High Performing Buildings - Winter 2008 - (Page 45) screen area and the television monitors without blocking views and without the need for operable clerestory window shading devices. South-Facing Roof Monitors Daylighting in the gymnasium, multipurpose and dining areas of the schools is provided by south-facing roof monitors with translucent fabric baffles in the light wells. These features eliminate potential direct beam radiation, reduce glare, and effectively diffuse light throughout the spaces. Clear double glazing maximizes visible light transmittance and minimizes glass-to-floor ratio. Optimally sized overhangs above the monitor windows protect the spaces from direct light during peak cooling periods. The monitor approach was used because of the large room dimensions and/or because the ceiling cavity is the thickness of the roofing system. Therefore, the reflective losses associated with deep ceiling cavities were eliminated. Indirect fluorescent lighting, compatible with daylighting, is installed throughout both schools. The lighting is dimmable and controlled by an occupancy sensor and a photocell sensor that work in conjunction with the natural daylight to minimize the need for artificial light. In spaces only used during the day, such as classrooms, where 60 footcandles is desired, one-sixth of the initial light fixture cost was saved since daylighting provides at least 10 footcandles even on the cloudiest day. design approach that addresses the roof assembly, indirect lighting, and underfloor air-distribution system cut the installed tonnage at Northern Guilford by 75 tons and at Reedy Fork by 60 tons. Through daylighting simulations and DOE-2 analysis, it is predicted that daylighting will reduce the lighting energy by 49% at Reedy Fork and 50% at Northern Guilford. Because many of the school spaces are used well beyond typical school hours, the savings are greater and the return on investment is almost immediate. Results At both Northern Guilford Middle and Reedy Fork Elementary, daylight is the primary source of light within all educational and administrative spaces during two-thirds of the school day. The daylighting strategies produce half the amount of heat as fluorescent fixtures providing the same amount of lighting. Daylighting’s positive impact on cooling loads and the integrated LESSONS LEARNED In developing the daylighting strategy for Northern Guilford and Reedy Fork, the design team drew upon past experiences to avoid downfalls and maximize benefits. Human Factors To prevent teachers and students from overriding the controls and turning on the lights, the norm needed to be superior lighting from daylighting. The goal was to achieve in excess of 50 footcandles from daylighting for two-thirds of the school day. The design team did not count on view glass. Because low windows serve as good display areas, they were not considered for good daylighting. Technical Issues The design team focused primarily on south-facing glass. Passive heating benefits are important and south glazing requires 25% less glass area to achieve the same annual contribution as north-facing glazing. They also considered the limitations of interior lightshelves. Typical interior lightshelves are flat and solid. Since south-facing windows are difficult to control in terms of glare, the blinds on these windows are typically closed, resulting in darkness right under the lightshelf. Control Strategies Indirect lighting created a lighting scheme that is visually consistent with daylighting. The design team found that indirect lighting, if not using daylighting, is useful in halls in place of lay-in fixtures which produce a glare and make the space seem brighter than the classrooms. South-facing roof monitor with baffles in Northern Guilford’s gymnasium. Winter 2008 HIGH PERFORMING BUILDINGS 45
Table of Contents Feed for the Digital Edition of High Performing Buildings - Winter 2008 High Performance Buildings - Winter 2008 Passing On the Gift: Heifer International Headquarters Head of the Class: University of Florida’s Rinker Hall How Far Can You Go? Pearl River Tower The Proof Is Performance: How Does 4 Times Square Measure Up? Lighting the Way: Two Guilford County Schools Montreal’s Retail Example: Mountain Equipment Co-op® (MEC) High Performing Buildings - Winter 2008 High Performing Buildings - Winter 2008 - High Performance Buildings - Winter 2008 (Page Cover1) High Performing Buildings - Winter 2008 - High Performance Buildings - Winter 2008 (Page Cover2) High Performing Buildings - Winter 2008 - High Performance Buildings - Winter 2008 (Page 1) High Performing Buildings - Winter 2008 - High Performance Buildings - Winter 2008 (Page 2) High Performing Buildings - Winter 2008 - High Performance Buildings - Winter 2008 (Page 3) High Performing Buildings - Winter 2008 - Passing On the Gift: Heifer International Headquarters (Page 4) High Performing Buildings - Winter 2008 - Passing On the Gift: Heifer International Headquarters (Page 5) High Performing Buildings - Winter 2008 - Passing On the Gift: Heifer International Headquarters (Page 6) High Performing Buildings - Winter 2008 - Passing On the Gift: Heifer International Headquarters (Page 7) High Performing Buildings - Winter 2008 - Passing On the Gift: Heifer International Headquarters (Page 8) High Performing Buildings - Winter 2008 - Passing On