ASHRAE Journal - July 2013 - 10

INDUSTRY NEWS

RICHLAND, Wash.—A single advanced building control
now in development could slash 18%—tens of thousands of
dollars—off the overall annual energy bill of the average large
office building, with no loss of comfort, according to a report
by researchers at the Department of Energy’s Pacific Northwest
National Laboratory.
“An 18% boost in building energy efficiency by modifying
a single factor is very, very good,” said team leader Michael
Brambley, Ph.D., Member ASHRAE. “The savings were much
greater than we expected.”
The report is based on extensive simulations of the impact
of one type of advanced building control now in the offing in
the building industry. The device is capable of customizing the
level of ventilation by sensing the number of people in different
areas or zones of a building and then adjusting fan speed and
air movement accordingly.
That’s a big change from the way most sensor-based ventilation systems operate. Currently, if there is even a single person
in a room, ventilation runs full blast, as if the room is full.
Current occupancy sensors have helped the nation save significant amounts of energy by automatically turning off lights
when they’re not needed. But the team estimates that the more
advanced versions still to come—which count the number of
people in rooms—will save approximately 28 times as much
energy, when used both for lighting and ventilation, compared
to current sensors. Source: PNNL

Report: Energy-Efficient HVAC Revenue to Double

BOULDER, Colo.—Annual revenue generated by global sales
of energy-efficient HVAC systems is expected to surpass $33
billion by the end of the decade, according to a recent study from
Navigant Research. The “Energy Efficient HVAC Systems” report concludes that annual revenue from energy efficient HVAC
systems is set to nearly double from $17.2 billion in 2013 to
$33.2 billion by 2020. “In the wake of the global recession of
2009, developed markets for efficient HVAC... remain sluggish,”
said Navigant senior research director Bob Gohn. “However, the

Courtesy of Seattle.gov © NBBJ/Studio 216

Device Could Reduce
Energy Bill by 18%

Rendering of Amazon three-block tri-sphere biodome.

Amazon Headquarters to Be Biodome
SEATTLE—For Amazon’s new three-block headquarters
planned for downtown Seattle, architecture firm NBBJ has
submitted a revision that would replace a six-story office
building with a tri-sphere biodome that will host various
forms of plant life and provide a more natural setting for
employees to work and socialize.
The transparent, glass enclosure will be anchored by retail
stores and provide 65,000 ft2 (6039 m2) of work, dining,
meeting and lounge space, in addition to a variety of botanical zones modeled on montane ecologies found around the
globe. Each sphere will be made up of five high bay floors,
capable of fostering a mature tree. Source: Archdaily
North American market will revive during 2013 and begin to
experience more substantial growth during 2014. Europe will
follow a similar trend, but recovery will likely not occur until
mid to late 2014.” Source: Navigant Research

BITZER Opens North American Headquarters
OAKWOOD, Ga.—BITZER, a manufacturer of compressors
for commercial refrigeration and air conditioning, opened its
new 95,000 ft2 (8825 m2) North American Headquarters and
production facility here last month. The new facility doubles
the size of the plant that opened in 2005. Source: BITZER

STOCKHOLM—Facebook has opened
a new data center in Luleå, Sweden, a
place that offers plenty of water and
a cool climate, as the social network
seeks to lower its costs and improve its
environmental friendliness.
The new data center is Facebook’s
first outside the U.S., located about 600
miles (966 km) north of Stockholm at
the edge of Arctic Circle. It is also the
10

ASHRAE Journal

Photo: Facebook

Facebook Turns On
Arctic Data Center

Chilly outdoor air cools thousands of servers.
first to rely exclusively upon servers
designed by the company itself. Facebook says the city’s “chilly Nordic air”
ashrae.org

can be used to cool the thousands of
servers in the 290,000 ft2 (27 000 m2)
facility. Any excess heat that the servers produce can be used to warm the
office. Also, the facility is powered by
locally generated, 100% hydroelectric
energy, which is so reliable Facebook
has been able to reduce the number of
backup generators by more than 70%.
Sweden’s dense f iber optic network
is another reason Facebook chose the
Nordic nation to build its first foreign
data center. Source: Facebook
July 2013



