Environmental Design + Construction - December 2008 - (Page 34) Lab Materials & Sources: HVAC / Mechanical Chilled water is generated by three 240-ton McQuay centrifugal chillers and circulated by a constant flow primary / variable flow secondary pumping system. Condenser water is cooled via three Baltimore Aircoil closed-circuit, indirect evaporative cooling towers. While most of the cooled tower water feeds directly into the chiller condensers, some is routed through the building to serve AHU coils and to absorb heat rejected from refrigerators and freezers. Six 2,000 MBtuh condensing boilers from HydroTherm generate heating hot water, which is then distributed via a variable flow, primary only pumping system. Sixteen custom Governair AHUs have been strategically located within internal mechanical rooms — some spanning multiple floors — so as to avoid interrupting the green roof. These units, in conjunction with an array of variable and constant volume air delivery systems, provide ventilation and comfort conditioning to most of the spaces. Arup used its own thermal analysis software (ROOM) to determine exhibit area surface temperatures, which were then used as input to STAR-CD computational fluid dynamics software. As the building design was refined, Arup used EnergyPlus energy simulation software to evaluate thermal and airflow behavior of the exhibit hall at design conditions. The radiant floor is based on an Uponor system built up over a base concrete slab covered by an inch of rigid insulation. Support rails rest on 1 in. strips of insulation and hold 5/8 in. dia hePEX plus tubing. For more information on the mechanical systems, visit www.esmagazine.com. Paul Switenki, P.E., a mechanical engineer with Arup, authored “Looking Radiant In Green” in the August 2008 issue of Engineered Systems. LIVING POLISHED CONCRETE WAS SELECTED BY ARCHITECT RENZO PIANO AS A SUSTAINABLE FLOORING OPTION. PERFECT POLISH ASSEMBLED A 10-MAN POLISHING CREW SCHEDULED IN TWO SHIFTS, SEVEN DAYS A WEEK FOR EIGHT TO 10 WEEKS TO ENSURE THE ALMOST 200,000-SQUARE-FOOT PROJECT WAS COMPLETED ON TIME. PHOTO COURTESY OF PERFECT POLISH. Reader Service No. 177 www.EDCmag.com/webcard 34 ed+c D E C E MBE R 08 EDC11084Dunh.indd 1 10/20/08 3:21:47 PM http://www.esmagazine.com http://www.dunhameng.com http://www.dunhameng.com http://www.EDCmag.com/webcard
Table of Contents Feed for the Digital Edition of Environmental Design + Construction - December 2008 Environmental Design %2B Construction - December 2008 Contents Web TOC Editor's Note Newsline Living Lab Sustainable Perspectives Resources Products Trade Names Suppliers 2008 Top Products Shedding Light on Energy Advertiser's Index Marketplace %2B Classifieds Parting Shot Environmental Design + Construction - December 2008 Environmental Design + Construction - December 2008 - Environmental Design %2B Construction - December 2008 (Page Cover1) Environmental Design + Construction - December 2008 - Environmental Design %2B Construction - December 2008 (Page Cover2) Environmental Design + Construction - December 2008 - Environmental Design %2B Construction - December 2008 (Page 3) Environmental Design + Construction - December 2008 - Environmental Design %2B Construction - December 2008 (Page 4) Environmental Design + Construction - December 2008 - Environmental Design %2B Construction - December 2008 (Page 5) Environmental Design + Construction - December 2008 - Environmental Design %2B Construction - December 2008 (Page 6) Environmental Design + Construction - December 2008 - Environmental Design %2B Construction - December 2008 (Page 7) Environmental Design + Construction - December 2008 - Contents (Page 8) Environmental Design + Construction - December 2008 - Contents (Page 9) Environmental Design + Construction - December 2008 - Web TOC (Page 10) Environmental Design + Construction - December 2008 - Web TOC (Page 11) Environmental Design + Construction - December 2008 - Editor's Note (Page 12) Environmental Design + Construction - December 2008 - Editor's Note (Page 13) Environmental Design + Construction - December 2008 - Editor's Note (Page 14) Environmental Design + Construction - December 2008 - Editor's Note (Page 15) Environmental Design + Construction - December 2008 - Editor's Note (Page 16) Environmental Design + Construction - December 2008 - Editor's Note (Page 17) Environmental Design + Construction - December 2008 - Editor's Note (Page 18) Environmental Design + Construction - December 2008 - Editor's Note (Page 19) Environmental Design + Construction - December 2008 - Newsline (Page 20) Environmental Design + Construction - December 2008 - Newsline (Page 21) Environmental Design + Construction - December 2008 - Newsline (Page 22) Environmental Design + Construction - December 2008 - Newsline (Page 23) Environmental Design + Construction - December 2008 - Newsline (Page 24) Environmental Design + Construction - December 2008 - Newsline (Page 25) Environmental Design + Construction - December 2008 - Newsline (Page 26) Environmental Design + Construction - December 2008 - Newsline (Page 27) Environmental Design + Construction - December 2008 - Newsline (Page 28) Environmental Design + Construction - December 2008 - Newsline (Page 29) Environmental Design + Construction - December 2008 - Living Lab (Page 30) Environmental Design + Construction - December 2008 - Living Lab (Page 31) Environmental Design + Construction - December 2008 - Living Lab (Page 32) Environmental Design + Construction - December 2008 - Living Lab (Page 33) Environmental Design + Construction - December 2008 - Living Lab (Page 34) Environmental Design + Construction - December 2008 - Living Lab (Page 35) Environmental Design + Construction - December 2008 - Living Lab (Page 36) Environmental Design + Construction - December 2008 - Living Lab (Page 37) Environmental Design + Construction - December 2008 - Living Lab (Page 38) Environmental Design + Construction - December 2008 - Living Lab (Page 39) Environmental Design + Construction - December 2008 - Living Lab (Page 40) Environmental Design + Construction - December 2008 - Living Lab (Page 41) Environmental Design + Construction - December 2008 - Sustainable Perspectives (Page 42) Environmental Design + Construction - December 2008 - Sustainable Perspectives (Page 43) Environmental Design + Construction - December 2008 - Sustainable Perspectives (Page 44) Environmental Design + Construction - December 2008 - Sustainable Perspectives (Page 45) Environmental Design + Construction - December 2008 - Sustainable Perspectives (Page 46) Environmental Design + Construction - December 2008 - Sustainable Perspectives (Page 47) Environmental Design + Construction - December 2008 - Sustainable Perspectives (Page 48) Environmental Design + Construction - December 2008 - Sustainable Perspectives (Page 49) Environmental Design + Construction - December 2008 - Sustainable Perspectives (Page 50) Environmental Design + Construction - December 2008 - Sustainable Perspectives (Page 50a) Environmental Design + Construction - December 2008 - Sustainable Perspectives (Page 50b) Environmental Design + Construction - December 2008 - Resources (Page 51) Environmental Design + Construction - December 2008 - Resources (Page 52) Environmental Design + Construction - December 2008 - Resources (Page 53) Environmental Design + Construction - December 2008 - Resources (Page 54) Environmental Design + Construction - December 2008 - Resources (Page 55) Environmental Design + Construction - December 2008 - Resources (Page 56) Environmental Design + Construction - December 2008 - Resources (Page 57) Environmental Design + Construction - December 2008 - Products (Page 58) Environmental Design + Construction - December 2008 - Products (Page 59) Environmental Design + Construction - December 2008 - Products (Page 60) Environmental Design + Construction - December 2008 - Products (Page 61) Environmental Design + Construction - December 2008 - Products (Page 62) Environmental Design + Construction - December 2008 - Products (Page 63) Environmental Design + Construction - December 2008 - Products (Page 64) Environmental Design + Construction - December 2008 - Products (Page 65) Environmental Design + Construction - December 2008 - Products (Page 66) Environmental Design + Construction - December 2008 - Products (Page 67) Environmental Design + Construction - December 2008 - Products (Page 68) Environmental Design + Construction - December 2008 - Products (Page 69) Environmental Design + Construction - December 2008 - Trade Names (Page 70) Environmental Design + Construction - December 2008 - Trade Names (Page 71) Environmental Design + Construction - December 2008 - Trade Names (Page 72) Environmental Design + Construction - December 2008 - Trade Names (Page 73) Environmental Design + Construction - December 2008 - Trade Names (Page 74) Environmental Design + Construction - December 2008 - Trade Names (Page 74a) Environmental Design + Construction - December 2008 - Trade Names (Page 74b) Environmental Design + Construction - December 2008 - Suppliers (Page 75) Environmental Design + Construction - December 2008 - Suppliers (Page 76) Environmental Design + Construction - December 2008 - Suppliers (Page 77) Environmental Design + Construction - December 2008 - Suppliers (Page 78) Environmental Design + Construction - December 2008 - Suppliers (Page 79) Environmental Design + Construction - December 2008 - Suppliers (Page 80) Environmental Design + Construction - December 2008 - Suppliers (Page 81) Environmental Design + Construction - December 2008 - Suppliers (Page 82) Environmental Design + Construction - December 2008 - Suppliers (Page 83) Environmental Design + Construction - December 2008 - Suppliers (Page 84) Environmental Design + Construction - December 2008 - Suppliers (Page 85) Environmental Design + Construction - December 2008 - Suppliers (Page 86) Environmental Design + Construction - December 2008 - Suppliers (Page 87) Environmental Design + Construction - December 2008 - Suppliers (Page 88) Environmental Design + Construction - December 2008 - Suppliers (Page 89) Environmental Design + Construction - December 2008 - Suppliers (Page 90) Environmental Design + Construction - December 2008 - Suppliers (Page 91) Environmental Design + Construction - December 2008 - Suppliers (Page 92) Environmental Design + Construction - December 2008 - Suppliers (Page 93) Environmental Design + Construction - December 2008 - Suppliers (Page 94) Environmental Design + Construction - December 2008 - Suppliers (Page 95) Environmental Design + Construction - December 2008 - Suppliers (Page 96) Environmental Design + Construction - December 2008 - Suppliers (Page 97) Environmental Design + Construction - December 2008 - Suppliers (Page 98) Environmental Design + Construction - December 2008 - Suppliers (Page 99) Environmental Design + Construction - December 2008 - Suppliers (Page 100) Environmental Design + Construction - December 2008 - Suppliers (Page 101) Environmental Design + Construction - December 2008 - Suppliers (Page 102) Environmental Design + Construction - December 2008 - Suppliers (Page 103) Environmental Design + Construction - December 2008 - Suppliers (Page 104) Environmental Design + Construction - December 2008 - Suppliers (Page 105) Environmental Design + Construction - December 2008 - 2008 Top Products (Page 106) Environmental Design + Construction - December 2008 - 2008 Top Products (Page 107) Environmental Design + Construction - December 2008 - 2008 Top Products (Page 108) Environmental Design + Construction - December 2008 - 2008 Top Products (Page 109) Environmental Design + Construction - December 2008 - Shedding Light on Energy (Page 110) Environmental Design + Construction - December 2008 - Shedding Light on Energy (Page 111) Environmental Design + Construction - December 2008 - Advertiser's Index (Page 112) Environmental Design + Construction - December 2008 - Marketplace %2B Classifieds (Page 113) Environmental Design + Construction - December 2008 - Parting Shot (Page 114) Environmental Design + Construction - December 2008 - Parting Shot (Page Cover3) Environmental Design + Construction - December 2008 - Parting Shot (Page Cover4)
For optimal viewing of this digital publication, please enable JavaScript and then refresh the page. If you would like to try to load the digital publication without using Flash Player detection, please click here.