the Gift: Heifer International Headquarters (Page 9) High Performing Buildings - Winter 2008 - Passing On the Gift: Heifer International Headquarters (Page 10) High Performing Buildings - Winter 2008 - Passing On the Gift: Heifer International Headquarters (Page 11) High Performing Buildings - Winter 2008 - Passing On the Gift: Heifer International Headquarters (Page 12) High Performing Buildings - Winter 2008 - Passing On the Gift: Heifer International Headquarters (Page 13) High Performing Buildings - Winter 2008 - Head of the Class: University of Florida’s Rinker Hall (Page 14) High Performing Buildings - Winter 2008 - Head of the Class: University of Florida’s Rinker Hall (Page 15) High Performing Buildings - Winter 2008 - Head of the Class: University of Florida’s Rinker Hall (Page 16) High Performing Buildings - Winter 2008 - Head of the Class: University of Florida’s Rinker Hall (Page 17) High Performing Buildings - Winter 2008 - Head of the Class: University of Florida’s Rinker Hall (Page 18) High Performing Buildings - Winter 2008 - Head of the Class: University of Florida’s Rinker Hall (Page 19) High Performing Buildings - Winter 2008 - Head of the Class: University of Florida’s Rinker Hall (Page 20) High Performing Buildings - Winter 2008 - Head of the Class: University of Florida’s Rinker Hall (Page 21) High Performing Buildings - Winter 2008 - How Far Can You Go? Pearl River Tower (Page 22) High Performing Buildings - Winter 2008 - How Far Can You Go? Pearl River Tower (Page 23) High Performing Buildings - Winter 2008 - How Far Can You Go? Pearl River Tower (Page 24) High Performing Buildings - Winter 2008 - How Far Can You Go? Pearl River Tower (Page 25) High Performing Buildings - Winter 2008 - How Far Can You Go? Pearl River Tower (Page 26) High Performing Buildings - Winter 2008 - How Far Can You Go? Pearl River Tower (Page 27) High Performing Buildings - Winter 2008 - How Far Can You Go? Pearl River Tower (Page 28) High Performing Buildings - Winter 2008 - How Far Can You Go? Pearl River Tower (Page 29) High Performing Buildings - Winter 2008 - The Proof Is Performance: How Does 4 Times Square Measure Up? (Page 30) High Performing Buildings - Winter 2008 - The Proof Is Performance: How Does 4 Times Square Measure Up? (Page 31) High Performing Buildings - Winter 2008 - The Proof Is Performance: How Does 4 Times Square Measure Up? (Page 32) High Performing Buildings - Winter 2008 - The Proof Is Performance: How Does 4 Times Square Measure Up? (Page 33) High Performing Buildings - Winter 2008 - The Proof Is Performance: How Does 4 Times Square Measure Up? (Page 34) High Performing Buildings - Winter 2008 - The Proof Is Performance: How Does 4 Times Square Measure Up? (Page 35) High Performing Buildings - Winter 2008 - The Proof Is Performance: How Does 4 Times Square Measure Up? (Page 36) High Performing Buildings - Winter 2008 - The Proof Is Performance: How Does 4 Times Square Measure Up? (Page 37) High Performing Buildings - Winter 2008 - Lighting the Way: Two Guilford County Schools (Page 38) High Performing Buildings - Winter 2008 - Lighting the Way: Two Guilford County Schools (Page 39) High Performing Buildings - Winter 2008 - Lighting the Way: Two Guilford County Schools (Page 40) High Performing Buildings - Winter 2008 - Lighting the Way: Two Guilford County Schools (Page 41) High Performing Buildings - Winter 2008 - Lighting the Way: Two Guilford County Schools (Page 42) High Performing Buildings - Winter 2008 - Lighting the Way: Two Guilford County Schools (Page 43) High Performing Buildings - Winter 2008 - Lighting the Way: Two Guilford County Schools (Page 44) High Performing Buildings - Winter 2008 - Lighting the Way: Two Guilford County Schools (Page 45) High Performing Buildings - Winter 2008 - Lighting the Way: Two Guilford County Schools (Page 46) High Performing Buildings - Winter 2008 - Lighting the Way: Two Guilford County Schools (Page 47) High Performing Buildings - Winter 2008 - Montreal’s Retail Example: Mountain Equipment Co-op® (MEC) (Page 48) High Performing Buildings - Winter 2008 - Montreal’s Retail Example: Mountain Equipment Co-op® (MEC) (Page 49) High Performing Buildings - Winter 2008 - Montreal’s Retail Example: Mountain Equipment Co-op® (MEC) (Page 50) High Performing Buildings - Winter 2008 - Montreal’s Retail Example: Mountain Equipment Co-op® (MEC) (Page 51) High Performing Buildings - Winter 2008 - Montreal’s Retail Example: Mountain Equipment Co-op® (MEC) (Page 52) High Performing Buildings - Winter 2008 - Montreal’s Retail Example: Mountain Equipment Co-op® (MEC) (Page 53) High Performing Buildings - Winter 2008 - Montreal’s Retail Example: Mountain Equipment Co-op® (MEC) (Page 54) High Performing Buildings - Winter 2008 - Montreal’s Retail Example: Mountain Equipment Co-op® (MEC) (Page 55) High Performing Buildings - Winter 2008 - Montreal’s Retail Example: Mountain Equipment Co-op® (MEC) (Page 56) High Performing Buildings - Winter 2008 - Montreal’s Retail Example: Mountain Equipment Co-op® (MEC) (Page Cover3) High Performing Buildings - Winter 2008 - Montreal’s Retail Example: Mountain Equipment Co-op® (MEC) (Page Cover4)
For optimal viewing of this digital publication, please enable JavaScript and then refresh the page. If you would like to try to load the digital publication without using Flash Player detection, please click here.