ASHRAE Journal - July 2013

Table of Contents for the Digital Edition of ASHRAE Journal - July 2013

Contents
Commentary
Industry News
Letters
Meetings and Shows
Feature Articles
Sound Advice: Acoustical Specifications for Air Terminals & Air Outlets
Energy Codes and Standards: Part 1: Prescriptive vs. Performance Compliance
Technology Award Case Studies:
Big Plant in a Small Space
Hospital Quality Control
Standing Columns
Building Sciences
Advertising Section
Sustainable Products Capabilities
Refrigeration Applications
Data Centers
IAQ Applications
Energy Modeling
Products
Engineer's Notebook
Classified Advertising
Advertisers Index
ASHRAE Journal - July 2013 - Cover1
ASHRAE Journal - July 2013 - Cover2
ASHRAE Journal - July 2013 - 1
ASHRAE Journal - July 2013 - 2
ASHRAE Journal - July 2013 - Contents
ASHRAE Journal - July 2013 - Commentary
ASHRAE Journal - July 2013 - 5
ASHRAE Journal - July 2013 - Industry News
ASHRAE Journal - July 2013 - 7
ASHRAE Journal - July 2013 - 8
ASHRAE Journal - July 2013 - 9
ASHRAE Journal - July 2013 - 10
ASHRAE Journal - July 2013 - 11
ASHRAE Journal - July 2013 - Letters
ASHRAE Journal - July 2013 - 13
ASHRAE Journal - July 2013 - Meetings and Shows
ASHRAE Journal - July 2013 - 15
ASHRAE Journal - July 2013 - Sound Advice: Acoustical Specifications for Air Terminals & Air Outlets
ASHRAE Journal - July 2013 - 17
ASHRAE Journal - July 2013 - 18
ASHRAE Journal - July 2013 - 19
ASHRAE Journal - July 2013 - 20
ASHRAE Journal - July 2013 - 21
ASHRAE Journal - July 2013 - Energy Codes and Standards: Part 1: Prescriptive vs. Performance Compliance
ASHRAE Journal - July 2013 - 23
ASHRAE Journal - July 2013 - 24
ASHRAE Journal - July 2013 - 25
ASHRAE Journal - July 2013 - 26
ASHRAE Journal - July 2013 - 27
ASHRAE Journal - July 2013 - Big Plant in a Small Space
ASHRAE Journal - July 2013 - 29
ASHRAE Journal - July 2013 - 30
ASHRAE Journal - July 2013 - 31
ASHRAE Journal - July 2013 - 32
ASHRAE Journal - July 2013 - 33
ASHRAE Journal - July 2013 - Hospital Quality Control
ASHRAE Journal - July 2013 - 35
ASHRAE Journal - July 2013 - 36
ASHRAE Journal - July 2013 - 37
ASHRAE Journal - July 2013 - 38
ASHRAE Journal - July 2013 - 39
ASHRAE Journal - July 2013 - Building Sciences
ASHRAE Journal - July 2013 - 41
ASHRAE Journal - July 2013 - 42
ASHRAE Journal - July 2013 - 43
ASHRAE Journal - July 2013 - 44
ASHRAE Journal - July 2013 - 45
ASHRAE Journal - July 2013 - 46
ASHRAE Journal - July 2013 - Sustainable Products Capabilities
ASHRAE Journal - July 2013 - 48
ASHRAE Journal - July 2013 - 49
ASHRAE Journal - July 2013 - 50
ASHRAE Journal - July 2013 - 51
ASHRAE Journal - July 2013 - 52
ASHRAE Journal - July 2013 - 53
ASHRAE Journal - July 2013 - 54
ASHRAE Journal - July 2013 - 55
ASHRAE Journal - July 2013 - 56
ASHRAE Journal - July 2013 - 57
ASHRAE Journal - July 2013 - 58
ASHRAE Journal - July 2013 - 59
ASHRAE Journal - July 2013 - 60
ASHRAE Journal - July 2013 - 61
ASHRAE Journal - July 2013 - 62
ASHRAE Journal - July 2013 - 63
ASHRAE Journal - July 2013 - 64
ASHRAE Journal - July 2013 - 65
ASHRAE Journal - July 2013 - 66
ASHRAE Journal - July 2013 - 67
ASHRAE Journal - July 2013 - 68
ASHRAE Journal - July 2013 - 69
ASHRAE Journal - July 2013 - 70
ASHRAE Journal - July 2013 - 71
ASHRAE Journal - July 2013 - 72
ASHRAE Journal - July 2013 - 73
ASHRAE Journal - July 2013 - 74
ASHRAE Journal - July 2013 - 75
ASHRAE Journal - July 2013 - 76
ASHRAE Journal - July 2013 - 77
ASHRAE Journal - July 2013 - 78
ASHRAE Journal - July 2013 - 79
ASHRAE Journal - July 2013 - 80
ASHRAE Journal - July 2013 - 81
ASHRAE Journal - July 2013 - 82
ASHRAE Journal - July 2013 - 83
ASHRAE Journal - July 2013 - 84
ASHRAE Journal - July 2013 - 85
ASHRAE Journal - July 2013 - 86
ASHRAE Journal - July 2013 - 87
ASHRAE Journal - July 2013 - 88
ASHRAE Journal - July 2013 - 89
ASHRAE Journal - July 2013 - 90
ASHRAE Journal - July 2013 - 91
ASHRAE Journal - July 2013 - 92
ASHRAE Journal - July 2013 - 93
ASHRAE Journal - July 2013 - 94
ASHRAE Journal - July 2013 - 95
ASHRAE Journal - July 2013 - 96
ASHRAE Journal - July 2013 - 97
ASHRAE Journal - July 2013 - 98
ASHRAE Journal - July 2013 - 99
ASHRAE Journal - July 2013 - 100
ASHRAE Journal - July 2013 - 101
ASHRAE Journal - July 2013 - 102
ASHRAE Journal - July 2013 - 103
ASHRAE Journal - July 2013 - 104
ASHRAE Journal - July 2013 - 105
ASHRAE Journal - July 2013 - 106
ASHRAE Journal - July 2013 - 107
ASHRAE Journal - July 2013 - 108
ASHRAE Journal - July 2013 - 109
ASHRAE Journal - July 2013 - 110
ASHRAE Journal - July 2013 - 111
ASHRAE Journal - July 2013 - 112
ASHRAE Journal - July 2013 - 113
ASHRAE Journal - July 2013 - 114
ASHRAE Journal - July 2013 - 115
ASHRAE Journal - July 2013 - 116
ASHRAE Journal - July 2013 - 117
ASHRAE Journal - July 2013 - 118
ASHRAE Journal - July 2013 - 119
ASHRAE Journal - July 2013 - 120
ASHRAE Journal - July 2013 - Refrigeration Applications
ASHRAE Journal - July 2013 - Data Centers
ASHRAE Journal - July 2013 - 123
ASHRAE Journal - July 2013 - 124
ASHRAE Journal - July 2013 - 125
ASHRAE Journal - July 2013 - IAQ Applications
ASHRAE Journal - July 2013 - 127
ASHRAE Journal - July 2013 - 128
ASHRAE Journal - July 2013 - 129
ASHRAE Journal - July 2013 - Energy Modeling
ASHRAE Journal - July 2013 - 131
ASHRAE Journal - July 2013 - Products
ASHRAE Journal - July 2013 - 133
ASHRAE Journal - July 2013 - Engineer's Notebook
ASHRAE Journal - July 2013 - Classified Advertising
ASHRAE Journal - July 2013 - Advertisers Index
ASHRAE Journal - July 2013 - Cover3
ASHRAE Journal - July 2013 - Cover4
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_MCDEBX
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_WNYSQY
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_XATVOD
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_FJSHSS
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_CCBZDS
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_XDEFVG
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2023november_v2
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2023november
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_VHGNBL
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_WPKBNJ
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_UUVCDE
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_RTGDEW
https://www.nxtbook.com/nxtbooks/ashrae/ashraemexico_2023
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_LKRFXS
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_AZSOFG
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_ERCDBH
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_QWDFRV
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_JHGVDF
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_OPUYHG
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_SREIBM
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_LRTGLK
