Engineered Systems - March 2008 - (Page 24) HydroTech BY JOHN KUEMPEL JR., P.E. WHEN VARIABLE Flow Fails After a decade, this piping system went green (and not in the good way). Hydronic designs regularly utilize variable flow. Flow rates change to match load, reduce energy and, in almost all cases, work great. This is an example where standard design and material selection oversight almost caused a catastrophic problem, and ultimately variable flow rate proved to be the cause. A CASE STUDY This modern 30-story high-rise attracted multiple tenants with special cooling loads. This property was originally constructed with a penthouse central plant and individual floor AHUs, cooled by chilled water risers. The chilled water system was designed as variable flow to each unit. Data room units were initially added to the chilled water loop. However, after hours, the central plant was very inefficient. Two major renovations requiring an additional 40 tons of 24/7 cooling sent the building in search of a new answer. The solution? A new heat rejection system was designed, and a second set of pipe risers were installed vertically through the building. These connect to variable flow condenser water pumps and the existing cooling towers, and allow future tenants to connect compressor data units to the condenser water hydronic system. Each unit would be required to have a head pressure water flow control valve, so when cooling wasn’t required, flow rate was reduced and pump energy was saved. This worked great for the first 10 years. The chief engineer in the building called me to come visit in year twelve. He pointed to the Schedule 40 steel condenser water piping on the 10th floor, and there were two small water stains, in-line, that indicated a possible pipe flaw. We coordinated a shutdown to pull out the affected section of pipe, and we expected that a manufacturing defect was the problem. We were surprised. The pipe section pulled out was 50% blocked by organic matter, and only the center volume was open. Testing the pipe wall thickness revealed less than 50% of the original in several areas. We searched for the reason, as the building condenser water treatment was impeccable, and water treatment records and tests had showed above normal maintenance. The condenser water system had main fine-screen strainers and 5 Milacron side-stream media filters that were regularly maintained. Nothing pointed to an answer. We decided upon a second shutdown to pull pipe samples in four more locations. Interestingly enough, the samples from the second floor looked terrible, but the 15th floor, 25th floor, and penthouse samples were as clean as a whistle. Why did this occur only below 15 floors? IT’S ALL ABOUT VARIABLE FLOW The answer proved to be variable flow. When the risers were installed, one of the first heavy load tenants was on the second floor. The tenant left in year 10. The remaining connected load up to the 12th floor was minor, but on floor 12, a major tenant load existed. Calculations indicated a flow rate of 1.5 to 2.5 feet per second (fps) above the 12th floor and from zero to 1.0 fps below. This low flow rate of oxygen-rich We decided upon a second shutdecided upo p second shut down to pull pipe samples down to pull pipe samples in four more locations. Interestingly ou mor ocation Interesting y o o e g enough, the samples from the enough the samples from the second floor looked terrible but second floor looked terrible, but the the 15th floor, 25th floor, and floor, floor, and penth penthouse samples were as clean house sampl les were as clean l as a whistle. Why did this occur hi tl Why did thi only below 15 floors? only below 15 floors? condenser water allowed anaerobic growth (microbes) on the steel pipe at the lower levels. The increased flow rate above 1.5 to 2.5 fps presented the problem. We considered several options to correct the problem. One option we considered was to replace the steel riser piping with copper that would be resistant to the anaerobic attack. Most of the branch piping from the risers were already copper. However, this would have required many outages to critical tenant cooling systems. This was not acceptable to the building owner. Another option was to replace the piping and to install a bypass valve at the bottom of the risers to keep the flow rate above 1.5 fps. This option would have wasted energy and consumed pump capacity that would be needed for future cooling. The solution we selected was the replacement of the lower 12 floors of pipe risers with copper piping, the installation of a plate-and-plate heat exchanger, and secondary variable flow pump to allow the building risers to be a “closed” loop from the tower water. Variable flow systems can be utilized to save energy. However, care must be taken when applying variable flow to open condenser water systems. We found that traditional piping materials were not acceptable. All has been well now for the owner and tenants for many years. ES Kuempel is vice president of design-build for DeBra-Kuempel, an EMCOR company providing HVAC, electrical, plumbing, automation, service, and maintenance in the Cincinnati and Dayton Ohio area. 24 En gi neer ed S y stem s March 2008
