High Performing Buildings - Winter 2008 - (Page 13) No part of the floor is more than 30 ft from a window. Photo © Timothy Hursley the ventilation units is insufficient, adequate or excessive. Based on the relative humidity measurements, the temperature of air leaving the ventilation unit is raised or lowered to maintain the design humidity level in the space. As the setpoint of the ventilation unit is changed, the required chilled water temperature is also changed, resulting in higher chiller efficiency as the required water temperature is raised. Energy Use Summary primary pumping system was designed for the chilled water system. The control of the variable speed chilled water pump uses critical zone reset to maintain the required flow to all of the cooling coils. Critical zone reset is part of the prescriptive requirements of Standard 90.1 for the air side of VAV systems. It also can be used with water systems although this is not required by Standard 90.1. Critical zone reset reads the position of each control valve and adjusts the pressure so that at least one valve is 85% open and no valve is more than 95% open. Control valves add resistance in order to limit the flow allowed through the valve. If the valve is more open, less pressure is required to deliver the needed flow. The 95% value is chosen to allow for the lag of the system in changing pressure values so that no zone is lacking water needed to meet the load. The 85% is chosen to allow for a 10% acceptable range and to introduce additional stability into the control loop. The combination of reduced flow and reduced pressure, while still meeting the load, significantly reduces pumping costs for the project. Pumping energy calculated for this project saves 57.2% of the energy required by the Standard 90.1 budget building. The heated and cooled part of the building encompasses a little over 83,000 ft2 in four stories. The energy use is 44,816 Btu/ft2 per year. This compares to the Standard 90.1 budget building at 95,979 Btu/ft2 per year, for a savings of 56.1%. The LEED® savings of 53.6% is based on the estimated dollar value of projected utility bills. The largest single group of points in the LEED® system is directed to optimize energy performance with 10 points available. This project earned nine of those points. The success is a result of the team approach and the sustainable goals set forth by the building owner. As Heifer International continues to address the problems of hunger in the world, they demonstrate that green can be functional and attractive, as well as energy efficient. They also act as good stewards of resources that are necessary for the fulfillment of their mission. • ABOUT THE AUTHORS Reese Rowland is a design principal at Polk Stanley Rowland Curzon Porter Architects, Ltd. Todd Kuhn, P is a .E., mechanical engineer and John Hodoway is a senior mechanical designer at Cromwell Architects Engineers, Inc. 13 Heating System Heating water is produced by two pulse-combustion high-efficiency boilers. Finned-tube heating convectors are located in recesses along the outside walls of the building to offset heat losses in winter. Heating water flow is also variable, but the many small control valves made implementation of critical zone reset impractical. Therefore, a convention differential pressure control system was used for the hot water pumping system. Comfort Control Systems A direct digital control system was provided to control all of the building systems. Controls were carefully set up to prevent simultaneous use of heating and cooling in the same space. Furthermore, space sensors that include relative humidity are used at various locations in the building. These sensors determine if the dehumidification provided by Winter 2008 HIGH PERFORMING BUILDINGS
Table of Contents Feed for the Digital Edition of High Performing Buildings - Winter 2008 High Performance Buildings - Winter 2008 Passing On the Gift: Heifer International Headquarters Head of the Class: University of Florida’s Rinker Hall How Far Can You Go? Pearl River Tower The Proof Is Performance: How Does 4 Times Square Measure Up? Lighting the Way: Two Guilford County Schools Montreal’s Retail Example: Mountain Equipment Co-op® (MEC) High Performing Buildings - Winter 2008 High Performing Buildings - Winter 2008 - High Performance Buildings - Winter 2008 (Page Cover1) High Performing Buildings - Winter 2008 - High Performance Buildings - Winter 2008 (Page Cover2) High Performing Buildings - Winter 2008 - High Performance Buildings - Winter 2008 (Page 1) High Performing Buildings - Winter 2008 - High Performance Buildings - Winter 2008 (Page 2) High Performing Buildings - Winter 2008 - High Performance Buildings - Winter 2008 (Page 3) High Performing Buildings - Winter 2008 - Passing On the Gift: Heifer International Headquarters (Page 4) High Performing Buildings - Winter 2008 - Passing On the Gift: Heifer International Headquarters (Page 5) High Performing Buildings - Winter 2008 - Passing On the Gift: Heifer International Headquarters (Page 6) High Performing Buildings - Winter 2008 - Passing On the Gift: Heifer International Headquarters (Page 7) High Performing Buildings - Winter 2008 - Passing On the Gift: Heifer International Headquarters (Page 8) High Performing Buildings - Winter 2008 - Passing On the Gift: Heifer International