ASHRAE Journal - February 2014 - 53

OPR and [verifying that] the components, systems, and
assemblies in the design directly relate to the testability,
accessibility, maintainability, efficient operation, and
industry-accepted best practices" [italics in original text].
Design phase commissioning is the process of comparing each element of the design to the OPR... [and helping] the design team [ensure that] the Basis of Design
meets the requirements of the [OPR]."
Both definitions are rather flexibly worded and do not
define the details of the CxA's many DPC functions. For
example, DPC should include an independent review
of the contract documents to identify items that may
be missing or issues that may be improperly or incompletely documented.
DPC is not an engineering "peer review" process.
Instead, the goal of DPC is to review the project's design
documents and identify issues during the schematic
design (SD) process-well before any actual design work
is completed. After all, to be successful, a project doesn't
need false starts or design rework. The ultimate objective is
a building that works properly, can be tested to verify correct operation, and then maintained on an ongoing basis.
DPC provides an important quality check that is missing from too many construction projects.

Who's Responsible?
I sometimes hear a CxA say, "We'll review the design
to ensure that the building has appropriate means and
devices that will enable specific tests to be performed
and conditions to be measured during commissioning. We'll also review the drawings to ensure there are
adequate spaces and clearances for performing routine
maintenance. But the engineer of record is responsible
for the building's design."
It's true that engineers are responsible for building
design. But the commissioning process exists because
traditional design, engineering, construction, and startup processes too often have delivered buildings that
don't meet owner expectations. A properly executed
commissioning process provides a system of checks and
balances that is more likely to yield the result the owner
is seeking.
Bottom line? The CxA's job is to drive the commissioning process.

Careful Document Review: Key to Success
On a problem project, everyone is potentially subject to
callbacks, review meetings, and litigation. So it's in the

CxA's best interest to review the project documents as if
he or she were the project's designer.
The CxA needs to be confident that the building
will operate in accordance with the OPR document.
Therefore, the CxA team should be comprised of professionals who are experts in the design and operation
of their various areas of specialization (architecture,
mechanical, electrical, etc.).
It's important to stress the impact of the OPR and BOD
documents in DPC. A well-written OPR clearly spotlights
a wide range of design specific considerations, and an
effective BOD document explains how the design team
will address those considerations.
The goal of commissioning is to produce a building
that works, so it's unwise to begin DPC when the construction drawings are already 50% complete. A design
change at that point in the project can become a costly
proposition for both the owner and the A/E firm, and
can create an adversarial relationship between them.
The commissioning process will fail if the CxA doesn't
question apparent inconsistencies. For example, an
air-handling system that generates 0.5 in. of static
pressure (124 Pa) cannot deliver the airflows required
for a system that is designed around 1.5 in. of pressure (373 Pa). Such an error in specifying static pressure would prevent the HVAC system from providing
design mandated airflow volume throughout the entire
building.
By beginning DPC during the schematic design process, such mistakes can be found and corrected before
they become costly and burdensome. DPC continues
through the creation of the design development (DD)
documents and is finalized during the preparation of
the construction drawings (CD)-but before the project
bidding process begins.
While effective DPC should include detailed reviews
of the project's architectural, mechanical, and electrical
(A/M/E) components, technical commissioning does not
typically include code, structural, or civil engineering
reviews (although such elements may sometimes be
evaluated for specific projects). Therefore, this series of
articles deals only with the A/M/E-related portions of the
construction process.

Architectural Design Review
The first category of DPC considerations the CxA must
evaluate relates to the building's architectural design
elements. Based on our experience, some of the more
FEBRUARY 2014

