Engineered Systems - March 2008 - (Page 50) HVAC Here is why the CESVA SC-160 or SC-310 Meter is essential for your job: The Modern Unit Ventilator lems, a prime one previously mentioned (leaky dampers), and all of them easily solvable by using F/BP. Years ago, some engineers felt there was a significant benefit to using a blow-through coil configuration rather than draw-through. Blow-through mixed the air before it came to the coil and minimized stratification (another prime freeze cause). However, a bigger freeze cause is valve control of the hot water coil. In a UWUV, the coil is 5 or 6 ft long and fed from one end. The room thermostat control is based on average temperature, and it was not uncommon to see temperature differences of 30°F or 40° from one end of the coil to the other. Maintenance. A big plus for UVs vs. a central system such as VAV is that an outage will only affect one room, not the whole building. However, a big negative is that UWUVs are hard to work on when things do need maintenance. All work has to be done either kneeling or lying on the floor. The end compartments of UWUVs will get very congested with piping and controllers, making that equipment hard to get to (this is another area where F/BP offers advantages with fewer devices to pipe up). The VUV tends to have a lot more room for piping and controls, and all work can be done by one mechanic standing on the floor. 12/13/07 1:06:57 PM 800-224-3813 FREE INFO: 17 ES01084Scantek.indd 1 NO DUCT TAPE KLO-SHURE® INSULATION COUPLINGS • • • • • • • Installs 60% faster Supports tubing and secures insulation Superior vapor barrier Eliminates insulation compression Improved finish – no tape, no glue Reduced material cost Meets the 25/50 flame spread/smoke developed index Contact us today to request your FREE product catalog, and learn how well Klo-Shure Insulation Couplings can work for your next project! CONCLUSION The UV still has a place in school design, but not the way it was done 20 years ago. The UV should be considered when doing renovations of existing UV schools. The UV should be strongly considered for buildings that have insufficient headroom for central air handler ductwork. And when properly applied, the UV can be less expensive to build, less expensive to operate and easier to maintain than other options, without compromising IAQ, occupant comfort, or humidity control. ES 1-800-839-0891 or www.klo-shure.com Durkin is a principal at Durkin & Villalta Partners Engineering (Indianapolis). Reach him at tdurkin@ dvpe.net. Partington is vice president of Temspec Inc. (Toronto). Reach him at bpartington@ temspec.com. FREE INFO: 75 50 En gi neer ed S y stem s March 2008 http://www.scantekinc.com http://www.scantekinc.com http://www.klo-shure.com
Table of Contents Feed for the Digital Edition of Engineered Systems - March 2008 Engineered Systems - March 2008 Contents Editor’s Note Back2Basics HVAC Challenge Case In Point Commissioning Building Automation Energy Wiz HVACR Designer Tips Application Checklist Exemplary Design = Elementary Success The Modern Unit Ventilator On A Mission VAV Systems And Green Design – Part II Issues & Events Products Glossary Classifieds Advertiser Index Tomorrow’s Engineer Engineered Systems - March 2008 Engineered Systems - March 2008 - (Page Intro) Engineered Systems - March 2008 - Engineered Systems - March 2008 (Page Cover1) Engineered Systems - March 2008 - Engineered Systems - March 2008 (Page Cover2) Engineered Systems - March 2008 - Engineered Systems - March 2008 (Page 3) Engineered Systems - March 2008 - Contents (Page 4) Engineered Systems - March 2008 - Contents (Page 5) Engineered Systems - March 2008 - Contents (Page 6) Engineered Systems - March 2008 - Contents (Page 7) Engineered Systems - March 2008 - Editor’s Note (Page 8) Engineered Systems - March 2008 - Editor’s Note (Page 9) Engineered Systems - March 2008 - Back2Basics (Page 10) Engineered Systems - March 2008 - Back2Basics (Page 11) Engineered Systems - March 2008 - HVAC Challenge (Page 12) Engineered Systems - March 2008 - HVAC Challenge (Page 13) Engineered Systems - March 2008 - Case In Point (Page 14) Engineered Systems - March 2008 - Case In Point (Page 15) Engineered