Headquarters (Page 9) High Performing Buildings - Winter 2008 - Passing On the Gift: Heifer International Headquarters (Page 10) High Performing Buildings - Winter 2008 - Passing On the Gift: Heifer International Headquarters (Page 11) High Performing Buildings - Winter 2008 - Passing On the Gift: Heifer International Headquarters (Page 12) High Performing Buildings - Winter 2008 - Passing On the Gift: Heifer International Headquarters (Page 13) High Performing Buildings - Winter 2008 - Head of the Class: University of Florida’s Rinker Hall (Page 14) High Performing Buildings - Winter 2008 - Head of the Class: University of Florida’s Rinker Hall (Page 15) High Performing Buildings - Winter 2008 - Head of the Class: University of Florida’s Rinker Hall (Page 16) High Performing Buildings - Winter 2008 - Head of the Class: University of Florida’s Rinker Hall (Page 17) High Performing Buildings - Winter 2008 - Head of the Class: University of Florida’s Rinker Hall (Page 18) High Performing Buildings - Winter 2008 - Head of the Class: University of Florida’s Rinker Hall (Page 19) High Performing Buildings - Winter 2008 - Head of the Class: University of Florida’s Rinker Hall (Page 20) High Performing Buildings - Winter 2008 - Head of the Class: University of Florida’s Rinker Hall (Page 21) High Performing Buildings - Winter 2008 - How Far Can You Go? Pearl River Tower (Page 22) High Performing Buildings - Winter 2008 - How Far Can You Go? Pearl River Tower (Page 23) High Performing Buildings - Winter 2008 - How Far Can You Go? Pearl River Tower (Page 24) High Performing Buildings - Winter 2008 - How Far Can You Go? Pearl River Tower (Page 25) High Performing Buildings - Winter 2008 - How Far Can You Go? Pearl River Tower (Page 26) High Performing Buildings - Winter 2008 - How Far Can You Go? Pearl River Tower (Page 27) High Performing Buildings - Winter 2008 - How Far Can You Go? Pearl River Tower (Page 28) High Performing Buildings - Winter 2008 - How Far Can You Go? Pearl River Tower (Page 29) High Performing Buildings - Winter 2008 - The Proof Is Performance: How Does 4 Times Square Measure Up? (Page 30) High Performing Buildings - Winter 2008 - The Proof Is Performance: How Does 4 Times Square Measure Up? (Page 31) High Performing Buildings - Winter 2008 - The Proof Is Performance: How Does 4 Times Square Measure Up? (Page 32) High Performing Buildings - Winter 2008 - The Proof Is Performance: How Does 4 Times Square Measure Up? (Page 33) High Performing Buildings - Winter 2008 - The Proof Is Performance: How Does 4 Times Square Measure Up? (Page 34) High Performing Buildings - Winter 2008 - The Proof Is Performance: How Does 4 Times Square Measure Up? (Page 35) High Performing Buildings - Winter 2008 - The Proof Is Performance: How Does 4 Times Square Measure Up? (Page 36) High Performing Buildings - Winter 2008 - The Proof Is Performance: How Does 4 Times Square Measure Up? (Page 37) High Performing Buildings - Winter 2008 - Lighting the Way: Two Guilford County Schools (Page 38) High Performing Buildings - Winter 2008 - Lighting the Way: Two Guilford County Schools (Page 39) High Performing Buildings - Winter 2008 - Lighting the Way: Two Guilford County Schools (Page 40) High Performing Buildings - Winter 2008 - Lighting the Way: Two Guilford County Schools (Page 41) High Performing Buildings - Winter 2008 - Lighting the Way: Two Guilford County Schools (Page 42) High Performing Buildings - Winter 2008 - Lighting the Way: Two Guilford County Schools (Page 43) High Performing Buildings - Winter 2008 - Lighting the Way: Two Guilford County Schools (Page 44) High Performing Buildings - Winter 2008 - Lighting the Way: Two Guilford County Schools (Page 45) High Performing Buildings - Winter 2008 - Lighting the Way: Two Guilford County Schools (Page 46) High Performing Buildings - Winter 2008 - Lighting the Way: Two Guilford County Schools (Page 47) High Performing Buildings - Winter 2008 - Montreal’s Retail Example: Mountain Equipment Co-op® (MEC) (Page 48) High Performing Buildings - Winter 2008 - Montreal’s Retail Example: Mountain Equipment Co-op® (MEC) (Page 49) High Performing Buildings - Winter 2008 - Montreal’s Retail Example: Mountain Equipment Co-op® (MEC) (Page 50) High Performing Buildings - Winter 2008 - Montreal’s Retail Example: Mountain Equipment Co-op® (MEC) (Page 51) High Performing Buildings - Winter 2008 - Montreal’s Retail Example: Mountain Equipment Co-op® (MEC) (Page 52) High Performing Buildings - Winter 2008 - Montreal’s Retail Example: Mountain Equipment Co-op® (MEC) (Page 53) High Performing Buildings - Winter 2008 - Montreal’s Retail Example: Mountain Equipment Co-op® (MEC) (Page 54) High Performing Buildings - Winter 2008 - Montreal’s Retail Example: Mountain Equipment Co-op® (MEC) (Page 55) High Performing Buildings - Winter 2008 - Montreal’s Retail Example: Mountain Equipment Co-op® (MEC) (Page 56) High Performing Buildings - Winter 2008 - Montreal’s Retail Example: Mountain Equipment Co-op® (MEC) (Page Cover3) High Performing Buildings - Winter 2008 - Montreal’s Retail Example: Mountain Equipment Co-op® (MEC) (Page Cover4)
For optimal viewing of this digital publication, please enable JavaScript and then refresh the page. If you would like to try to load the digital publication without using Flash Player detection, please click here.