ashrae.org

ashraE JourNal

53



ASHRAE Journal - February 2014

Table of Contents for the Digital Edition of ASHRAE Journal - February 2014

ASHRAE Journal - February 2014
Contents
Commentary
Industry News
Letters
Meetings and Shows
Feature Articles
Understanding Salaries in the A/E Industry
Improving Operating Room Contamination Control
Standing Columns
Engineer's Notebook
Saving Energy with Cooling Towers
Building Sciences
ACREX India 2014 Show Guide
HVAC Applications
Technical vs. Process Commissioning: Design Phase Commissioning
Data Centers
IAQ Applications
Energy Modeling
InfoCenter
Refrigeration Applications
Products
Classified Advertising
Advertisers Index
ASHRAE Journal - February 2014 - ASHRAE Journal - February 2014
ASHRAE Journal - February 2014 - Cover2
ASHRAE Journal - February 2014 - 1
ASHRAE Journal - February 2014 - 2
ASHRAE Journal - February 2014 - Contents
ASHRAE Journal - February 2014 - Commentary
ASHRAE Journal - February 2014 - 5
ASHRAE Journal - February 2014 - Industry News
ASHRAE Journal - February 2014 - 7
ASHRAE Journal - February 2014 - 8
ASHRAE Journal - February 2014 - Letters
ASHRAE Journal - February 2014 - Meetings and Shows
ASHRAE Journal - February 2014 - 11
ASHRAE Journal - February 2014 - Understanding Salaries in the A/E Industry
ASHRAE Journal - February 2014 - 13
ASHRAE Journal - February 2014 - 14
ASHRAE Journal - February 2014 - 15
ASHRAE Journal - February 2014 - 16
ASHRAE Journal - February 2014 - 17
ASHRAE Journal - February 2014 - Improving Operating Room Contamination Control
ASHRAE Journal - February 2014 - 19
ASHRAE Journal - February 2014 - 20
ASHRAE Journal - February 2014 - 21
ASHRAE Journal - February 2014 - 22
ASHRAE Journal - February 2014 - 23
ASHRAE Journal - February 2014 - 24
ASHRAE Journal - February 2014 - 25
ASHRAE Journal - February 2014 - 26
ASHRAE Journal - February 2014 - 27
ASHRAE Journal - February 2014 - Engineer's Notebook
ASHRAE Journal - February 2014 - 29
ASHRAE Journal - February 2014 - 30
ASHRAE Journal - February 2014 - 31
ASHRAE Journal - February 2014 - 32
ASHRAE Journal - February 2014 - 33
ASHRAE Journal - February 2014 - Saving Energy with Cooling Towers
ASHRAE Journal - February 2014 - 35
ASHRAE Journal - February 2014 - 36
ASHRAE Journal - February 2014 - 37
ASHRAE Journal - February 2014 - 38
ASHRAE Journal - February 2014 - 39
ASHRAE Journal - February 2014 - 40
ASHRAE Journal - February 2014 - 41
ASHRAE Journal - February 2014 - Building Sciences
ASHRAE Journal - February 2014 - 43
ASHRAE Journal - February 2014 - 44
ASHRAE Journal - February 2014 - 45
ASHRAE Journal - February 2014 - 46
ASHRAE Journal - February 2014 - 47
ASHRAE Journal - February 2014 - 48
ASHRAE Journal - February 2014 - ACREX India 2014 Show Guide
ASHRAE Journal - February 2014 - SCover2
ASHRAE Journal - February 2014 - S1
ASHRAE Journal - February 2014 - S2
ASHRAE Journal - February 2014 - S3
ASHRAE Journal - February 2014 - S4
ASHRAE Journal - February 2014 - S5
ASHRAE Journal - February 2014 - S6
ASHRAE Journal - February 2014 - S7
ASHRAE Journal - February 2014 - S8
ASHRAE Journal - February 2014 - S9
ASHRAE Journal - February 2014 - S10
ASHRAE Journal - February 2014 - S11
ASHRAE Journal - February 2014 - S12
ASHRAE Journal - February 2014 - S13
ASHRAE Journal - February 2014 - S14
ASHRAE Journal - February 2014 - S15
ASHRAE Journal - February 2014 - S16
ASHRAE Journal - February 2014 - S17
ASHRAE Journal - February 2014 - S18
ASHRAE Journal - February 2014 - S19
ASHRAE Journal - February 2014 - S20
ASHRAE Journal - February 2014 - S21
ASHRAE Journal - February 2014 - SCover4
ASHRAE Journal - February 2014 - HVAC Applications
ASHRAE Journal - February 2014 - 50
ASHRAE Journal - February 2014 - 51
ASHRAE Journal - February 2014 - Technical vs. Process Commissioning: Design Phase Commissioning
ASHRAE Journal - February 2014 - 53
ASHRAE Journal - February 2014 - 54
ASHRAE Journal - February 2014 - 55
ASHRAE Journal - February 2014 - 56
ASHRAE Journal - February 2014 - 57
ASHRAE Journal - February 2014 - Data Centers
ASHRAE Journal - February 2014 - 59
ASHRAE Journal - February 2014 - 60
ASHRAE Journal - February 2014 - 61
ASHRAE Journal - February 2014 - IAQ Applications
ASHRAE Journal - February 2014 - 63
ASHRAE Journal - February 2014 - 64
ASHRAE Journal - February 2014 - 65
ASHRAE Journal - February 2014 - 66
ASHRAE Journal - February 2014 - 67
ASHRAE Journal - February 2014 - Energy Modeling
ASHRAE Journal - February 2014 - 69
ASHRAE Journal - February 2014 - InfoCenter
ASHRAE Journal - February 2014 - 71
ASHRAE Journal - February 2014 - 72
ASHRAE Journal - February 2014 - 73
ASHRAE Journal - February 2014 - Refrigeration Applications
ASHRAE Journal - February 2014 - 75
ASHRAE Journal - February 2014 - Products
ASHRAE Journal - February 2014 - 77
ASHRAE Journal - February 2014 - 78
ASHRAE Journal - February 2014 - Classified Advertising
ASHRAE Journal - February 2014 - Advertisers Index
ASHRAE Journal - February 2014 - Cover3
ASHRAE Journal - February 2014 - Cover4
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_MCDEBX
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_WNYSQY
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_XATVOD
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_FJSHSS
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_CCBZDS
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_XDEFVG
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2023november_v2
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2023november
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_VHGNBL
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_WPKBNJ
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_UUVCDE
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_RTGDEW
https://www.nxtbook.com/nxtbooks/ashrae/ashraemexico_2023
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_LKRFXS
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_AZSOFG
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_ERCDBH
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_QWDFRV
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_JHGVDF
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_OPUYHG
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_SREIBM
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_LRTGLK
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_OKRFGH
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2022november_v2
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2022november
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_TZSERA
