Assembly Planbook - July 2008 - (Page GM-21) were needed. The old Fremont facility relied on parts that were shipped by rail from GM stamping plants in the Midwest. The joint venture eventually proved to be a success. The first NUMMI automobile, a Chevy Nova, rolled off the line in December 1984. Assemblers began building the Toyota Corolla in September 1986. Within 5 years, NUMMI operated as efficiently as Toyota’s Japanese plants. A few years after NUMMI production began, GM teamed up with Suzuki Motor Corp. (Hamamatsu, Japan) to build small cars and sport utility vehicles. The CAMI Automotive Inc. (Ingersoll, ON) assembly line opened in 1989. The NUMMI plant pioneered justin-time inventory and parts replenishment, assembly line quality control through kaizen, an emphasis on teamwork that required multiple skills, and close cooperation between operators and management. Today, it continues to assemble Corolla sedans, in addition to the Pontiac Vibe crossover and the Toyota Tacoma pickup truck. Spring Hill A “new kind of assembly plant” cropped up in a field 30 miles south of Nashville, TN, in the mid-1980s. Production of Saturn sedans began at Spring Hill in July 1990. During the 1980s, GM spent 8 years and $3 billion dollars developing a new brand and a different way of building small cars to compete against Japanese automakers. The goal was to use startto-finish innovation, such as plastic body panels, to produce a sporty family of subcompact sedans. According to GM chairman Roger Smith, Saturn would be “the key to GM’s long-term competitiveness, survival and success as a domestic producer. We expect it to be a learning laboratory. We also expect that what we learn with Saturn will spread throughout GM.” The Spring Hill plant served as an incubator for several cutting-edge ideas. One of the most radical new concepts was the role of labor and management. As a result, the plant boasted of having the lowest absentee rate in the auto industry. “Saturn represents a profound change in the relationship between the union and management, and an equally profound change in the way Because the Spring Hill plant was so flexible, assemblers built both standard and high-performance engines on the same line. Congratulations G E N E RA L M OTO R S 1 0 0 Year Anniversary on Your STA N DA R D CO R ROS I O N P ROT EC T I O N …on the majority of ACE's industrial shock absorber and feed controller threaded outer tubes. EXTREME RUST BUILD-UP Outer tube without Weartec Plus! Decelerate Loads / Prevent Impact Damage Improve Product Performance Increase Cycle Speeds / Reduce Noise Farmington Hills, MI 48335 tel: 800-521-3320 fax: 248-476-2470 e-mail: shocks@acecontrols.com acecontrols.com www.assemblymag.com ASBGM07084Ace.indd 1 6/5/08 3:48:28 PM ASB09074RStech.indd 1 | July 2008/ASSEMBLY | GM - 21 8/3/07 11:31:28 AM http://www.rstechltd.com http://www.rstechltd.com http://acecontrols.com http://acecontrols.com http://www.assemblymag.com
Table of Contents Feed for the Digital Edition of Assembly Planbook - July 2008 Assembly Planbook - July 2008 Contents Editorial Quality in Assembly Station to Station Assembly Lines Assembly in Action Surviving the Roller Coaster The Human Side of Manufacturing Do Your Fasteners Need a Preapplied Thread-Locker? Manufacturing Innovation A Century of Progress Trendsetting Plants Pulse Tools Get Smart Plastics: Design for X Product Reviews Products Advertisers Index Classified Leading Lean Assembly Planbook - July 2008 Assembly Planbook - July 2008 - Assembly Planbook - July 2008 (Page Cover1) Assembly Planbook - July 