Assembly Planbook - June 2008 - (Page 24) Assembly in Action compressors for the automotive industry. Recently, the company purchased a number of Miracle Boy high-performance oil filtration systems from Meiji Corp. (Elk Grove Village, IL) in an effort to reduce its expenditures on petroleum products, as well as its environmental “carbon footprint.” Established in 1989, Michigan Automotive Compressor maintains a 786,000-square-foot production facility equipped with some 200 robots and 650 production machines. These systems do everything from machining and pressing to tin plating, arc welding and quality testing. The Miracle Boy fi lters are being used in combination with the company’s die-casting machines and the main ASSEMBLY TECHNOLOGIES Lower Cost Operations Decreased • Energy Usage • Product Damage • Work Hazards Right Angle Nut Runners Up to 40 N•m Michigan Automotive Compressor Inc. has been able to dramatically reduce labor and material costs by implementing a series of oil filtration systems in its production process. Dependable Performance • Consistent Repeatability • High Endurance 2-Piece Motors Up to 12 N•m vacuum pumps serving its inspection stations. Installed in 2004, the filtration systems have succeeded in reducing oil usage in these areas by approximately 92 percent. Greenhouse gas emissions are down from 26.4 tons to almost zero. According to Michigan Automotive production engineer Lee Kline, the company was able to recover 85 percent of the cost of the filters within the first year, thanks to the savings it experienced in terms of materials and labor. For more on oil filtration technology, visit www.mboilfilters.com or call 847-364-9333. Advanced Technologies • Battery Management Systems • Variable Torque Impacts Pistol Grip Screwdrivers Robots Assemble Flashlights Faster, Better S Up to 200 N•m User Friendly • LED Lamps • Easily Serviced • Ergonomic Design Cordless Solutions for Manufacturing Makita USA, Inc. 14930 Northam St., La Mirada, CA 90638 Impact Tools (800) 4-MAKITA makitaassemblytools.com urefire LLC (Fountain Valley, CA) manufactures professional-grade, high-intensity flashlights used by people like hikers and police officers. Although it has long employed both automated and semiautomated processes on its assembly lines, the company recently began replacing its hard automation equipment with articulated robots to further streamline its manufacturing operations. Among other things, company engineers wanted to reduce labor costs, while at the same time improving quality and reducing scrap rates and rework. The company also wanted to 24 ASSEMBLY / June 2008 www.assemblymag.com http://makitaassemblytools.com http://www.mboilfilters.com http://makitaassemblytools.com http://www.assemblymag.com
Table of Contents Feed for the Digital Edition of Assembly Planbook - June 2008 Assembly Planbook - June 2008 Contents Editorial Bonding Lines Quality in Assembly Assembly Lines Assembly in Action Fastening or Bonding? Loose Lips Sink Assembly Systems DFMA Cuts Downstream Costs Robots Lend a Hand Products Advertisers Index Classified Leading Lean Assembly Planbook - June 2008 Assembly Planbook - June 2008 - Assembly Planbook - June 2008 (Page Cover1) Assembly Planbook - June 2008 - Assembly Planbook - June 2008 (Page Cover2) Assembly Planbook - June 2008 - Assembly Planbook - June 2008 (Page 1) Assembly Planbook - June 2008 - Contents (Page 2) Assembly Planbook - June 2008 - Contents (Page 3) Assembly Planbook - June 2008 - Contents (Page 4) Assembly Planbook - June 2008 - Contents (Page 5) Assembly Planbook - June 2008 - Editorial (Page 6) Assembly Planbook - June 2008 - Editorial (Page 7) Assembly Planbook - June 2008 - Bonding Lines (Page 8) Assembly Planbook - June 2008 - Bonding Lines (Page 9) Assembly Planbook - June 2008 - Quality in Assembly (Page 10) Assembly Planbook - June 2008 - Quality in Assembly (Page 11) Assembly Planbook - June 2008 - Assembly Lines (Page 12) Assembly Planbook - June 2008 - Assembly Lines (Page 13) Assembly Planbook - June 2008 - Assembly Lines (Page 14) Assembly Planbook - June 2008 - Assembly Lines (Page 15) Assembly Planbook - June 2008 - Assembly Lines (Page 16) Assembly Planbook - June 2008 - Assembly Lines (Page 17) Assembly Planbook - June 2008 - Assembly Lines (Page 18) Assembly Planbook - June 2008 - Assembly Lines (Page 19) Assembly Planbook - June 2008 - Assembly in Action (Page 20) Assembly Planbook - June 2008 - Assembly in Action (Page 21) Assembly Planbook - June 2008 - Assembly in Action (Page 22) Assembly Planbook - June 2008 - Assembly in Action (Page 23) Assembly Planbook - June 2008 - Assembly in Action (Page 24) Assembly Planbook - June 2008 - Assembly in Action (Page 25) Assembly Planbook - June 2008 - Assembly in Action (Page 26) Assembly Planbook - June 2008 - Assembly in Action (Page 27) Assembly Planbook - June 2008 - Fastening or Bonding? (Page 28) Assembly Planbook - June 2008 - Fastening or Bonding? (Page 29) Assembly Planbook - June 2008 - Fastening or Bonding? (Page 30) Assembly Planbook - June 2008 - Fastening or Bonding? (Page 31) Assembly Planbook - June 2008 - Fastening or Bonding? (Page 32) Assembly Planbook - June 2008 - Fastening or Bonding? (Page 33) Assembly Planbook - June 2008 - Fastening or Bonding? (Page 34) Assembly Planbook - June 2008 - Fastening or Bonding? (Page 35) Assembly Planbook - June 2008 - Fastening or Bonding? (Page 36) Assembly Planbook - June 2008 - Fastening or Bonding? (Page 37) Assembly Planbook - June 2008 - Fastening or Bonding? (Page 38) Assembly Planbook - June 2008 - Fastening or Bonding? (Page 39) Assembly Planbook - June 2008 - Loose Lips Sink Assembly Systems (Page 40) Assembly Planbook - June 2008 - Loose Lips Sink Assembly Systems (Page 41) Assembly Planbook - June 2008 - Loose Lips Sink Assembly Systems (Page 42) Assembly Planbook - June 2008 - Loose Lips Sink Assembly Systems (Page 43) Assembly Planbook - June 2008 - Loose Lips Sink Assembly Systems (Page 44) Assembly Planbook - June 2008 - Loose Lips Sink Assembly Systems (Page 45) Assembly Planbook - June 2008 - DFMA Cuts Downstream Costs (Page 46) Assembly Planbook - June 2008 - DFMA Cuts Downstream Costs (Page 47) Assembly Planbook - June 2008 - DFMA Cuts Downstream Costs (Page 48) Assembly Planbook - June 2008 - DFMA Cuts Downstream Costs (Page 49) Assembly Planbook - June 2008 - Robots Lend a Hand (Page 50) Assembly Planbook - June 2008 - Robots Lend a Hand (Page 51) Assembly Planbook - June 2008 - Robots Lend a Hand (Page 52) Assembly Planbook - June 2008 - Robots Lend a Hand (Page 53) Assembly Planbook - June 2008 - Products (Page 54) Assembly Planbook - June 2008 - Products (Page 55) Assembly Planbook - June 2008 - Products (Page 56) Assembly Planbook - June 2008 - Products (Page 57) Assembly Planbook - June 2008 - Products (Page 58) Assembly Planbook - June 2008 - Products (Page 59) Assembly Planbook - June 2008 - Products (Page 60) Assembly Planbook - June 2008 - Products (Page 61) Assembly Planbook - June 2008 - Products (Page 62) Assembly Planbook - June 2008 - Products (Page 63) Assembly Planbook - June 2008 - Products (Page 64) Assembly Planbook - June 2008 - Products (Page 65) Assembly Planbook - June 2008 - Products (Page 66) Assembly Planbook - June 2008 - Products (Page 67) Assembly Planbook - June 2008 - Products (Page 68) Assembly Planbook - June 2008 - Products (Page 69) Assembly Planbook - June 2008 - Advertisers Index (Page 70) Assembly Planbook - June 2008 - Classified (Page 71) Assembly Planbook - June 2008 - Leading Lean (Page 72) Assembly Planbook - June 2008 - Leading Lean (Page Cover3) Assembly Planbook - June 2008 - Leading Lean (Page Cover4)
For optimal viewing of this digital publication, please enable JavaScript and then refresh the page. If you would like to try to load the digital publication without using Flash Player detection, please click here.