Engineered Systems - March 2008 - (Page 38) Exemplary Success To date, our team has completed four prototype designs for PSD. The first school, Zach Elementary School in Fort Collins, CO, served as the original prototype and was completed in 2002. Soon to follow was the completion of Bacon Elementary School, also in Fort Collins in 2003, and most recently completed was Rice Elementary School in Wellington, CO in 2007. A fourth school, Bethke Elementary School, is under construction in Timnath, CO and slated for completion in the spring of 2008. PSD has chosen to pursue LEED® Certification under the 2007 LEED for Schools category. If Bethke Elementary School does achieve the LEED for Schools Gold Certification, it may be the first school certified under the USGBC’s new category. PSD has been very progressive in the area of sustainable design and notably in their utilization of an integrated design approach, involving all project stakeholders in the design process from start to finish. Each of the four prototype schools incorporates “microload” building design, which utilizes a high-efficiency building envelope, daylighting design, and reduces internal gains, allowing heating and cooling systems to be significantly downsized. The overall design cooling load is more than 50% below that of a conventional building construction and design, and the annual energy savings are greater than 50% when compared to conventional construction. RICE ELEMENTARY SCHOOL Our firm was fortunate to work with an architect that believes in and applied the concepts of integrated design. The architectural features of Rice Elementary are the driving force behind the superior The heating system at Rice Elementary School in Wellington, CO, heating system consists of two high-efficiency, gas-fired boilers with staged capacity control. fer • Baucom Engineering & Consulting (SBEC), as part of the successful design team, was selected as the mechanical and electrical systems designer. creating Healthy COMFORTABLE ENVIRONMENT S Environmental Separation • A I R D O O R S / C U R TA I N S • A I R E N T R A N C E SYS T E M S D O O R H E AT E R S F R E S H A I R V E N T I L AT I O N SYS T E M S Fresh Air Recovery just ask. www.berner.com 800-245-4455 FREE INFO: 77 www.bernerenergy.com 800-479-0988 38 ESM03084Berner.indd 1 En gi neer ed S y stem s March 2008 2/20/08 10:34:08 AM http://www.berner.com http://www.bernerenergy.com
Table of Contents Feed for the Digital Edition of Engineered Systems - March 2008 Engineered Systems - March 2008 Contents Editor’s Note Back2Basics HVAC Challenge Case In Point Commissioning Building Automation Energy Wiz HVACR Designer Tips Application Checklist Exemplary Design = Elementary Success The Modern Unit Ventilator On A Mission VAV Systems And Green Design – Part II Issues & Events Products Glossary Classifieds Advertiser Index Tomorrow’s Engineer Engineered Systems - March 2008 Engineered Systems - March 2008 - (Page Intro) Engineered Systems - March 2008 - Engineered Systems - March 2008 (Page Cover1) Engineered Systems - March 2008 - Engineered Systems - March 2008 (Page Cover2) Engineered Systems - March 2008 - Engineered Systems - March 2008 (Page 3) Engineered Systems - March 2008 - Contents (Page 4) Engineered Systems - March 2008 - Contents (Page 5) Engineered Systems - March 2008 - Contents (Page 6) Engineered Systems - March 2008 - Contents (Page 7) Engineered Systems - March 2008 - Editor’s Note (Page 8) Engineered Systems - March 2008 - Editor’s Note (Page 9) Engineered Systems - March 2008 - Back2Basics (Page 10) Engineered Systems - March 2008 - Back2Basics (Page 11) Engineered Systems - March 2008 - HVAC Challenge (Page 12) Engineered Systems - March 2008 - HVAC Challenge (Page 13) Engineered Systems - March 2008 - Case In Point (Page 14) Engineered Systems - March 2008 - Case In Point (Page 15) Engineered Systems - March 2008 - Case In Point (Page 16) Engineered Systems - March 2008 - Case In Point (Page 17) Engineered Systems - March 2008 - Case In Point (Page 18) Engineered