Assembly - April 2009 - (Page 10) Automation Profiles that startup, changeover and recovery from abnormal conditions were straightforward. Devising simple, robust controls and programming structures were essential to enable the customer’s technicians—some of whom had no robotics experience—to easily understand and support the equipment. The agile approach enabled the customer to take on nearly a dozen new production programs in the first year of operation with minimal tooling cost and zero additional capital investment. Agile features don’t always pass strict return-on-investment tests. Some manufacturers, particularly those practicing lean techniques, realize that there is a less quantifiable, yet equally tangible, return to be had by investing in flexibility. Responding quickly and economically to major changes in product mix and production volume is essential to the reality of today’s market. The success of this approach is probably best measured by the customer’s order for a second system to meet their growing demand. A This nine-station asynchronous assembly system produces 200 car wheels per hour. minimizing work in process. In addition, modular tooling put few, if any, constraints on the customer’s designers as product designs evolved. Another challenge was the customer’s difficulty in finding and retaining skilled maintenance technicians. That meant the equipment had to perform 24 hours a day with minimal maintenance and no onsite process engineering. We created a rich touch-screen interface so Editor’s note: Whether you’re a systems integrator or the in-house automation team of an OEM, if you’ve designed a system that you’re particularly proud of, tell us about it. Send an e-mail to John Sprovieri, editor of ASSEMBLY, at sprovierij@bnpmedia.com, or call 630-694-4012. For reprints of this article, please contact Cindy Williams at williamsc@bnpmedia.com or 610-436-4220 ext. 8516. ® MEDI-CAM MEDI-CAM ® Move it smoothly…Position it perfectly…Do it Fast!! Reliable performance everyday…24/7! Medi-Cam Precision Link Conveyors have been medical device manufacturer's choice for more than 15 years and are designed for precision, high speed assembly and packaging of pharmaceutical & medical devices. *Complies to “Clean Room” & GAMP standards *Unmatched positional accuracy +/-0.002” *High Speed - 200 per minute index cycle rates MINI PRECISION LINK CONVEYOR Medi-Cam Part Elevators are designed to improve the pre-feed flow of individual component parts presented for assembly and installation on automated machinery. Providing controlled flow for optimal production performance and are ideally suited in feeding parts for pharmaceutical and medical devices. * “Clean Room” & GAMP Compatible. * Allows fast production changeovers. * Ergonomic floor level part loading. Innovative Conical * improved part flow.Hoppers for * All Stainless Steel construction. 125 LITER HOPPER SERVO LINK CONVEYOR 200 LITER HOPPER LINEAR PRECISION TRANSFER CHASSIS PRECISION LINK CONVEYOR CLEAN ROOM COMPATIBLE Call Today! 973-300-0090 ISO 9001:2000 Certified Call Today! 973-300-0090 ISO 9001:2000 Certified 10 ASSEMBLY / April 2009 www.assemblymag.com http://www.cdsindexers.com http://www.cdsindexers.com http://www.cdsindexers.com http://www.cdsindexers.com http://www.assemblymag.com
Table of Contents Feed for the Digital Edition of Assembly - April 2009 Assembly - April 2009 Contents Editorial Automation Profiles New & Noteworthy Assembly Plant of the Year Down the Line Welding Beads Quality in Assembly Assembly Lines Assembly in Action Standard Helps Suppliers Take Flight Plastics Under the Hood Leak Testing Auto Parts Press for Success Products Advertisers Index Classified Leading Lean Assembly - April 2009 Assembly - April 2009 - Assembly - April 2009 (Page Cover1) Assembly - April 2009 - Assembly - April 2009 (Page Cover2) Assembly - April 2009 - Assembly - April 2009 (Page 1) Assembly - April 2009 - Contents (Page 2) Assembly - April 2009 - Contents (Page 3) Assembly - April 2009 - Contents (Page 4) Assembly - April 2009 - Contents (Page 5) Assembly - April 2009 - Editorial (Page 6) Assembly - April 2009 - Editorial (Page 7) Assembly - April 2009 - Automation Profiles (Page 8) Assembly - April 2009 - Automation Profiles (Page 9) Assembly - April 2009 - Automation Profiles (Page 10) Assembly - April 2009 - Automation Profiles (Page 11) Assembly - April 2009 - New & Noteworthy (Page 12) Assembly - April 2009 - New & Noteworthy (Page 13) Assembly - April 2009 - Assembly Plant of the Year (Page 14) Assembly - April 2009 - Assembly Plant of the Year (Page 15) Assembly - April 2009 - Down the Line (Page 16) Assembly - April 2009 - Down the Line (Page 17) Assembly - April 2009 - Down the Line (Page 18) Assembly - April 2009 - Down the Line (Page 19) Assembly - April 2009 - Welding Beads (Page 20) Assembly - April 2009 - Quality in Assembly (Page 21) Assembly - April 2009 - Assembly Lines (Page 22) Assembly - April 2009 - Assembly Lines (Page 23) Assembly - April 2009 - Assembly in Action (Page 24) Assembly - April 2009 - Assembly in Action (Page 25) Assembly - April 2009 - Assembly in Action (Page 26) Assembly - April 2009 - Assembly in Action (Page 27) Assembly - April 2009 - Assembly in Action (Page 28) Assembly - April 2009 - Assembly in Action (Page 29) Assembly - April 2009 - Standard Helps Suppliers Take Flight (Page 30) Assembly - April 2009 - Standard Helps Suppliers Take Flight (Page 31) Assembly - April 2009 - Standard Helps Suppliers Take Flight (Page 32) Assembly - April 2009 - Standard Helps Suppliers Take Flight (Page 33) Assembly - April 2009 - Plastics Under the Hood (Page 34) Assembly - April 2009 - Plastics Under the Hood (Page 35) Assembly - April 2009 - Plastics Under the Hood (Page 36) Assembly - April 2009 - Plastics Under the Hood (Page 37) Assembly - April 2009 - Plastics Under the Hood (Page 38) Assembly - April 2009 - Plastics Under the Hood (Page 39) Assembly - April 2009 - Leak Testing Auto Parts (Page 40) Assembly - April 2009 - Leak Testing Auto Parts (Page 41) Assembly - April 2009 - Leak Testing Auto Parts (Page 42) Assembly - April 2009 - Leak Testing Auto Parts (Page 43) Assembly - April 2009 - Press for Success (Page 44) Assembly - April 2009 - Press for Success (Page 45) Assembly - April 2009 - Press for Success (Page 46) Assembly - April 2009 - Press for Success (Page 47) Assembly - April 2009 - Press for Success (Page 48) Assembly - April 2009 - Products (Page 49) Assembly - April 2009 - Products (Page 50) Assembly - April 2009 - Products (Page 51) Assembly - April 2009 - Products (Page 52) Assembly - April 2009 - Products (Page 53) Assembly - April 2009 - Advertisers Index (Page 54) Assembly - April 2009 - Classified (Page 55) Assembly - April 2009 - Leading Lean (Page 56) Assembly - April 2009 - Leading Lean (Page Cover3) Assembly - April 2009 - Leading Lean (Page Cover4)
For optimal viewing of this digital publication, please enable JavaScript and then refresh the page. If you would like to try to load the digital publication without using Flash Player detection, please click here.