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_LVRUIX
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_RPTVYZ
https://www.nxtbook.com/nxtbooks/ashrae/mini_pub_catalog
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_XIYTGD
https://www.nxtbook.com/nxtbooks/ashrae/ashraemexico_2022
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_RFGDOB
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_PABXNU
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_REMKLS
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_PICVBT
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_AOYTVW
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_JQOPLS
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_IOYTBC
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_SGAJJF
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_IGHYER
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_PDRKLS
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2021november
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2021november_v2
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_XCODFR
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_QSLFGO
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_ILKVNM
https://www.nxtbook.com/nxtbooks/ashrae/ashraemexico_2021
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_OPDJKD
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_VJKSRY
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_SDHUTC
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_JPPKRR
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_SDLTTH
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_CKLLES
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_SLDOX
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_HJETUK
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_OLUHGE
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2020october
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2020october_v2
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_ZERDGH
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_QVMNEO
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_RTPOKE
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_BBATRE
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_STUBMW
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_TPEMPE
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_JNMKDS
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_FBTTPA
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_WQMMNE
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_TVBRYN
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_showguide2020
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_KTUZMA
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_ABEDGD
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201910
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201909
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2019septmeber_v2
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2019september
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201908
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201907
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201906
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201905
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201904
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_2019april
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201903
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_2019march
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201902
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201901
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_showguide2019
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_2018december
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_2018november
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2018fall_v2
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2018fall
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_2018october
https://www.nxtbook.com/nxtbooks/ashrae/ashraemexico_2018
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201810
https://www.nxtbook.com/nxtbooks/ashrae/ashraeinsights_201806
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201805
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201804
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201803
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201712
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201711
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201710
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2017fall_v2
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2017fall
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201709
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201705
https://www.nxtbook.com/nxtbooks/ashrae/ashrae_meetinginsert_201610
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2016fall_v2
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2016fall
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_acrexindia
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2015summer_v2
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2015summer
https://www.nxtbook.com/nxtbooks/amca/2014summer2
https://www.nxtbook.com/nxtbooks/amca/2014summer
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_acma_2014summer
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201311
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201309
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_acmasupp_2013fall
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201305
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201303
https://www.nxtbook.com/nxtbooks/ashrae/pubcatalog_2013winter
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201211
https://www.nxtbook.com/nxtbooks/ashrae/achr_expo_mexico2012
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201209
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201208_v3
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201208_v2
https://www.nxtbook.com/nxtbooks/ashrae/pubcatalog_2012summer
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201205
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201203
https://www.nxtbook.com/nxtbooks/ashrae/pubcatalog_2012winter
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201111_v2
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201109_v2
https://www.nxtbook.com/nxtbooks/ashrae/pubcatalog_2011summer
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201105
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201103
https://www.nxtbookmedia.com