Assembly Planbook - June 2008 - (Page 25) engraving operations requiring approximately 24 seconds, compared to 48 seconds in the past. In the second cell, another six-axis articulated robot, equipped with a three-function gripper, assembles flashlight tail-cap units. Each tail cap assembly consists of a tail cap, a retainer ring, a spring holder, a spring and drive stud. To begin the assembly sequence, the robot picks up a drive stud from a dispenser and places it into a spring holder. The robot then picks up a tail cap and presents it to an adhesive dispenser, which places adhesive onto the interior threads of the cap. Next, the robot inserts a retainer ring into the cap and positions the cap under a screwdriving machine, which The Perfect Press . . . We’ll Help You Make The Right Choice. By replacing its hard-automation systems with robotics, Surefire LLC is able to build flashlights better and faster than in the past. improve flexibility and the rate of return on investment on its automated equipment. With this in mind, Surefire now has two robots from DENSO Robotics (Long Beach, CA) in operation with three more robots on order. In the first of its two existing workcells, a VS Series six-axis articulated robot picks up flashlight parts from a conveyor and then presents them to a laser, which engraves them with serial numbers and other information. After engraving, the robot places the parts onto an outgoing conveyor. This system replaces a fixtured indexing table that required an operator to load and unload the parts, sometimes more than once in the event multiple sides needed to be engraved. Thanks to its articulated “wrist,” the robot can turn the parts as many times as necessary to complete the required engraving. With less manual part handling and a more constant output flow, one operator can now run multiple machines. Cycle times are also faster, with the For flexibility and economical assembly, our Manual Presses satisfy your needs for precision and high output. Precision Air Presses deliver high productivity, power and repeatability. More economical than a ServoPress, our 300 Series Air Presses use integrated sensors to provide 100% process monitoring and control. Revolutionary ManualPress Systems combine the benefits of a manual press with 100% QC and electronic stroke control. For critical applications, our fully integrated ServoPress Systems offer absolute control and real time feedback. Let our engineers work with you to find the right press for your assembly operation. Contact us today. Call 1-800-959-1218 Visit: www.schmidtpresses.com Pressing on with Precision! www.assemblymag.com June 2008 / ASSE M B LY 25 http://www.schmidtpresses.com http://www.schmidtpresses.com http://www.assemblymag.com
Table of Contents Feed for the Digital Edition of Assembly Planbook - June 2008 Assembly Planbook - June 2008 Contents Editorial Bonding Lines Quality in Assembly Assembly Lines Assembly in Action Fastening or Bonding? Loose Lips Sink Assembly Systems DFMA Cuts Downstream Costs Robots Lend a Hand Products Advertisers Index Classified Leading Lean Assembly Planbook - June 2008 Assembly Planbook - June 2008 - Assembly Planbook - June 2008 (Page Cover1) Assembly Planbook - June 2008 - Assembly Planbook - June 2008 (Page Cover2) Assembly Planbook - June 2008 - Assembly Planbook - June 2008 (Page 1) Assembly Planbook - June 2008 - Contents (Page 2) Assembly Planbook - June 2008 - Contents (Page 3) Assembly Planbook - June 2008 - Contents (Page 4) Assembly Planbook - June 2008 - Contents (Page 5) Assembly Planbook - June 2008 - Editorial (Page 6) Assembly Planbook - June 2008 - Editorial (Page 7) Assembly Planbook - June 2008 - Bonding Lines (Page 8) Assembly Planbook - June 2008 - Bonding Lines (Page 9) Assembly Planbook - June 2008 - Quality in Assembly (Page 10) Assembly Planbook - June 2008 - Quality in Assembly (Page 11) Assembly Planbook - June 2008 - Assembly Lines (Page 