completed), "Desirable," and "If Possible." There were
entries about building function, sustainability, safety,
and energy to name a few. The RFP and the prioritized
list represented the voice of the owner. It was agreed
early on that this document would not conceptually
change and that when questions arose, the RFP would
be referenced. A NREL Project Manager would be
responsible for implementing the RFP without change.
It was key that the owner did not change the prioritization during the entire building delivery process.
A short-listed group of contractors competed and
their conceptual designs were evaluated on the ability
to achieve the prioritized list in order given a constraint
of a fixed price. Conceptually, this was the wish list and
selection would be made on who provided the most
value. While the project did not start out to be a zeroenergy building (ZEB), the successful bidder showed
that they could deliver the project with the potential
to be zero-energy within the budget ceiling. As seen in
the sidebar, "Aligning Program Metrics With the Energy
Goal," the ZEB goal was quite far down the list.

BASautomation

®

To be successful, the contractor's team relied heavily
on strong communication and management skills to
drive the process. At the proposal stage, the contractor
engaged an energy modeler to help inform the conceptual design required by the proposal. This helped fold
the energy features into the architecture and the function of the building-leveraging those costs. As the project progressed, the sub-contractors were critical to providing innovation around controlling costs. Repetition
was a key element which factored into the design. The
building was built around a standard module with precast insulated concrete panels including the windows.
The efficiency around the thermal envelope, coupled
with the daylighting enabled the use of radiant heating
and cooling in the ceiling slab-and an innovative technique of placing the tubing provided a cost point that
was achievable on the building's budget.
The end result was a Phase 1 project (240,000 ft2 [22
297 ft2]) that uses half the energy as a traditional building producing as much energy as it consumes, including the corporate data center located in the building

