High Performing Buildings - Fall 2010 - (Page 33)

BuildinG teaM owner lighting design Alliance © rmA Architectural Photography Architect Archint international, lighting design Alliance Project, facility manager lighting design Alliance general Contractor unlimited general Contractors meP engineer Perfect design and development energy modeler lighting design Alliance: sandra novales structural engineer Bruce mcVey area between parking stalls, but requires no water. All plumbing is ultra-low water use, including the faucets, toilets and urinals. A tankless hot water heater was installed to save energy. While under construction, water seeped up through the foundation. Rather than deal with future mold issues, the owners had a portion of the floor removed. French drains and lateral drain pipes were added. At the same time, the large roof drains were rerun to the rear of the property to facilitate future rainwater harvesting. Most of the finishing touches in the building are either recycled Long life and efficient lamps are used in the reception area and throughout the building. New technologies, like LED MR16 bulbs, are installed and tested in a real-world setting. materials or reused. All furniture was bought used, and a mezzanine brought from a demolished building in Mexico created the upper level for future expansion. A wall covering made from recycled blue jeans, seaweed and sawdust particle board creates a bold statement in HPB.hotims.com/33325-16 http://us.exhausto.com http://us.exhausto.com http://HPB.hotims.com/33325-16

Table of Contents for the Digital Edition of High Performing Buildings - Fall 2010

High Performing Buildings - Fall 2010
Table of Contents
IDeAs Z2 Design Facility
Lighting Design Alliance
Manassas Park Elementary School and Prekindergarten
FC Gulf Freeway Office Building
Capturing Condensate
National Australian Built Environment Rating System
Tyson Living Learning Center

High Performing Buildings - Fall 2010

https://www.nxtbook.com/nxtbooks/ashrae/hpb_2015winter
https://www.nxtbook.com/nxtbooks/ashrae/hpb_2014fall
https://www.nxtbook.com/nxtbooks/ashrae/hpb_2014summer
https://www.nxtbook.com/nxtbooks/ashrae/hpb_2014spring
https://www.nxtbook.com/nxtbooks/ashrae/hpb_2014winter
https://www.nxtbook.com/nxtbooks/ashrae/hpb_2013fall
https://www.nxtbook.com/nxtbooks/ashrae/hpb_2013summer
https://www.nxtbook.com/nxtbooks/ashrae/hpb_2013spring
https://www.nxtbook.com/nxtbooks/ashrae/hpb_2013winter
https://www.nxtbook.com/nxtbooks/ashrae/hpb_2012fall
https://www.nxtbook.com/nxtbooks/ashrae/hpb_2012summer
https://www.nxtbook.com/nxtbooks/ashrae/hpb_2012spring
https://www.nxtbook.com/nxtbooks/ashrae/hpb_2012winter
https://www.nxtbook.com/nxtbooks/ashrae/hpb_2011fall
https://www.nxtbook.com/nxtbooks/ashrae/hpb_2011summer
https://www.nxtbook.com/nxtbooks/ashrae/hpb_2011spring
https://www.nxtbook.com/nxtbooks/ashrae/hpb_2011winter
https://www.nxtbook.com/nxtbooks/ashrae/hpb_2010fall
https://www.nxtbook.com/nxtbooks/ashrae/hpb_2010summer
https://www.nxtbook.com/nxtbooks/ashrae/hpb_2010spring
https://www.nxtbook.com/nxtbooks/ashrae/hpb_2010winter
https://www.nxtbook.com/nxtbooks/ashrae/hpb_2009fallnew
https://www.nxtbook.com/nxtbooks/ashrae/hpb_2009summer
https://www.nxtbook.com/nxtbooks/ashrae/hpb_2009spring
https://www.nxtbook.com/nxtbooks/ashrae/hpb_2009winter
https://www.nxtbook.com/nxtbooks/ashrae/hpb_2008fall
https://www.nxtbook.com/nxtbooks/ashrae/hpb_2008summer
https://www.nxtbook.com/nxtbooks/ashrae/hpb_2008spring
https://www.nxtbook.com/nxtbooks/ashrae/hpb_2008winter
https://www.nxtbookmedia.com