BE Magazine - Volume 4, Issue 4 - (Page 40) PLANT transferred with no human interaction. Aker Kvaerner expects this feature to be a major timesaver. In fact, with 2,000 to 3,000 document transfers a month, the company estimates it will save about 50 hours of labor each month. PROJECT OVERVIEW Plant Wansley Units 1–2 FGD Addition Organization Southern Company-Birmingham Contracts (Data sources) Default information structure for all contracts. BE Awards Category Plant Structural Analysis, Design, and Documentation Project Objective Retrofit two coal-fired boiler units with scrubbers to reduce sulfur oxide emissions from the Plant Wansley steam plant Document creation/import Wizard Document creation/import Wizard (Plants, Oilrigs) Each facility with it’s own CAD configuration Facilities Project Identification Each facility can have multiple M&M projects (Data collected from Engineering register) Technical document- & equipment register (Meta data sent to PW) Engineering register v ProjectWise interface in distributed projects Aker Kvaerner is continually updating its engineering environment with new functionality and additional customer sites. The next phase in the project will add several international sites. “The ProjectWise-based integration has already proved successful in not only managing the complexities of the data integration and workflow, but also in simplifying the administration and support of the systems and data,” concluded Turner. reaction removes sulfur oxides from the flue gas. In this process, gypsum is formed as a by-product. The cleaned flue gas is then sent to the atmosphere through a new stack. Additional components are also required to dewater the gypsum. Fitting scrubbers into an existing plant layout is no small feat. A typical ductwork cross section is 28-feet-wide by 39-feet-tall, elevated 60 feet above grade. In all, the Plant Wansley FGD project requires 2,800 feet of ductwork and 5,400 tons of structural steel to hold the ductwork in place, as well as several tanks and auxiliary equipment including centrifugal booster fans, oxidation air blowers, and pumps. Detail design of the FGD addition began in the fall of 2004. To achieve significant savings through volume procurement of materials, the design schedule was compressed to combine the structural steel and ductwork bid packages with another on-going scrubber project. Modeling large structures BE Award Winner Committed to Cleaner Air Flue gas desulfurization project contributes to a cleaner environment The project team used Bentley products to meet the time constraints and develop a project plan that would keep the coal-fired units running at all times, except for scheduled outages. “The tight integration S ince the early 1990s, Southern Company has made an important effort to retrofit environmental controls at aging power plants, and the energy company is investing considerable resources to lower emissions of sulfur dioxide, nitrogen oxides, and mercury. Retrofitting existing coal-fired units with scrubbers reduces sulfur dioxide emissions significantly, enabling these plants to meet the more stringent regulatory requirements of the Clean Air Act. The Flue Gas Desulfurization (FGD) project at Plant Wansley, located near Carrollton, Georgia, is one such initiative. Plant Wansley has two coal-fired units and two combined-cycle natural gas-fired units. Adding scrubbers to the two coal-fired units requires constructing ductwork to carry flue gas from the existing stacks to a jet bubbling reactor, where limestone slurry is injected and a chemical v Southern Company performed structural analysis of the ductwork and structural steel in a single combined model, then extracted the drawings for fabrication and construction 40 BE MAGAZINE | Volume 4, Issue 4