12) Assembly Planbook - June 2008 - Assembly Lines (Page 13) Assembly Planbook - June 2008 - Assembly Lines (Page 14) Assembly Planbook - June 2008 - Assembly Lines (Page 15) Assembly Planbook - June 2008 - Assembly Lines (Page 16) Assembly Planbook - June 2008 - Assembly Lines (Page 17) Assembly Planbook - June 2008 - Assembly Lines (Page 18) Assembly Planbook - June 2008 - Assembly Lines (Page 19) Assembly Planbook - June 2008 - Assembly in Action (Page 20) Assembly Planbook - June 2008 - Assembly in Action (Page 21) Assembly Planbook - June 2008 - Assembly in Action (Page 22) Assembly Planbook - June 2008 - Assembly in Action (Page 23) Assembly Planbook - June 2008 - Assembly in Action (Page 24) Assembly Planbook - June 2008 - Assembly in Action (Page 25) Assembly Planbook - June 2008 - Assembly in Action (Page 26) Assembly Planbook - June 2008 - Assembly in Action (Page 27) Assembly Planbook - June 2008 - Fastening or Bonding? (Page 28) Assembly Planbook - June 2008 - Fastening or Bonding? (Page 29) Assembly Planbook - June 2008 - Fastening or Bonding? (Page 30) Assembly Planbook - June 2008 - Fastening or Bonding? (Page 31) Assembly Planbook - June 2008 - Fastening or Bonding? (Page 32) Assembly Planbook - June 2008 - Fastening or Bonding? (Page 33) Assembly Planbook - June 2008 - Fastening or Bonding? (Page 34) Assembly Planbook - June 2008 - Fastening or Bonding? (Page 35) Assembly Planbook - June 2008 - Fastening or Bonding? (Page 36) Assembly Planbook - June 2008 - Fastening or Bonding? (Page 37) Assembly Planbook - June 2008 - Fastening or Bonding? (Page 38) Assembly Planbook - June 2008 - Fastening or Bonding? (Page 39) Assembly Planbook - June 2008 - Loose Lips Sink Assembly Systems (Page 40) Assembly Planbook - June 2008 - Loose Lips Sink Assembly Systems (Page 41) Assembly Planbook - June 2008 - Loose Lips Sink Assembly Systems (Page 42) Assembly Planbook - June 2008 - Loose Lips Sink Assembly Systems (Page 43) Assembly Planbook - June 2008 - Loose Lips Sink Assembly Systems (Page 44) Assembly Planbook - June 2008 - Loose Lips Sink Assembly Systems (Page 45) Assembly Planbook - June 2008 - DFMA Cuts Downstream Costs (Page 46) Assembly Planbook - June 2008 - DFMA Cuts Downstream Costs (Page 47) Assembly Planbook - June 2008 - DFMA Cuts Downstream Costs (Page 48) Assembly Planbook - June 2008 - DFMA Cuts Downstream Costs (Page 49) Assembly Planbook - June 2008 - Robots Lend a Hand (Page 50) Assembly Planbook - June 2008 - Robots Lend a Hand (Page 51) Assembly Planbook - June 2008 - Robots Lend a Hand (Page 52) Assembly Planbook - June 2008 - Robots Lend a Hand (Page 53) Assembly Planbook - June 2008 - Products (Page 54) Assembly Planbook - June 2008 - Products (Page 55) Assembly Planbook - June 2008 - Products (Page 56) Assembly Planbook - June 2008 - Products (Page 57) Assembly Planbook - June 2008 - Products (Page 58) Assembly Planbook - June 2008 - Products (Page 59) Assembly Planbook - June 2008 - Products (Page 60) Assembly Planbook - June 2008 - Products (Page 61) Assembly Planbook - June 2008 - Products (Page 62) Assembly Planbook - June 2008 - Products (Page 63) Assembly Planbook - June 2008 - Products (Page 64) Assembly Planbook - June 2008 - Products (Page 65) Assembly Planbook - June 2008 - Products (Page 66) Assembly Planbook - June 2008 - Products (Page 67) Assembly Planbook - June 2008 - Products (Page 68) Assembly Planbook - June 2008 - Products (Page 69) Assembly Planbook - June 2008 - Advertisers Index (Page 70) Assembly Planbook - June 2008 - Classified (Page 71) Assembly Planbook - June 2008 - Leading Lean (Page 72) Assembly Planbook - June 2008 - Leading Lean (Page Cover3) Assembly Planbook - June 2008 - Leading Lean (Page Cover4)
For optimal viewing of this digital publication, please enable JavaScript and then refresh the page. If you would like to try to load the digital publication without using Flash Player detection, please click here.