After building construction is complete, thorough prefunctional testing is vital. Properly starting up, operating, and
checking all of a building’s equipment helps ensure that all
components are producing the outputs mandated by the OPR
and BOD documents. This is the phase in which controls are
verified to be operating properly and the TAB results are verified to meet the project’s design criteria.
The functional performance testing follows the prefunctional
testing. In this phase, all building systems are proven to work
as an integrated whole, produce the desired outputs, respond to
system changes within the specified timeframe, and operate in
a stable manner. Next, the systems manual is prepared, proper owner training is completed and documented, and the final
commissioning report is prepared and presented to the owner.
The final step of a successful project is a thorough post-occupancy measurement and verification program, which verifies that the temperature, humidity, lighting, sound, vibration,
and energy-use levels specified in the OPR document have
been achieved.

the owner-developed OPR document to verify the document exists. In contrast, the technical commissioning process requires
the CxA to actively assist the owner and design team in developing the OPR document, ensure that all key requirements have
been addressed, and suggest practical process improvements.
Here’s another difference: Under process commissioning,
the CxA reviews the BOD document against the project design documents to ensure OPR conformance. But under technical commissioning, the CxA reviews the design documents
more thoroughly, conducting detailed reviews to ensure conformance with both OPR and known best practices.
Also, while technical commissioning parallels ASHRAE
Guideline 0-2005 in many areas, it differs by not allowing
sampling for design review. Under technical commissioning,
the CxA pays close attention to system setup and testing values, carefully checking and testing such design elements as
outside air quantity, systems’ diversity, design velocities, pressure drops, and damper/valve types and locations.

Process and Technical Commissioning

The differences between the two forms of commissioning
become more evident in the construction phase, in which the
technical commissioning process employs more robust testing
and verification than process commissioning.
Inspections. The process commissioning authority reviews
the inspection forms that have been prepared and completed
by installing contractors, and verifies that all quality control
(QC) forms have been properly completed. Process commissioning calls for the CxA to observe the controls contractor
during system startup, and review the contractor’s reports to
verify completion. The CxA also obtains “samples” from the
TAB report to verify compliance.
In contrast, the technical commissioning authority actually
prepares the necessary QC forms and performs on-site verifications of QC inspections and contractors’ tests to ensure
quality construction. The technical commissioning authority
also performs a point-to-point test of all system controls and
verifies the accuracy and proper calibration of all system sensors and any computer-generated graphics. Sampling is not
allowed. Finally, under technical commissioning the CxA verifies the TAB report to ensure accuracy and lists all construction, operational, and functional deficiencies in an issue log.
Functional performance tests. Process commissioning
calls for the commissioning authority to prepare all functional performance tests (FPTs), but the tests are performed
and documented by the installing contractors. The CxA uses
an issue log to record any issues that are uncovered during
testing, and documents those issues in the final report. Note
that although there may be CxA records issues that do not
conform to the OPR document, he or she may not necessarily work to resolve them. The responsibility for resolution
usually rests with the design and construction team—a delegation that too often results in a “circle of blame,” in which
each party points to the next party and problems may never
be fully resolved.

The USGBC and its LEED certification guidelines have greatly
improved the quality of today’s design and construction processes. However, many new buildings still do not meet their owners’
expectations—whether or not they are LEED certified. Published
literature indicates that between 28% and 35% of LEED-certified
buildings do not meet their energy-use projections.2
While poor building performance can often be traced back to
the design and construction phases, there may also be another
culprit: the type of commissioning employed on a given project.
As noted, two forms of commissioning have evolved over
time: process commissioning and technical commissioning.
Process commissioning manages project quality by observing and reviewing the inspection and testing processes that are
followed by the project’s designers, engineers, and contractors. In this form of commissioning, engineers and contractors
serve as the project’s technical experts and provide the testing
expertise for building operations and testing. Under process
commissioning, the commissioning authority (called the CxA
by the USGBC) provides the outline of the commissioning
process, which is then implemented by engineers and/or contractors—who are required to provide only a sampling of test
results from either work in-process or completed.
Technical commissioning is based primarily on hands-on
inspections and functional testing and verification of building systems performance. This form of commissioning does
not rely on observing or reviewing inspection and testing processes performed by others. The technical commissioning approach ensures that the CxA is the final expert that actually
performs or observes proper testing on all building systems.
The only sampling permitted under technical commissioning is sufficient testing of the testing, adjusting and balancing
(TAB) report to verify that the TAB report is correct.
While both commissioning approaches begin with an OPR
document, process commissioning calls for the CxA to review
32