Table of Contents Feed for the Digital Edition of BE Magazine - Volume 4, Issue 4 BE Magazine - Volume 4, issue 4 Contents The Drive To Innovate News BE Newsletter Highlights Converging on the Market Bytes and Bricks Generative Components Building Courting Success Remodeling an Icon Structural Integration Building News From Bentley Civil Greenfield Airport Takes Flight Good Neighbors Collaborative Innovation Civil News From Bentley Advertisers Index Geospatial Ring of Fiber Revolutionizing Integrity Management Port City Transformation In Conversation With Greg Bentley Geospatial News From Bentley Plant Single-Source Service Committed to Cleaner Air Expediting Expansion Plant News From Bentley Strength in Numbers The Art of Visualization A Winning Legacy Zero Change Culture: Further Definition A Remarkable Collaboration With a Forward-Thinking Community BE Magazine - Volume 4, Issue 4 BE Magazine - Volume 4, Issue 4 - BE Magazine - Volume 4, issue 4 (Page Cover1) BE Magazine - Volume 4, Issue 4 - BE Magazine - Volume 4, issue 4 (Page Cover2) BE Magazine - Volume 4, Issue 4 - Contents (Page 1) BE Magazine - Volume 4, Issue 4 - The Drive To Innovate (Page 2) BE Magazine - Volume 4, Issue 4 - News (Page 3) BE Magazine - Volume 4, Issue 4 - BE Newsletter Highlights (Page 4) BE Magazine - Volume 4, Issue 4 - BE Newsletter Highlights (Page 5) BE Magazine - Volume 4, Issue 4 - Converging on the Market (Page 6) BE Magazine - Volume 4, Issue 4 - Converging on the Market (Page 7) BE Magazine - Volume 4, Issue 4 - Converging on the Market (Page 8) BE Magazine - Volume 4, Issue 4 - Converging on the Market (Page 9) BE Magazine - Volume 4, Issue 4 - Bytes and Bricks (Page 10) BE Magazine - Volume 4, Issue 4 - Bytes and Bricks (Page 11) BE Magazine - Volume 4, Issue 4 - Generative Components (Page 12) BE Magazine - Volume 4, Issue 4 - Generative Components (Page 13) BE Magazine - Volume 4, Issue 4 - Generative Components (Page 14) BE Magazine - Volume 4, Issue 4 - Generative Components (Page 15) BE Magazine - Volume 4, Issue 4 - Generative Components (Page 16) BE Magazine - Volume 4, Issue 4 - Generative Components (Page 17) BE Magazine - Volume 4, Issue 4 - Courting Success (Page 18) BE Magazine - Volume 4, Issue 4 - Courting Success (Page 19) BE Magazine - Volume 4, Issue 4 - Remodeling an Icon (Page 20) BE Magazine - Volume 4, Issue 4 - Remodeling an Icon (Page 21) BE Magazine - Volume 4, Issue 4 - Structural Integration (Page 22) BE Magazine - Volume 4, Issue 4 - Structural Integration (Page 23) BE Magazine - Volume 4, Issue 4 - Building News From Bentley (Page 24) BE Magazine - Volume 4, Issue 4 - Greenfield Airport Takes Flight (Page 25) BE Magazine - Volume 4, Issue 4 - Good Neighbors (Page 26) BE Magazine - Volume 4, Issue 4 - Good Neighbors (Page 27) BE Magazine - Volume 4, Issue 4 - Civil News From Bentley (Page 28) BE Magazine - Volume 4, Issue 4 - Civil News From Bentley (Page 29) BE Magazine - Volume 4, Issue 4 - Advertisers Index (Page 30) BE Magazine - Volume 4, Issue 4 - Ring of Fiber (Page 31) BE Magazine - Volume 4, Issue 4 - Revolutionizing Integrity Management (Page 32) BE Magazine - Volume 4, Issue 4 - Revolutionizing Integrity Management (Page 33) BE Magazine - Volume 4, Issue 4 - Port City Transformation (Page 34) BE Magazine - Volume 4, Issue 4 - Port City Transformation (Page 35) BE Magazine - Volume 4, Issue 4 - In Conversation With Greg Bentley (Page 36) BE Magazine - Volume 4, Issue 4 - In Conversation With Greg Bentley (Page 37) BE Magazine - Volume 4, Issue 4 - Geospatial News From Bentley (Page 38) BE Magazine - Volume 4, Issue 4 - Single-Source Service (Page 39) BE Magazine - Volume 4, Issue 4 - Committed to Cleaner Air (Page 40) BE Magazine - Volume 4, Issue 4 - Expediting Expansion (Page 41) BE Magazine - Volume 4, Issue 4 - Plant News From Bentley (Page 42) BE Magazine - Volume 4, Issue 4 - Strength in Numbers (Page 43) BE Magazine - Volume 4, Issue 4 - The Art of Visualization (Page 44) BE Magazine - Volume 4, Issue 4 - The Art of Visualization (Page 45) BE Magazine - Volume 4, Issue 4 - A Winning Legacy (Page 46) BE Magazine - Volume 4, Issue 4 - Zero Change Culture: Further Definition (Page 47) BE Magazine - Volume 4, Issue 4 - A Remarkable Collaboration With a Forward-Thinking Community (Page 48) BE Magazine - Volume 4, Issue 4 - A Remarkable Collaboration With a Forward-Thinking Community (Page Cover3) BE Magazine - Volume 4, Issue 4 - A Remarkable Collaboration With a Forward-Thinking Community (Page Cover4)
For optimal viewing of this digital publication, please enable JavaScript and then refresh the page. If you would like to try to load the digital publication without using Flash Player detection, please click here.