Assembly - January 2009 - (Page 42) Assembly in Action By switching over to a new lighting system, Waukesha Engine has cut its power usage and dramatically improved the work atmosphere in its manufacturing and research facility. operate, allowing Waukesha Engine to reduce is annual electricity consumption by nearly 3.2 million kilowatthours—the equivalent to the energy contained in 264,163 gallons of gasoline or 6,290 barrels of oil. Total cost of the project was approximately $346,000. Factoring in $112,000 in incentives from the company’s local utility, We Energies, Waukesha Engine was able to recoup the entire cost of the upgrade in about a year. Specializing In: • Premixed and frozen two component • Difficult to package one component resins • Blending and providing modifications per your specifications We Provide: • Air free syringes and cartridges for automated X-Y-Z dispensing systems • Stock syringes and cartridges from all the major manufacturers • Maximum 5 day lead-time from receipt of materials • All materials including any special additives, fillers, or spacer beads • QA testing and certifications of many physical and performance properties with our lab equipment • Full range of other one and two component resin packaging for a exact ratio, quality mix, and precision dispense ISO9001:2000 Authorized Dow Corning Repackager Contact us for quick delivery of samples and quotes toll free N117 W18711 Fulton Drive • Germantown, WI 53022 • 262-253-5900 866-322-8322 42 ASSEMBLY / January 2009 www.assemblymag.com www.kitpackers.com http://www.kitpackers.com http://www.kitpackers.com http://www.assemblymag.com
For optimal viewing of this digital publication, please enable JavaScript and then refresh the page. If you would like to try to load the digital publication without using Flash Player detection, please click here.