ASHRAE Journal

Process vs. Technical Commissioning

ashrae.org

June 2013



ASHRAE Journal - June 2013

Table of Contents for the Digital Edition of ASHRAE Journal - June 2013

ASHRAE Journal - June 2013
Contents
Commentary
Industry News
Letters
Meetings and Shows
Feature Articles
Standardizing Data for VFD Efficiency
Technical vs. Process Commissioning
Technology Award Case Studies:
Low EUI Community Hospital
Reheat for Medical Center
Standing Columns
Building Sciences
Data Centers
Emerging Technologies
Engineer's Notebook
IAQ Applications
Special Products
Refrigeration Applications
Energy Modeling
People
Products
Classified Advertising
Advertisers Index
ASHRAE Journal - June 2013 - ASHRAE Journal - June 2013
ASHRAE Journal - June 2013 - Cover2
ASHRAE Journal - June 2013 - 1
ASHRAE Journal - June 2013 - 2
ASHRAE Journal - June 2013 - Contents
ASHRAE Journal - June 2013 - Commentary
ASHRAE Journal - June 2013 - 5
ASHRAE Journal - June 2013 - Industry News
ASHRAE Journal - June 2013 - 7
ASHRAE Journal - June 2013 - 8
ASHRAE Journal - June 2013 - 9
ASHRAE Journal - June 2013 - Letters
ASHRAE Journal - June 2013 - 11
ASHRAE Journal - June 2013 - Meetings and Shows
ASHRAE Journal - June 2013 - 13
ASHRAE Journal - June 2013 - 14
ASHRAE Journal - June 2013 - 15
ASHRAE Journal - June 2013 - Standardizing Data for VFD Efficiency
ASHRAE Journal - June 2013 - 17
ASHRAE Journal - June 2013 - 18
ASHRAE Journal - June 2013 - 19
ASHRAE Journal - June 2013 - 20
ASHRAE Journal - June 2013 - 21
ASHRAE Journal - June 2013 - 22
ASHRAE Journal - June 2013 - 23
ASHRAE Journal - June 2013 - 24
ASHRAE Journal - June 2013 - 25
ASHRAE Journal - June 2013 - 26
ASHRAE Journal - June 2013 - 27
ASHRAE Journal - June 2013 - Technical vs. Process Commissioning
ASHRAE Journal - June 2013 - 29
ASHRAE Journal - June 2013 - 30
ASHRAE Journal - June 2013 - 31
ASHRAE Journal - June 2013 - 32
ASHRAE Journal - June 2013 - 33
ASHRAE Journal - June 2013 - 34
ASHRAE Journal - June 2013 - 35
ASHRAE Journal - June 2013 - Low EUI Community Hospital
ASHRAE Journal - June 2013 - 37
ASHRAE Journal - June 2013 - 38
ASHRAE Journal - June 2013 - 39
ASHRAE Journal - June 2013 - 40
ASHRAE Journal - June 2013 - 41
ASHRAE Journal - June 2013 - 42
ASHRAE Journal - June 2013 - 43
ASHRAE Journal - June 2013 - 44
ASHRAE Journal - June 2013 - 45
ASHRAE Journal - June 2013 - Reheat for Medical Center
ASHRAE Journal - June 2013 - 47
ASHRAE Journal - June 2013 - 48
ASHRAE Journal - June 2013 - 49
ASHRAE Journal - June 2013 - 50
ASHRAE Journal - June 2013 - 51
ASHRAE Journal - June 2013 - Building Sciences
ASHRAE Journal - June 2013 - 53
ASHRAE Journal - June 2013 - 54
ASHRAE Journal - June 2013 - 55
ASHRAE Journal - June 2013 - 56
ASHRAE Journal - June 2013 - 57
ASHRAE Journal - June 2013 - Data Centers
ASHRAE Journal - June 2013 - 59
ASHRAE Journal - June 2013 - 60
ASHRAE Journal - June 2013 - 61
ASHRAE Journal - June 2013 - Emerging Technologies
ASHRAE Journal - June 2013 - 63
ASHRAE Journal - June 2013 - 64
ASHRAE Journal - June 2013 - 65
ASHRAE Journal - June 2013 - 66
ASHRAE Journal - June 2013 - 67
ASHRAE Journal - June 2013 - Engineer's Notebook
ASHRAE Journal - June 2013 - 69
ASHRAE Journal - June 2013 - 70
ASHRAE Journal - June 2013 - 71
ASHRAE Journal - June 2013 - IAQ Applications
ASHRAE Journal - June 2013 - 73
ASHRAE Journal - June 2013 - 74
ASHRAE Journal - June 2013 - 75
ASHRAE Journal - June 2013 - Special Products
ASHRAE Journal - June 2013 - 77
ASHRAE Journal - June 2013 - Refrigeration Applications
ASHRAE Journal - June 2013 - 79
ASHRAE Journal - June 2013 - Energy Modeling
ASHRAE Journal - June 2013 - 81
ASHRAE Journal - June 2013 - People
ASHRAE Journal - June 2013 - 83
ASHRAE Journal - June 2013 - Products
ASHRAE Journal - June 2013 - 85
ASHRAE Journal - June 2013 - 86
ASHRAE Journal - June 2013 - Classified Advertising
ASHRAE Journal - June 2013 - Advertisers Index
ASHRAE Journal - June 2013 - Cover3
ASHRAE Journal - June 2013 - Cover4
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_MCDEBX
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_WNYSQY
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_XATVOD
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_FJSHSS
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_CCBZDS
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_XDEFVG
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2023november_v2
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2023november
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_VHGNBL
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_WPKBNJ
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_UUVCDE
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_RTGDEW
https://www.nxtbook.com/nxtbooks/ashrae/ashraemexico_2023
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_LKRFXS
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_AZSOFG
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_ERCDBH
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_QWDFRV
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_JHGVDF
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_OPUYHG
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_SREIBM
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_LRTGLK
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_OKRFGH
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2022november_v2
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2022november
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_TZSERA
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_LVRUIX
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_RPTVYZ
https://www.nxtbook.com/nxtbooks/ashrae/mini_pub_catalog
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_XIYTGD
https://www.nxtbook.com/nxtbooks/ashrae/ashraemexico_2022
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_RFGDOB
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_PABXNU
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_REMKLS
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_PICVBT