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_OKRFGH
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2022november_v2
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2022november
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_TZSERA
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_LVRUIX
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_RPTVYZ
https://www.nxtbook.com/nxtbooks/ashrae/mini_pub_catalog
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_XIYTGD
https://www.nxtbook.com/nxtbooks/ashrae/ashraemexico_2022
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_RFGDOB
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_PABXNU
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_REMKLS
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_PICVBT
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_AOYTVW
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_JQOPLS
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_IOYTBC
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_SGAJJF
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_IGHYER
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_PDRKLS
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2021november
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2021november_v2
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_XCODFR
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_QSLFGO
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_ILKVNM
https://www.nxtbook.com/nxtbooks/ashrae/ashraemexico_2021
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_OPDJKD
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_VJKSRY
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_SDHUTC
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_JPPKRR
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_SDLTTH
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_CKLLES
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_SLDOX
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_HJETUK
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_OLUHGE
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2020october
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2020october_v2
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_ZERDGH
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_QVMNEO
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_RTPOKE
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_BBATRE
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_STUBMW
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_TPEMPE
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_JNMKDS
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_FBTTPA
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_WQMMNE
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_TVBRYN
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_showguide2020
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_KTUZMA
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_ABEDGD
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201910
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201909
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2019septmeber_v2
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2019september
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201908
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201907
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201906
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201905
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201904
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_2019april
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201903
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_2019march
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201902
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201901
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_showguide2019
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_2018december
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_2018november
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2018fall_v2
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2018fall
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_2018october
https://www.nxtbook.com/nxtbooks/ashrae/ashraemexico_2018
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201810
https://www.nxtbook.com/nxtbooks/ashrae/ashraeinsights_201806
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201805
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201804
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201803
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201712
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201711
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201710
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2017fall_v2
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2017fall
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201709
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201705
https://www.nxtbook.com/nxtbooks/ashrae/ashrae_meetinginsert_201610
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2016fall_v2
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2016fall
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_acrexindia
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2015summer_v2
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2015summer
https://www.nxtbook.com/nxtbooks/amca/2014summer2
https://www.nxtbook.com/nxtbooks/amca/2014summer
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_acma_2014summer
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201311
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201309
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_acmasupp_2013fall
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201305
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201303
https://www.nxtbook.com/nxtbooks/ashrae/pubcatalog_2013winter
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201211
https://www.nxtbook.com/nxtbooks/ashrae/achr_expo_mexico2012
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201209
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201208_v3
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201208_v2
https://www.nxtbook.com/nxtbooks/ashrae/pubcatalog_2012summer
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201205
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201203
https://www.nxtbook.com/nxtbooks/ashrae/pubcatalog_2012winter
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201111_v2
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201109_v2
https://www.nxtbook.com/nxtbooks/ashrae/pubcatalog_2011summer
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201105
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201103
https://www.nxtbookmedia.com