Systems - March 2008 - Case In Point (Page 16) Engineered Systems - March 2008 - Case In Point (Page 17) Engineered Systems - March 2008 - Case In Point (Page 18) Engineered Systems - March 2008 - Case In Point (Page 19) Engineered Systems - March 2008 - Case In Point (Page 20) Engineered Systems - March 2008 - Case In Point (Page 21) Engineered Systems - March 2008 - Case In Point (Page 22) Engineered Systems - March 2008 - Case In Point (Page 23) Engineered Systems - March 2008 - Case In Point (Page 24) Engineered Systems - March 2008 - Case In Point (Page 25) Engineered Systems - March 2008 - Commissioning (Page 26) Engineered Systems - March 2008 - Commissioning (Page 27) Engineered Systems - March 2008 - Building Automation (Page 28) Engineered Systems - March 2008 - Building Automation (Page 29) Engineered Systems - March 2008 - Energy Wiz (Page 30) Engineered Systems - March 2008 - Energy Wiz (Page 31) Engineered Systems - March 2008 - HVACR Designer Tips (Page 32) Engineered Systems - March 2008 - HVACR Designer Tips (Page 33) Engineered Systems - March 2008 - Application Checklist (Page 34) Engineered Systems - March 2008 - Application Checklist (Page 35) Engineered Systems - March 2008 - Exemplary Design = Elementary Success (Page 36) Engineered Systems - March 2008 - Exemplary Design = Elementary Success (Page 37) Engineered Systems - March 2008 - Exemplary Design = Elementary Success (Page 38) Engineered Systems - March 2008 - Exemplary Design = Elementary Success (Page 39) Engineered Systems - March 2008 - Exemplary Design = Elementary Success (Page 40) Engineered Systems - March 2008 - Exemplary Design = Elementary Success (Page 41) Engineered Systems - March 2008 - Exemplary Design = Elementary Success (Page 42) Engineered Systems - March 2008 - Exemplary Design = Elementary Success (Page 43) Engineered Systems - March 2008 - The Modern Unit Ventilator (Page 44) Engineered Systems - March 2008 - The Modern Unit Ventilator (Page 45) Engineered Systems - March 2008 - The Modern Unit Ventilator (Page 46) Engineered Systems - March 2008 - The Modern Unit Ventilator (Page 47) Engineered Systems - March 2008 - The Modern Unit Ventilator (Page 48) Engineered Systems - March 2008 - The Modern Unit Ventilator (Page 49) Engineered Systems - March 2008 - The Modern Unit Ventilator (Page 50) Engineered Systems - March 2008 - The Modern Unit Ventilator (Page 51) Engineered Systems - March 2008 - On A Mission (Page 52) Engineered Systems - March 2008 - On A Mission (Page 53) Engineered Systems - March 2008 - On A Mission (Page 54) Engineered Systems - March 2008 - On A Mission (Page 55) Engineered Systems - March 2008 - On A Mission (Page 56) Engineered Systems - March 2008 - On A Mission (Page 57) Engineered Systems - March 2008 - On A Mission (Page 58) Engineered Systems - March 2008 - On A Mission (Page 59) Engineered Systems - March 2008 - VAV Systems And Green Design – Part II (Page 60) Engineered Systems - March 2008 - VAV Systems And Green Design – Part II (Page 61) Engineered Systems - March 2008 - VAV Systems And Green Design – Part II (Page 62) Engineered Systems - March 2008 - VAV Systems And Green Design – Part II (Page 63) Engineered Systems - March 2008 - VAV Systems And Green Design – Part II (Page 64) Engineered Systems - March 2008 - VAV Systems And Green Design – Part II (Page 65) Engineered Systems - March 2008 - Issues & Events (Page 66) Engineered Systems - March 2008 - Issues & Events (Page 67) Engineered Systems - March 2008 - Products (Page 68) Engineered Systems - March 2008 - Glossary (Page 69) Engineered Systems - March 2008 - Classifieds (Page 70) Engineered Systems - March 2008 - Classifieds (Page 71) Engineered Systems - March 2008 - Classifieds (Page 72) Engineered Systems - March 2008 - Advertiser Index (Page 73) Engineered Systems - March 2008 - Tomorrow’s Engineer (Page 74) Engineered Systems - March 2008 - Tomorrow’s Engineer (Page Cover3) Engineered Systems - March 2008 - Tomorrow’s Engineer (Page Cover4)
For optimal viewing of this digital publication, please enable JavaScript and then refresh the page. If you would like to try to load the digital publication without using Flash Player detection, please click here.