Assembly Planbook - July 2008 - (Page 23) system includes a reverse-osmosis feature to eliminate minerals from the water and a UV filter to kill bacteria. Humidity sensors in each zone monitor RH levels and report to a remote PLC. If RH in a zone drops below Itron’s 40 percent set point, the PLC activates the Princess 2 units in that zone until RH returns to the desired level. According to Anderson, the company has had very few mechanical problems with the ML system, and it has lived up to all of the company’s expectations. “[The system] is virtually automatic. We rarely think about dry air and static electricity. They really aren’t issues anymore,” he says. For more on humidification, visit www.hussoninc.com or call 262-884-4669. By installing a high-pressure humidification system, Itron Inc. was able to eliminate its humidity problems and also save money. ® temperature falls to 10 F, heating the plant to the necessary 70 F results in a relative humidity (RH) of as little as 10 percent. The ideal relative humidity for the plant’s operations is 40 percent to 50 percent. Below 30 percent, production can become seriously impaired. “Static electricity, and the potential for defects due to electrostatic discharge (ESD), is one of the biggest manufacturing headaches a board manufacturer can face,” says plant facilities operations manager Paul Anderson. “For years, we operated a compressed-air humidification system throughout the plant. It did a good job, but as humidification technology has moved forward, so has the capability to control RH levels.” Ultimately, Itron elected to go with a number of ML System Princess 2 high-pressure humidification systems from Husson Inc. (Sturtevant, WI). Each Princess 2 has a 10 gph capacity and produces a fine mist that is quickly absorbed into the air. In addition to providing consistent humidification, the units cost about $300 per year to operate and are plumbed via a series of high-pressure hydraulic hoses—as opposed to steel pipe—making it easy to shift the units throughout the plant. In terms of the specific layout, Itron deployed eight humidification units in two separate zones comprising its warehouse and production areas. The ARE YOU STUCK ON THE WRONG The performance of our intelligent joining technology greatly exceeds alternative methods. COST-EFFECTIVE – because additional, expensive joining components can be eliminated. ECONOMICAL – because assembly, quality assurance and evaluation takes place in one operation. HIGH PRECISION – because of intelligent process control that directly produces high quality. The future is joining. Think about your process and let us convince you. www.schmidtpresses.com Telephone 1-800-959-1218 or 1-724-772-4600 SCHMIDT Technology Corp. • 280 Executive Drive Cranberry Twp., PA 16066 U.S.A. TECHNOLOGY? www.assemblymag.com July 2008 / ASSE M B LY 23 http://www.hussoninc.com http://www.schmidtpresses.com http://www.schmidtpresses.com http://www.assemblymag.com
Table of Contents Feed for the Digital Edition of Assembly Planbook - July 2008 Assembly Planbook - July 2008 Contents Editorial Quality in Assembly Station to Station Assembly Lines Assembly in Action Surviving the Roller Coaster The Human Side of Manufacturing Do Your Fasteners Need a Preapplied Thread-Locker? Manufacturing Innovation A Century of Progress Trendsetting Plants Pulse Tools Get Smart Plastics: Design for X Product Reviews Products Advertisers Index Classified Leading Lean Assembly Planbook - July 2008 Assembly Planbook - July 2008 - Assembly Planbook - July 2008 (Page Cover1) Assembly Planbook - July 2008 - Assembly Planbook - July 2008 (Page Cover2) Assembly Planbook - July 2008 - Assembly Planbook - July 2008 (Page 1) Assembly Planbook - July 2008 - Contents (Page 2) Assembly Planbook - July 2008 - Contents (Page 3) Assembly Planbook - July 2008 - Contents (Page 4) Assembly Planbook - July 2008 - Contents (Page 5) Assembly Planbook - July 2008 - Editorial (Page 6) Assembly Planbook - July 2008 - Editorial (Page 7) Assembly Planbook - July 2008 - Quality in Assembly (Page 8) Assembly Planbook - July 2008 - Quality in Assembly (Page 9) Assembly Planbook - July 2008 - Station to Station (Page 10) Assembly Planbook - July 2008 - Station to Station (Page 11) Assembly Planbook - July 2008 - Assembly Lines (Page 12) Assembly Planbook - July 2008 - Assembly Lines (Page 13) Assembly Planbook - July 2008 - Assembly Lines (Page 14) Assembly Planbook - July 2008 - Assembly Lines (Page 15) Assembly Planbook - July 2008 - Assembly Lines (Page 16) Assembly Planbook - July 2008 - Assembly Lines (Page 17) Assembly Planbook - July 2008 - Assembly in Action (Page 18) Assembly Planbook - July 2008 - Assembly in Action (Page 19) Assembly Planbook - July 2008 - Assembly in Action (Page 20) Assembly Planbook - July 2008 - Assembly in Action (Page 21) Assembly Planbook - July 2008 - Assembly in Action (Page 22) Assembly Planbook - July 2008 - Assembly in Action (Page 23) Assembly Planbook - July 2008 - Surviving the Roller Coaster (Page 24) Assembly Planbook - July 2008 - Surviving the Roller Coaster (Page 25) Assembly Planbook - July 2008 - Surviving the Roller Coaster (Page 26) Assembly Planbook - July 2008 - Surviving the Roller Coaster (Page 27) Assembly Planbook - July 2008 - Surviving the Roller Coaster (Page 28) Assembly Planbook - July 2008 - Surviving the Roller Coaster (Page 29) Assembly Planbook - July 2008 - Surviving the Roller Coaster (Page 30) Assembly Planbook - July 2008 - Surviving the Roller Coaster (Page 31) Assembly Planbook - July 2008 - Surviving the Roller Coaster (Page 32) Assembly Planbook - July 2008 - Surviving the Roller Coaster (Page 33) Assembly Planbook - July 2008 - Surviving the Roller Coaster (Page 34) Assembly Planbook - July 2008 - Surviving the Roller Coaster (Page 35) Assembly Planbook - July 2008 - Surviving the Roller Coaster (Page 36) Assembly Planbook - July 2008 - Surviving the Roller Coaster (Page 37) Assembly Planbook - July 2008 - Surviving the Roller Coaster (Page 38) Assembly Planbook - July 2008 - Surviving the Roller Coaster (Page 39) Assembly Planbook - July 2008 - The Human Side of Manufacturing (Page 40) Assembly Planbook - July 2008 - The Human Side of Manufacturing (Page 41) Assembly Planbook - July 2008 - The Human Side of Manufacturing (Page 42) Assembly Planbook - July 2008 - The Human Side of Manufacturing (Page 43) Assembly Planbook - July 2008 - Do Your Fasteners Need a Preapplied Thread-Locker? (Page 44) Assembly Planbook - July 2008 - Do Your Fasteners Need a Preapplied Thread-Locker? (Page 45) Assembly Planbook - July 2008 - Do Your Fasteners Need a Preapplied Thread-Locker? (Page 46) Assembly Planbook - July 2008 - Do Your Fasteners Need a Preapplied Thread-Locker? (Page 47) Assembly Planbook - July 2008 - Do Your Fasteners Need a Preapplied Thread-Locker? (Page 48) Assembly Planbook - July 2008 - Do Your Fasteners Need a Preapplied Thread-Locker? (Page GM-1) Assembly Planbook - July 2008 - Do Your Fasteners Need a Preapplied Thread-Locker? (Page GM-2) Assembly Planbook - July 2008 - Do Your Fasteners Need a Preapplied Thread-Locker? (Page GM-3) Assembly Planbook - July 2008 - Manufacturing Innovation (Page GM-4) Assembly Planbook - July 2008 - Manufacturing Innovation (Page GM-5) Assembly Planbook - July 2008 - Manufacturing Innovation (Page GM-6) Assembly Planbook - July 2008 - Manufacturing Innovation (Page GM-7) Assembly Planbook - July 2008 - Manufacturing Innovation (Page GM-8) Assembly Planbook - July 2008 - Manufacturing Innovation (Page GM-9) Assembly Planbook - July 2008 - Manufacturing Innovation (Page GM-10) Assembly Planbook - July 2008 - Manufacturing Innovation (Page GM-11) Assembly Planbook - July 2008 - Manufacturing Innovation (Page GM-12) Assembly Planbook - July 2008 - Manufacturing Innovation (Page GM-13) Assembly Planbook - July 2008 - A Century of Progress (Page GM-14) Assembly Planbook - July 2008 - A Century of Progress (Page GM-15) Assembly Planbook - July 2008 - A Century of Progress (Page GM-16) Assembly Planbook - July 2008 - A Century of Progress (Page GM-17) Assembly Planbook - July 2008 - Trendsetting Plants (Page GM-18) Assembly Planbook - July 2008 - Trendsetting Plants (Page GM-19) Assembly Planbook - July 2008 - Trendsetting Plants (Page GM-20) Assembly Planbook - July 2008 - Trendsetting Plants (Page GM-21) Assembly Planbook - July 2008 - Trendsetting Plants (Page GM-22) Assembly Planbook - July 2008 - Trendsetting Plants (Page GM-23) Assembly Planbook - July 2008 - Trendsetting Plants (Page 72) Assembly Planbook - July 2008 - Trendsetting Plants (Page 73) Assembly Planbook - July 2008 - Pulse Tools Get Smart (Page 74) Assembly Planbook - July 2008 - Pulse Tools Get Smart (Page 75) Assembly Planbook - July 2008 - Pulse Tools Get Smart (Page 76) Assembly Planbook - July 2008 - Pulse Tools Get Smart (Page 77) Assembly Planbook - July 2008 - Pulse Tools Get Smart (Page 78) Assembly Planbook - July 2008 - Pulse Tools Get Smart (Page 79) Assembly Planbook - July 2008 - Plastics: Design for X (Page 80) Assembly Planbook - July 2008 - Plastics: Design for X (Page 81) Assembly Planbook - July 2008 - Plastics: Design for X (Page 82) Assembly Planbook - July 2008 - Plastics: Design for X (Page 83) Assembly Planbook - July 2008 - Plastics: Design for X (Page 84) Assembly Planbook - July 2008 - Plastics: Design for X (Page 85) Assembly Planbook - July 2008 - Product Reviews (Page 86) Assembly Planbook - July 2008 - Product Reviews (Page 87) Assembly Planbook - July 2008 - Product Reviews (Page 88) Assembly Planbook - July 2008 - Product Reviews (Page 89) Assembly Planbook - July 2008 - Product Reviews (Page 90) Assembly Planbook - July 2008 - Product Reviews (Page 91) Assembly Planbook - July 2008 - Product Reviews (Page 92) Assembly Planbook - July 2008 - Product Reviews (Page 93) Assembly Planbook - July 2008 - Products (Page 94) Assembly Planbook - July 2008 - Products (Page 95) Assembly Planbook - July 2008 - Products (Page 96) Assembly Planbook - July 2008 - Products (Page 97) Assembly Planbook - July 2008 - Products (Page 98) Assembly Planbook - July 2008 - Products (Page 99) Assembly Planbook - July 2008 - Products (Page 100) Assembly Planbook - July 2008 - Products (Page 101) Assembly Planbook - July 2008 - Advertisers Index (Page 102) Assembly Planbook - July 2008 - Classified (Page 103) Assembly Planbook - July 2008 - Leading Lean (Page 104) Assembly Planbook - July 2008 - Leading Lean (Page Cover3) Assembly Planbook - July 2008 - Leading Lean (Page Cover4)
For optimal viewing of this digital publication, please enable JavaScript and then refresh the page. If you would like to try to load the digital publication without using Flash Player detection, please click here.