2008 - Assembly Planbook - July 2008 (Page Cover2) Assembly Planbook - July 2008 - Assembly Planbook - July 2008 (Page 1) Assembly Planbook - July 2008 - Contents (Page 2) Assembly Planbook - July 2008 - Contents (Page 3) Assembly Planbook - July 2008 - Contents (Page 4) Assembly Planbook - July 2008 - Contents (Page 5) Assembly Planbook - July 2008 - Editorial (Page 6) Assembly Planbook - July 2008 - Editorial (Page 7) Assembly Planbook - July 2008 - Quality in Assembly (Page 8) Assembly Planbook - July 2008 - Quality in Assembly (Page 9) Assembly Planbook - July 2008 - Station to Station (Page 10) Assembly Planbook - July 2008 - Station to Station (Page 11) Assembly Planbook - July 2008 - Assembly Lines (Page 12) Assembly Planbook - July 2008 - Assembly Lines (Page 13) Assembly Planbook - July 2008 - Assembly Lines (Page 14) Assembly Planbook - July 2008 - Assembly Lines (Page 15) Assembly Planbook - July 2008 - Assembly Lines (Page 16) Assembly Planbook - July 2008 - Assembly Lines (Page 17) Assembly Planbook - July 2008 - Assembly in Action (Page 18) Assembly Planbook - July 2008 - Assembly in Action (Page 19) Assembly Planbook - July 2008 - Assembly in Action (Page 20) Assembly Planbook - July 2008 - Assembly in Action (Page 21) Assembly Planbook - July 2008 - Assembly in Action (Page 22) Assembly Planbook - July 2008 - Assembly in Action (Page 23) Assembly Planbook - July 2008 - Surviving the Roller Coaster (Page 24) Assembly Planbook - July 2008 - Surviving the Roller Coaster (Page 25) Assembly Planbook - July 2008 - Surviving the Roller Coaster (Page 26) Assembly Planbook - July 2008 - Surviving the Roller Coaster (Page 27) Assembly Planbook - July 2008 - Surviving the Roller Coaster (Page 28) Assembly Planbook - July 2008 - Surviving the Roller Coaster (Page 29) Assembly Planbook - July 2008 - Surviving the Roller Coaster (Page 30) Assembly Planbook - July 2008 - Surviving the Roller Coaster (Page 31) Assembly Planbook - July 2008 - Surviving the Roller Coaster (Page 32) Assembly Planbook - July 2008 - Surviving the Roller Coaster (Page 33) Assembly Planbook - July 2008 - Surviving the Roller Coaster (Page 34) Assembly Planbook - July 2008 - Surviving the Roller Coaster (Page 35) Assembly Planbook - July 2008 - Surviving the Roller Coaster (Page 36) Assembly Planbook - July 2008 - Surviving the Roller Coaster (Page 37) Assembly Planbook - July 2008 - Surviving the Roller Coaster (Page 38) Assembly Planbook - July 2008 - Surviving the Roller Coaster (Page 39) Assembly Planbook - July 2008 - The Human Side of Manufacturing (Page 40) Assembly Planbook - July 2008 - The Human Side of Manufacturing (Page 41) Assembly Planbook - July 2008 - The Human Side of Manufacturing (Page 42) Assembly Planbook - July 2008 - The Human Side of Manufacturing (Page 43) Assembly Planbook - July 2008 - Do Your Fasteners Need a Preapplied Thread-Locker? (Page 44) Assembly Planbook - July 2008 - Do Your Fasteners Need a Preapplied Thread-Locker? (Page 45) Assembly Planbook - July 2008 - Do Your Fasteners Need a Preapplied Thread-Locker? (Page 46) Assembly Planbook - July 2008 - Do Your Fasteners Need a Preapplied Thread-Locker? (Page 47) Assembly Planbook - July 2008 - Do Your Fasteners Need a Preapplied Thread-Locker? (Page 48) Assembly Planbook - July 2008 - Do Your Fasteners Need a Preapplied Thread-Locker? (Page GM-1) Assembly Planbook - July 2008 - Do Your Fasteners Need a Preapplied Thread-Locker? (Page GM-2) Assembly Planbook - July 2008 - Do Your Fasteners Need a Preapplied Thread-Locker? (Page GM-3) Assembly Planbook - July 2008 - Manufacturing Innovation (Page GM-4) Assembly Planbook - July 2008 - Manufacturing Innovation (Page GM-5) Assembly Planbook - July 2008 - Manufacturing Innovation (Page GM-6) Assembly Planbook - July 2008 - Manufacturing Innovation (Page GM-7) Assembly Planbook - July 2008 - Manufacturing Innovation (Page GM-8) Assembly Planbook - July 2008 - Manufacturing Innovation (Page GM-9) Assembly Planbook - July 2008 - Manufacturing Innovation (Page GM-10) Assembly Planbook - July 2008 - Manufacturing Innovation (Page GM-11) Assembly Planbook - July 2008 - Manufacturing Innovation (Page GM-12) Assembly Planbook - July 2008 - Manufacturing Innovation (Page GM-13) Assembly Planbook - July 2008 - A Century of Progress (Page GM-14) Assembly Planbook - July 2008 - A Century of Progress (Page GM-15) Assembly Planbook - July 2008 - A Century of Progress (Page GM-16) Assembly Planbook - July 2008 - A Century of Progress (Page GM-17) Assembly Planbook - July 2008 - Trendsetting Plants (Page GM-18) Assembly Planbook - July 2008 - Trendsetting Plants (Page GM-19) Assembly Planbook - July 2008 - Trendsetting Plants (Page GM-20) Assembly Planbook - July 2008 - Trendsetting Plants (Page GM-21) Assembly Planbook - July 2008 - Trendsetting Plants (Page GM-22) Assembly Planbook - July 2008 - Trendsetting Plants (Page GM-23) Assembly Planbook - July 2008 - Trendsetting Plants (Page 72) Assembly Planbook - July 2008 - Trendsetting Plants (Page 73) Assembly Planbook - July 2008 - Pulse Tools Get Smart (Page 74) Assembly Planbook - July 2008 - Pulse Tools Get Smart (Page 75) Assembly Planbook - July 2008 - Pulse Tools Get Smart (Page 76) Assembly Planbook - July 2008 - Pulse Tools Get Smart (Page 77) Assembly Planbook - July 2008 - Pulse Tools Get Smart (Page 78) Assembly Planbook - July 2008 - Pulse Tools Get Smart (Page 79) Assembly Planbook - July 2008 - Plastics: Design for X (Page 80) Assembly Planbook - July 2008 - Plastics: Design for X (Page 81) Assembly Planbook - July 2008 - Plastics: Design for X (Page 82) Assembly Planbook - July 2008 - Plastics: Design for X (Page 83) Assembly Planbook - July 2008 - Plastics: Design for X (Page 84) Assembly Planbook - July 2008 - Plastics: Design for X (Page 85) Assembly Planbook - July 2008 - Product Reviews (Page 86) Assembly Planbook - July 2008 - Product Reviews (Page 87) Assembly Planbook - July 2008 - Product Reviews (Page 88) Assembly Planbook - July 2008 - Product Reviews (Page 89) Assembly Planbook - July 2008 - Product Reviews (Page 90) Assembly Planbook - July 2008 - Product Reviews (Page 91) Assembly Planbook - July 2008 - Product Reviews (Page 92) Assembly Planbook - July 2008 - Product Reviews (Page 93) Assembly Planbook - July 2008 - Products (Page 94) Assembly Planbook - July 2008 - Products (Page 95) Assembly Planbook - July 2008 - Products (Page 96) Assembly Planbook - July 2008 - Products (Page 97) Assembly Planbook - July 2008 - Products (Page 98) Assembly Planbook - July 2008 - Products (Page 99) Assembly Planbook - July 2008 - Products (Page 100) Assembly Planbook - July 2008 - Products (Page 101) Assembly Planbook - July 2008 - Advertisers Index (Page 102) Assembly Planbook - July 2008 - Classified (Page 103) Assembly Planbook - July 2008 - Leading Lean (Page 104) Assembly Planbook - July 2008 - Leading Lean (Page Cover3) Assembly Planbook - July 2008 - Leading Lean (Page Cover4)
For optimal viewing of this digital publication, please enable JavaScript and then refresh the page. If you would like to try to load the digital publication without using Flash Player detection, please click here.