Table of Contents Feed for the Digital Edition of Engineered Systems - March 2008 Engineered Systems - March 2008 Contents Editor’s Note Back2Basics HVAC Challenge Case In Point Commissioning Building Automation Energy Wiz HVACR Designer Tips Application Checklist Exemplary Design = Elementary Success The Modern Unit Ventilator On A Mission VAV Systems And Green Design – Part II Issues & Events Products Glossary Classifieds Advertiser Index Tomorrow’s Engineer Engineered Systems - March 2008 Engineered Systems - March 2008 - (Page Intro) Engineered Systems - March 2008 - Engineered Systems - March 2008 (Page Cover1) Engineered Systems - March 2008 - Engineered Systems - March 2008 (Page Cover2) Engineered Systems - March 2008 - Engineered Systems - March 2008 (Page 3) Engineered Systems - March 2008 - Contents (Page 4) Engineered Systems - March 2008 - Contents (Page 5) Engineered Systems - March 2008 - Contents (Page 6) Engineered Systems - March 2008 - Contents (Page 7) Engineered Systems - March 2008 - Editor’s Note (Page 8) Engineered Systems - March 2008 - Editor’s Note (Page 9) Engineered Systems - March 2008 - Back2Basics (Page 10) Engineered Systems - March 2008 - Back2Basics (Page 11) Engineered Systems - March 2008 - HVAC Challenge (Page 12) Engineered Systems - March 2008 - HVAC Challenge (Page 13) Engineered Systems - March 2008 - Case In Point (Page 14) Engineered Systems - March 2008 - Case In Point (Page 15) Engineered Systems - March 2008 - Case In Point (Page 16) Engineered Systems - March 2008 - Case In Point (Page 17) Engineered Systems - March 2008 - Case In Point (Page 18) Engineered Systems - March 2008 - Case In Point (Page 19) Engineered Systems - March 2008 - Case In Point (Page 20) Engineered Systems - March 2008 - Case In Point (Page 21) Engineered Systems - March 2008 - Case In Point (Page 22) Engineered Systems - March 2008 - Case In Point (Page 23) Engineered Systems - March 2008 - Case In Point (Page 24) Engineered Systems - March 2008 - Case In Point (Page 25) Engineered Systems - March 2008 - Commissioning (Page 26) Engineered Systems - March 2008 - Commissioning (Page 27) Engineered Systems - March 2008 - Building Automation (Page 28) Engineered Systems - March 2008 - Building Automation (Page 29) Engineered Systems - March 2008 - Energy Wiz (Page 30) Engineered Systems - March 2008 - Energy Wiz (Page 31) Engineered Systems - March 2008 - HVACR Designer Tips (Page 32) Engineered Systems - March 2008 - HVACR Designer Tips (Page 33) Engineered Systems - March 2008 - Application Checklist (Page 34) Engineered Systems - March 2008 - Application Checklist (Page 35) Engineered Systems - March 2008 - Exemplary Design = Elementary Success (Page 36) Engineered Systems - March 2008 - Exemplary Design = Elementary Success (Page 37) Engineered Systems - March 2008 - Exemplary Design = Elementary Success (Page 38) Engineered Systems - March 2008 - Exemplary Design = Elementary Success (Page 39) Engineered Systems - March 2008 - Exemplary Design = Elementary Success (Page 40) Engineered Systems - March 2008 - Exemplary Design = Elementary Success (Page 41) Engineered Systems - March 2008 - Exemplary Design = Elementary Success (Page 42) Engineered Systems - March 2008 - Exemplary Design = Elementary Success (Page 43) Engineered Systems - March 2008 - The Modern Unit Ventilator (Page 44) Engineered Systems - March 2008 - The Modern Unit Ventilator (Page 45) Engineered Systems - March 2008 - The Modern Unit Ventilator (Page 46) Engineered Systems - March 2008 - The Modern Unit Ventilator (Page 47) Engineered Systems - March 2008 - The Modern Unit Ventilator (Page 48) Engineered Systems - March 2008 - The Modern Unit Ventilator (Page 49) Engineered Systems - March 2008 - The Modern Unit Ventilator (Page 50) Engineered Systems - March 2008 - The Modern Unit Ventilator (Page 51) Engineered Systems - March 2008 - On A Mission (Page 52) Engineered Systems - March 2008 - On A Mission (Page 53) Engineered Systems - March 2008 - On A Mission (Page 54) Engineered Systems - March 2008 - On A Mission (Page 55) Engineered Systems - March 2008 - On A Mission (Page 56) Engineered Systems - March 2008 - On A Mission (Page 57) Engineered Systems - March 2008 - On A Mission (Page 58) Engineered Systems - March 2008 - On A Mission (Page 59) Engineered Systems - March 2008 - VAV Systems And Green Design – Part II (Page 60) Engineered Systems - March 2008 - VAV Systems And Green Design – Part II (Page 61) Engineered Systems - March 2008 - VAV Systems And Green Design – Part II (Page 62) Engineered Systems - March 2008 - VAV Systems And Green Design – Part II (Page 63) Engineered Systems - March 2008 - VAV Systems And Green Design – Part II (Page 64) Engineered Systems - March 2008 - VAV Systems And Green Design – Part II (Page 65) Engineered Systems - March 2008 - Issues & Events (Page 66) Engineered Systems - March 2008 - Issues & Events (Page 67) Engineered Systems - March 2008 - Products (Page 68) Engineered Systems - March 2008 - Glossary (Page 69) Engineered Systems - March 2008 - Classifieds (Page 70) Engineered Systems - March 2008 - Classifieds (Page 71) Engineered Systems - March 2008 - Classifieds (Page 72) Engineered Systems - March 2008 - Advertiser Index (Page 73) Engineered Systems - March 2008 - Tomorrow’s Engineer (Page 74) Engineered Systems - March 2008 - Tomorrow’s Engineer (Page Cover3) Engineered Systems - March 2008 - Tomorrow’s Engineer (Page Cover4)
For optimal viewing of this digital publication, please enable JavaScript and then refresh the page. If you would like to try to load the digital publication without using Flash Player detection, please click here.