Engineered Systems - March 2008 - (Page 32) HVACRDesignerTips BY AMANDA MCKEW RETAIL FACILITIES (SPLIT SYSTEM) Commissioning and Project Closeout Checklist Equipment type: AHU-1, ACCU-1 Equipment designation: Split system Barcode designation: 11111 Area served: Retail facility Equipment location: Roof/ceiling and is trending. • Confirm 10-month warranty meeting to revisit site and discuss lessons learned, etc. DOCUMENTATION TO BUILDING MANAGER • Transfer final commissioning report including: BASIS OF DESIGN • Review and confirm design intent has been met. • Review and confirm control setpoints are within range of design criteria. • Review BAS computer trending to date. • Basis of design/DID • Commissioning plan/specification (for future building program use) • PFPT checklists • Observation checklists • Field reports • Continuous commissioning BAS computer process is in place (if applicable) • Scrubbed FPT narratives for future use • Meeting minutes • Project photograph log and associated photographs • Lessons-learned meeting minutes • Transfer CAD-layered record drawings • Transfer CAD-layered facility management drawings. • Transfer barcoded equipment, panel, and valve database. • Confirm equipment, panels, and valves are barcoded. • Post system flow diagram and TAB flow diagram. • Transfer barcode scanner. • Transfer Commissioning 1-2-3 electronic files. • Transfer CMMS with/or equipment database. • Transfer planned maintenance workorders. • Transfer service contract. • Transfer recommissioning manual. • Transfer ownership of laptop or tablet computer with Internet access and BAS computer for off-site monitoring. • Transfer recommended operating budget. ES SPECIFICATION REVIEW • Confirm Division 1 mechanical and electrical requirements (O&M manuals, record drawings, etc.) have been submitted. • Confirm Division 15 mechanical requirements have been met. • Confirm Division 16 electrical requirements have been met. • Confirm Division 17 building automation requirements have been met. DRAWING REVIEW • Confirm equipment complies with shop drawing submittal. • Confirm equipment and distribution complies with standard details. • Review trade contractor’s punchlist. • Review contractor startup sheets. • Review building automation points list checkout. • Complete site inspection punchlist. • Review water balancing report data-to-actual performance (pressure gauge readings, flow meter readings, etc.). • Review air balancing and temperature operating data (cfm/fan, discharge temperature/fan). BUILDING SYSTEM DEMONSTRATION • Commissioning engineer facilitates the FPTs. • Spot-check system training during FPTs. • Spot-check O&M manuals during FPTs. • Confirm PM workorders are complete and ready to begin at time of certificate of occupancy. • Confirm BAS computer predictive maintenance monitoring and workorder initiation is complete and ready to begin at time of certificate of occupancy. • Maintain corrective action log and necessary retesting. • Set and observe that deferred seasonal FPT has been completed. • Complete final commissioning report. ❍ Central Equipment ❍ Terminal Equipment & Space ✔ ❍ Project Closeout McKew is an HVAC commissioning engineer in the Building Solutions Group at RDK Engineers. If you have any comments, suggestions, or questions regarding this designer checklist, contact Amanda McKew at amckew@rdkengineers.com. This column is meant to provide some basic guidelines for good design. Always consult all necessary codes and resources relevant to each particular project. LEED® CERTIFICATION COMPLIANCE • Complete recommissioning manual. • Confirm system training has been completed and facility staff signoff on training class attendance. • Confirm LEED® energy optimization software and associated system simulation is programmed and is trending. • Confirm LEED measuring and verification plan is programmed 32 En gi neer ed S y stem s March 2008
Table of Contents Feed for the Digital Edition of Engineered Systems - March 2008 Engineered Systems - March 2008 Contents Editor’s Note Back2Basics HVAC Challenge Case In Point Commissioning Building Automation Energy Wiz HVACR Designer Tips Application Checklist Exemplary Design = Elementary Success The Modern Unit Ventilator On A Mission VAV Systems And Green Design – Part II Issues & Events Products Glossary Classifieds Advertiser Index Tomorrow’s Engineer Engineered Systems - March 2008 Engineered Systems - March 2008 - (Page Intro) Engineered Systems - March 2008 - Engineered Systems - March 2008 (Page Cover1) Engineered Systems - March 2008 - Engineered Systems - March 2008 (Page Cover2) Engineered Systems - March 2008 - Engineered Systems - March 2008 (Page 3) Engineered Systems - March 2008 - Contents (Page 4) Engineered Systems - March 2008 - Contents (Page 