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_AOYTVW
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_JQOPLS
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_IOYTBC
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_SGAJJF
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_IGHYER
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_PDRKLS
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2021november
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2021november_v2
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_XCODFR
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_QSLFGO
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_ILKVNM
https://www.nxtbook.com/nxtbooks/ashrae/ashraemexico_2021
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_OPDJKD
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_VJKSRY
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_SDHUTC
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_JPPKRR
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_SDLTTH
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_CKLLES
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_SLDOX
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_HJETUK
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_OLUHGE
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2020october
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2020october_v2
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_ZERDGH
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_QVMNEO
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_RTPOKE
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_BBATRE
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_STUBMW
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_TPEMPE
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_JNMKDS
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_FBTTPA
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_WQMMNE
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_TVBRYN
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_showguide2020
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_KTUZMA
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_ABEDGD
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201910
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201909
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2019septmeber_v2
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2019september
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201908
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201907
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201906
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201905
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201904
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_2019april
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201903
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_2019march
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201902
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201901
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_showguide2019
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_2018december
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_2018november
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2018fall_v2
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2018fall
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_2018october
https://www.nxtbook.com/nxtbooks/ashrae/ashraemexico_2018
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201810
https://www.nxtbook.com/nxtbooks/ashrae/ashraeinsights_201806
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201805
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201804
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201803
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201712
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201711
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201710
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2017fall_v2
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2017fall
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201709
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201705
https://www.nxtbook.com/nxtbooks/ashrae/ashrae_meetinginsert_201610
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2016fall_v2
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2016fall
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_acrexindia
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2015summer_v2
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2015summer
https://www.nxtbook.com/nxtbooks/amca/2014summer2
https://www.nxtbook.com/nxtbooks/amca/2014summer
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_acma_2014summer
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201311
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201309
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_acmasupp_2013fall
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201305
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201303
https://www.nxtbook.com/nxtbooks/ashrae/pubcatalog_2013winter
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201211
https://www.nxtbook.com/nxtbooks/ashrae/achr_expo_mexico2012
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201209
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201208_v3
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201208_v2
https://www.nxtbook.com/nxtbooks/ashrae/pubcatalog_2012summer
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201205
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201203
https://www.nxtbook.com/nxtbooks/ashrae/pubcatalog_2012winter
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201111_v2
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201109_v2
https://www.nxtbook.com/nxtbooks/ashrae/pubcatalog_2011summer
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201105
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201103
https://www.nxtbookmedia.com