- Building on BACnet ®

CTRLink

®

BACnet/IP Sedona
Controllers

BACnet Routers &
Modbus Gateways

Web-based Graphical
Head-End

www.ccontrols.com/BACnet

For
www.ccontrols.com
24

ASHRAE JOURNAL

p. 630.963.7070
ashrae.org

APRI L 2015

PnP and Managed Switches
Wired & Wireless IP Routers

www.info.hotims.com/54427-21

info@ccontrols.com



ASHRAE Journal - April 2015

Table of Contents for the Digital Edition of ASHRAE Journal - April 2015

Contents
ASHRAE Journal - April 2015 - Cover1
ASHRAE Journal - April 2015 - Cover2
ASHRAE Journal - April 2015 - 1
ASHRAE Journal - April 2015 - 2
ASHRAE Journal - April 2015 - Contents
ASHRAE Journal - April 2015 - 4
ASHRAE Journal - April 2015 - 5
ASHRAE Journal - April 2015 - 6
ASHRAE Journal - April 2015 - 7
ASHRAE Journal - April 2015 - 8
ASHRAE Journal - April 2015 - 9
ASHRAE Journal - April 2015 - 10
ASHRAE Journal - April 2015 - 11
ASHRAE Journal - April 2015 - 12
ASHRAE Journal - April 2015 - 13
ASHRAE Journal - April 2015 - 14
ASHRAE Journal - April 2015 - 15
ASHRAE Journal - April 2015 - 16
ASHRAE Journal - April 2015 - 17
ASHRAE Journal - April 2015 - 18
ASHRAE Journal - April 2015 - 19
ASHRAE Journal - April 2015 - 20
ASHRAE Journal - April 2015 - 21
ASHRAE Journal - April 2015 - 22
ASHRAE Journal - April 2015 - 23
ASHRAE Journal - April 2015 - 24
ASHRAE Journal - April 2015 - 25
ASHRAE Journal - April 2015 - 26
ASHRAE Journal - April 2015 - 27
ASHRAE Journal - April 2015 - 28
ASHRAE Journal - April 2015 - 29
ASHRAE Journal - April 2015 - 30
ASHRAE Journal - April 2015 - 31
ASHRAE Journal - April 2015 - 32
ASHRAE Journal - April 2015 - 33
ASHRAE Journal - April 2015 - 34
ASHRAE Journal - April 2015 - 35
ASHRAE Journal - April 2015 - 36
ASHRAE Journal - April 2015 - 37
ASHRAE Journal - April 2015 - 38
ASHRAE Journal - April 2015 - 39
ASHRAE Journal - April 2015 - 40
ASHRAE Journal - April 2015 - 41
ASHRAE Journal - April 2015 - 42
ASHRAE Journal - April 2015 - 43
ASHRAE Journal - April 2015 - 44
ASHRAE Journal - April 2015 - 45
ASHRAE Journal - April 2015 - 46
ASHRAE Journal - April 2015 - 47
ASHRAE Journal - April 2015 - 48
ASHRAE Journal - April 2015 - 49
ASHRAE Journal - April 2015 - 50
ASHRAE Journal - April 2015 - 51
ASHRAE Journal - April 2015 - 52
ASHRAE Journal - April 2015 - 53
ASHRAE Journal - April 2015 - 54
ASHRAE Journal - April 2015 - 55
ASHRAE Journal - April 2015 - 56
ASHRAE Journal - April 2015 - 57
ASHRAE Journal - April 2015 - 58
ASHRAE Journal - April 2015 - 59
ASHRAE Journal - April 2015 - 60
ASHRAE Journal - April 2015 - 61
ASHRAE Journal - April 2015 - 62
ASHRAE Journal - April 2015 - 63
ASHRAE Journal - April 2015 - 64
ASHRAE Journal - April 2015 - 65
ASHRAE Journal - April 2015 - 66
ASHRAE Journal - April 2015 - 67
ASHRAE Journal - April 2015 - 68
ASHRAE Journal - April 2015 - 69
ASHRAE Journal - April 2015 - 70
ASHRAE Journal - April 2015 - 71
ASHRAE Journal - April 2015 - 72
ASHRAE Journal - April 2015 - 73
ASHRAE Journal - April 2015 - 74
ASHRAE Journal - April 2015 - 75
ASHRAE Journal - April 2015 - 76
ASHRAE Journal - April 2015 - 77
ASHRAE Journal - April 2015 - 78
ASHRAE Journal - April 2015 - 79
ASHRAE Journal - April 2015 - 80
ASHRAE Journal - April 2015 - 81
ASHRAE Journal - April 2015 - 82
ASHRAE Journal - April 2015 - 83
ASHRAE Journal - April 2015 - 84
ASHRAE Journal - April 2015 - 85
ASHRAE Journal - April 2015 - 86
ASHRAE Journal - April 2015 - 87
ASHRAE Journal - April 2015 - 88
ASHRAE Journal - April 2015 - Cover3
ASHRAE Journal - April 2015 - Cover4
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_MCDEBX
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_WNYSQY
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_XATVOD
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_FJSHSS
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_CCBZDS
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_XDEFVG
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2023november_v2
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2023november
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_VHGNBL
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_WPKBNJ
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_UUVCDE
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_RTGDEW
https://www.nxtbook.com/nxtbooks/ashrae/ashraemexico_2023
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_LKRFXS
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_AZSOFG
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_ERCDBH
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_QWDFRV
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_JHGVDF
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_OPUYHG
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_SREIBM
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_LRTGLK
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_OKRFGH
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2022november_v2
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2022november
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_TZSERA
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_LVRUIX
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_RPTVYZ
https://www.nxtbook.com/nxtbooks/ashrae/mini_pub_catalog
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_XIYTGD
https://www.nxtbook.com/nxtbooks/ashrae/ashraemexico_2022
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_RFGDOB
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_PABXNU
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_REMKLS
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_PICVBT
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_AOYTVW
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_JQOPLS
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_IOYTBC
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_SGAJJF
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_IGHYER
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_PDRKLS
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2021november
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2021november_v2
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_XCODFR
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_QSLFGO
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_ILKVNM
https://www.nxtbook.com/nxtbooks/ashrae/ashraemexico_2021
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_OPDJKD
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_VJKSRY
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_SDHUTC
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_JPPKRR
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_SDLTTH
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_CKLLES
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_SLDOX
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_HJETUK
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_OLUHGE
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2020october
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2020october_v2
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_ZERDGH
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_QVMNEO
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_RTPOKE
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_BBATRE
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_STUBMW
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_TPEMPE
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_JNMKDS
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_FBTTPA
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_WQMMNE
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_TVBRYN
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_showguide2020
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_KTUZMA
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_ABEDGD
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201910
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201909
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2019septmeber_v2
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2019september
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201908
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201907
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201906
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201905
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201904
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_2019april
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201903
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_2019march
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201902
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201901
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_showguide2019
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_2018december
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_2018november
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2018fall_v2
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2018fall
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_2018october
https://www.nxtbook.com/nxtbooks/ashrae/ashraemexico_2018
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201810
https://www.nxtbook.com/nxtbooks/ashrae/ashraeinsights_201806
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201805
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201804
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201803
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201712
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201711
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201710
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2017fall_v2
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2017fall
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201709
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201705
https://www.nxtbook.com/nxtbooks/ashrae/ashrae_meetinginsert_201610
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2016fall_v2
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2016fall
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_acrexindia
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2015summer_v2
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2015summer
https://www.nxtbook.com/nxtbooks/amca/2014summer2
https://www.nxtbook.com/nxtbooks/amca/2014summer
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_acma_2014summer
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201311
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201309
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_acmasupp_2013fall
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201305
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201303
https://www.nxtbook.com/nxtbooks/ashrae/pubcatalog_2013winter
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201211
https://www.nxtbook.com/nxtbooks/ashrae/achr_expo_mexico2012
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201209
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201208_v3
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201208_v2
https://www.nxtbook.com/nxtbooks/ashrae/pubcatalog_2012summer
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201205
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201203
https://www.nxtbook.com/nxtbooks/ashrae/pubcatalog_2012winter
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201111_v2
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201109_v2
https://www.nxtbook.com/nxtbooks/ashrae/pubcatalog_2011summer
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201105
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201103
https://www.nxtbookmedia.com