chilled water or ice storage tanks is significant, water heat pumps or conventional chiller equipment. The
but reduced chiller or heat pump capacity offsets additional equipment selected must operate efficiently at the fluid
18

ASHRAE Journal

ashrae.org

April 2013



ASHRAE Journal - April 2013

Table of Contents for the Digital Edition of ASHRAE Journal - April 2013

ASHRAE Journal - April 2013
Contents
Commentary
Industry News
Letters
Meetings and Shows
Feature Articles
Ground-Coupled Heat Pump and Energy Storage
Fan Efficiency Requirements for Standard 90.1-2013
Technology Award Case Studies:
Geothermal for 5 Ecosystems
Holistic HVAC Design
Standing Columns
Engineer’s Notebook
Data Centers
Emerging Technologies
IAQ Applications
Refrigeration Applications
Special Products
People
International Column
Energy Modeling
Products
Classified Advertising
Advertisers Index
ASHRAE Journal - April 2013 - ASHRAE Journal - April 2013
ASHRAE Journal - April 2013 - Cover2
ASHRAE Journal - April 2013 - 1
ASHRAE Journal - April 2013 - 2
ASHRAE Journal - April 2013 - Contents
ASHRAE Journal - April 2013 - Commentary
ASHRAE Journal - April 2013 - 5
ASHRAE Journal - April 2013 - Industry News
ASHRAE Journal - April 2013 - 7
ASHRAE Journal - April 2013 - 8
ASHRAE Journal - April 2013 - Letters
ASHRAE Journal - April 2013 - Meetings and Shows
ASHRAE Journal - April 2013 - 11
ASHRAE Journal - April 2013 - 12
ASHRAE Journal - April 2013 - 13
ASHRAE Journal - April 2013 - Ground-Coupled Heat Pump and Energy Storage
ASHRAE Journal - April 2013 - 15
ASHRAE Journal - April 2013 - 16
ASHRAE Journal - April 2013 - I1
ASHRAE Journal - April 2013 - I2
ASHRAE Journal - April 2013 - I3
ASHRAE Journal - April 2013 - I4
ASHRAE Journal - April 2013 - 17
ASHRAE Journal - April 2013 - 18
ASHRAE Journal - April 2013 - 19
ASHRAE Journal - April 2013 - 20
ASHRAE Journal - April 2013 - 21
ASHRAE Journal - April 2013 - 22
ASHRAE Journal - April 2013 - 23
ASHRAE Journal - April 2013 - Fan Efficiency Requirements for Standard 90.1-2013
ASHRAE Journal - April 2013 - 25
ASHRAE Journal - April 2013 - 26
ASHRAE Journal - April 2013 - 27
ASHRAE Journal - April 2013 - 28
ASHRAE Journal - April 2013 - 29
ASHRAE Journal - April 2013 - 30
ASHRAE Journal - April 2013 - 31
ASHRAE Journal - April 2013 - Geothermal for 5 Ecosystems
ASHRAE Journal - April 2013 - 33
ASHRAE Journal - April 2013 - 34
ASHRAE Journal - April 2013 - 35
ASHRAE Journal - April 2013 - 36
ASHRAE Journal - April 2013 - 37
ASHRAE Journal - April 2013 - 38
ASHRAE Journal - April 2013 - 39
ASHRAE Journal - April 2013 - Holistic HVAC Design
ASHRAE Journal - April 2013 - 41
ASHRAE Journal - April 2013 - 42
ASHRAE Journal - April 2013 - 43
ASHRAE Journal - April 2013 - 44
ASHRAE Journal - April 2013 - 45
ASHRAE Journal - April 2013 - 46
ASHRAE Journal - April 2013 - 47
ASHRAE Journal - April 2013 - Engineer’s Notebook
ASHRAE Journal - April 2013 - 49
ASHRAE Journal - April 2013 - 50
ASHRAE Journal - April 2013 - 51
ASHRAE Journal - April 2013 - 52
ASHRAE Journal - April 2013 - 53
ASHRAE Journal - April 2013 - Data Centers
ASHRAE Journal - April 2013 - 55
ASHRAE Journal - April 2013 - 56
ASHRAE Journal - April 2013 - 57
ASHRAE Journal - April 2013 - 58
ASHRAE Journal - April 2013 - 59
ASHRAE Journal - April 2013 - Emerging Technologies
ASHRAE Journal - April 2013 - 61
ASHRAE Journal - April 2013 - 62
ASHRAE Journal - April 2013 - 63
ASHRAE Journal - April 2013 - IAQ Applications
ASHRAE Journal - April 2013 - 65
ASHRAE Journal - April 2013 - 66
ASHRAE Journal - April 2013 - Refrigeration Applications
ASHRAE Journal - April 2013 - Special Products
ASHRAE Journal - April 2013 - People
ASHRAE Journal - April 2013 - International Column
ASHRAE Journal - April 2013 - 71
ASHRAE Journal - April 2013 - Energy Modeling
ASHRAE Journal - April 2013 - 73
ASHRAE Journal - April 2013 - Products
ASHRAE Journal - April 2013 - 75
ASHRAE Journal - April 2013 - 76
ASHRAE Journal - April 2013 - 77
ASHRAE Journal - April 2013 - 78
ASHRAE Journal - April 2013 - Classified Advertising
ASHRAE Journal - April 2013 - Advertisers Index
ASHRAE Journal - April 2013 - Cover3
ASHRAE Journal - April 2013 - Cover4
http://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_ABEDGD
http://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201910
http://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201909
http://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2019septmeber_v2
http://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2019september
http://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201908
http://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201907
http://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201906
http://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201905
http://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201904
http://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_2019april
http://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201903
http://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_2019march
http://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201902
http://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201901
http://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_showguide2019
http://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_2018december
http://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_2018november
http://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2018fall_v2
http://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2018fall
http://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_2018october
http://www.nxtbook.com/nxtbooks/ashrae/ashraemexico_2018
http://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201810
http://www.nxtbook.com/nxtbooks/ashrae/ashraeinsights_201806
http://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201805
http://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201804
http://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201803
http://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201712
http://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201711
http://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201710
http://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2017fall_v2
http://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2017fall
http://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201709
http://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201705
http://www.nxtbook.com/nxtbooks/ashrae/ashrae_meetinginsert_201610
http://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2016fall_v2
http://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2016fall
http://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_acrexindia
http://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2015summer_v2
http://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2015summer
http://www.nxtbook.com/nxtbooks/amca/2014summer2
http://www.nxtbook.com/nxtbooks/amca/2014summer
http://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_acma_2014summer
http://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201311
http://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201309
http://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_acmasupp_2013fall
http://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201305
http://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201303
http://www.nxtbook.com/nxtbooks/ashrae/pubcatalog_2013winter
http://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201211
http://www.nxtbook.com/nxtbooks/ashrae/achr_expo_mexico2012
http://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201209
http://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201208_v3
http://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201208_v2
http://www.nxtbook.com/nxtbooks/ashrae/pubcatalog_2012summer
http://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201205
http://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201203
http://www.nxtbook.com/nxtbooks/ashrae/pubcatalog_2012winter
http://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201111_v2
http://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201109_v2
http://www.nxtbook.com/nxtbooks/ashrae/pubcatalog_2011summer
http://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201105
http://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201103
http://www.nxtbookMEDIA.com