5) Engineered Systems - March 2008 - Contents (Page 6) Engineered Systems - March 2008 - Contents (Page 7) Engineered Systems - March 2008 - Editor’s Note (Page 8) Engineered Systems - March 2008 - Editor’s Note (Page 9) Engineered Systems - March 2008 - Back2Basics (Page 10) Engineered Systems - March 2008 - Back2Basics (Page 11) Engineered Systems - March 2008 - HVAC Challenge (Page 12) Engineered Systems - March 2008 - HVAC Challenge (Page 13) Engineered Systems - March 2008 - Case In Point (Page 14) Engineered Systems - March 2008 - Case In Point (Page 15) Engineered Systems - March 2008 - Case In Point (Page 16) Engineered Systems - March 2008 - Case In Point (Page 17) Engineered Systems - March 2008 - Case In Point (Page 18) Engineered Systems - March 2008 - Case In Point (Page 19) Engineered Systems - March 2008 - Case In Point (Page 20) Engineered Systems - March 2008 - Case In Point (Page 21) Engineered Systems - March 2008 - Case In Point (Page 22) Engineered Systems - March 2008 - Case In Point (Page 23) Engineered Systems - March 2008 - Case In Point (Page 24) Engineered Systems - March 2008 - Case In Point (Page 25) Engineered Systems - March 2008 - Commissioning (Page 26) Engineered Systems - March 2008 - Commissioning (Page 27) Engineered Systems - March 2008 - Building Automation (Page 28) Engineered Systems - March 2008 - Building Automation (Page 29) Engineered Systems - March 2008 - Energy Wiz (Page 30) Engineered Systems - March 2008 - Energy Wiz (Page 31) Engineered Systems - March 2008 - HVACR Designer Tips (Page 32) Engineered Systems - March 2008 - HVACR Designer Tips (Page 33) Engineered Systems - March 2008 - Application Checklist (Page 34) Engineered Systems - March 2008 - Application Checklist (Page 35) Engineered Systems - March 2008 - Exemplary Design = Elementary Success (Page 36) Engineered Systems - March 2008 - Exemplary Design = Elementary Success (Page 37) Engineered Systems - March 2008 - Exemplary Design = Elementary Success (Page 38) Engineered Systems - March 2008 - Exemplary Design = Elementary Success (Page 39) Engineered Systems - March 2008 - Exemplary Design = Elementary Success (Page 40) Engineered Systems - March 2008 - Exemplary Design = Elementary Success (Page 41) Engineered Systems - March 2008 - Exemplary Design = Elementary Success (Page 42) Engineered Systems - March 2008 - Exemplary Design = Elementary Success (Page 43) Engineered Systems - March 2008 - The Modern Unit Ventilator (Page 44) Engineered Systems - March 2008 - The Modern Unit Ventilator (Page 45) Engineered Systems - March 2008 - The Modern Unit Ventilator (Page 46) Engineered Systems - March 2008 - The Modern Unit Ventilator (Page 47) Engineered Systems - March 2008 - The Modern Unit Ventilator (Page 48) Engineered Systems - March 2008 - The Modern Unit Ventilator (Page 49) Engineered Systems - March 2008 - The Modern Unit Ventilator (Page 50) Engineered Systems - March 2008 - The Modern Unit Ventilator (Page 51) Engineered Systems - March 2008 - On A Mission (Page 52) Engineered Systems - March 2008 - On A Mission (Page 53) Engineered Systems - March 2008 - On A Mission (Page 54) Engineered Systems - March 2008 - On A Mission (Page 55) Engineered Systems - March 2008 - On A Mission (Page 56) Engineered Systems - March 2008 - On A Mission (Page 57) Engineered Systems - March 2008 - On A Mission (Page 58) Engineered Systems - March 2008 - On A Mission (Page 59) Engineered Systems - March 2008 - VAV Systems And Green Design – Part II (Page 60) Engineered Systems - March 2008 - VAV Systems And Green Design – Part II (Page 61) Engineered Systems - March 2008 - VAV Systems And Green Design – Part II (Page 62) Engineered Systems - March 2008 - VAV Systems And Green Design – Part II (Page 63) Engineered Systems - March 2008 - VAV Systems And Green Design – Part II (Page 64) Engineered Systems - March 2008 - VAV Systems And Green Design – Part II (Page 65) Engineered Systems - March 2008 - Issues & Events (Page 66) Engineered Systems - March 2008 - Issues & Events (Page 67) Engineered Systems - March 2008 - Products (Page 68) Engineered Systems - March 2008 - Glossary (Page 69) Engineered Systems - March 2008 - Classifieds (Page 70) Engineered Systems - March 2008 - Classifieds (Page 71) Engineered Systems - March 2008 - Classifieds (Page 72) Engineered Systems - March 2008 - Advertiser Index (Page 73) Engineered Systems - March 2008 - Tomorrow’s Engineer (Page 74) Engineered Systems - March 2008 - Tomorrow’s Engineer (Page Cover3) Engineered Systems - March 2008 - Tomorrow’s Engineer (Page Cover4)
For optimal viewing of this digital publication, please enable JavaScript and then refresh the page. If you would like to try to load the digital publication without using Flash Player detection, please click here.