Systems - March 2008 - Case In Point (Page 19) Engineered Systems - March 2008 - Case In Point (Page 20) Engineered Systems - March 2008 - Case In Point (Page 21) Engineered Systems - March 2008 - Case In Point (Page 22) Engineered Systems - March 2008 - Case In Point (Page 23) Engineered Systems - March 2008 - Case In Point (Page 24) Engineered Systems - March 2008 - Case In Point (Page 25) Engineered Systems - March 2008 - Commissioning (Page 26) Engineered Systems - March 2008 - Commissioning (Page 27) Engineered Systems - March 2008 - Building Automation (Page 28) Engineered Systems - March 2008 - Building Automation (Page 29) Engineered Systems - March 2008 - Energy Wiz (Page 30) Engineered Systems - March 2008 - Energy Wiz (Page 31) Engineered Systems - March 2008 - HVACR Designer Tips (Page 32) Engineered Systems - March 2008 - HVACR Designer Tips (Page 33) Engineered Systems - March 2008 - Application Checklist (Page 34) Engineered Systems - March 2008 - Application Checklist (Page 35) Engineered Systems - March 2008 - Exemplary Design = Elementary Success (Page 36) Engineered Systems - March 2008 - Exemplary Design = Elementary Success (Page 37) Engineered Systems - March 2008 - Exemplary Design = Elementary Success (Page 38) Engineered Systems - March 2008 - Exemplary Design = Elementary Success (Page 39) Engineered Systems - March 2008 - Exemplary Design = Elementary Success (Page 40) Engineered Systems - March 2008 - Exemplary Design = Elementary Success (Page 41) Engineered Systems - March 2008 - Exemplary Design = Elementary Success (Page 42) Engineered Systems - March 2008 - Exemplary Design = Elementary Success (Page 43) Engineered Systems - March 2008 - The Modern Unit Ventilator (Page 44) Engineered Systems - March 2008 - The Modern Unit Ventilator (Page 45) Engineered Systems - March 2008 - The Modern Unit Ventilator (Page 46) Engineered Systems - March 2008 - The Modern Unit Ventilator (Page 47) Engineered Systems - March 2008 - The Modern Unit Ventilator (Page 48) Engineered Systems - March 2008 - The Modern Unit Ventilator (Page 49) Engineered Systems - March 2008 - The Modern Unit Ventilator (Page 50) Engineered Systems - March 2008 - The Modern Unit Ventilator (Page 51) Engineered Systems - March 2008 - On A Mission (Page 52) Engineered Systems - March 2008 - On A Mission (Page 53) Engineered Systems - March 2008 - On A Mission (Page 54) Engineered Systems - March 2008 - On A Mission (Page 55) Engineered Systems - March 2008 - On A Mission (Page 56) Engineered Systems - March 2008 - On A Mission (Page 57) Engineered Systems - March 2008 - On A Mission (Page 58) Engineered Systems - March 2008 - On A Mission (Page 59) Engineered Systems - March 2008 - VAV Systems And Green Design – Part II (Page 60) Engineered Systems - March 2008 - VAV Systems And Green Design – Part II (Page 61) Engineered Systems - March 2008 - VAV Systems And Green Design – Part II (Page 62) Engineered Systems - March 2008 - VAV Systems And Green Design – Part II (Page 63) Engineered Systems - March 2008 - VAV Systems And Green Design – Part II (Page 64) Engineered Systems - March 2008 - VAV Systems And Green Design – Part II (Page 65) Engineered Systems - March 2008 - Issues & Events (Page 66) Engineered Systems - March 2008 - Issues & Events (Page 67) Engineered Systems - March 2008 - Products (Page 68) Engineered Systems - March 2008 - Glossary (Page 69) Engineered Systems - March 2008 - Classifieds (Page 70) Engineered Systems - March 2008 - Classifieds (Page 71) Engineered Systems - March 2008 - Classifieds (Page 72) Engineered Systems - March 2008 - Advertiser Index (Page 73) Engineered Systems - March 2008 - Tomorrow’s Engineer (Page 74) Engineered Systems - March 2008 - Tomorrow’s Engineer (Page Cover3) Engineered Systems - March 2008 - Tomorrow’s Engineer (Page Cover4)
For optimal viewing of this digital publication, please enable JavaScript and then refresh the page. If you would like to try to load the digital publication without using Flash Player detection, please click here.