Engineered Systems - April 2008 - (Page 17) CaseInPoint Retrofit makes 35% fuel savings a habit for Dominican Sisters Standard Plumbing Heating Controls Corporation of Spokane, WA, recently designed a new heating and domestic hot water system for the Dominican Center, which was constructed in 1969 to house the Dominican Sisters, who work with charity organizations worldwide to help troubled women and victims of abuse and addiction. Originally designed with a separate boiler room located 150 ft away from the main building, the heating plant housed a 3 million Btuh firetube boiler. The steam was piped underground from the boiler room across the entire length of the building to a steam-to-water converter located 350 ft away, where water was heated at 120°F to 180° to heat the building. The building that housed the boiler room also produced domestic hot water for the center, which was stored and maintained at 150° in a 546-gal tank before being piped to the main building. LUKEWARM INSTEAD OF COLD “While the equipment had been well maintained and the piping was in good condition, a significant amount of heat was being lost in many unwanted areas, causing the cold water to run lukewarm and the crawl spaces and storage areas to become unbearably hot,” explained Dave Ressa, the center’s the facilities manager. “We estimated that the steam boiler was running at an efficiency of 60%, so for each one million Btu of natural gas, the boiler used only 600,000 Btuh to make steam and the other 400,000 Btuh was lost to venting, piping, or the air in the boiler room.” Designer Don Smet chose two Lochinvar KNIGHT Boilers with 500,000 Btuh and 95% thermal efficiency to heat the building; in addition, he selected a Lochinvar ARMOR Water Heater with 399,000 Btuh and up to 98% efficiency and a new ASME 100-gal insulated storage tank to supply domestic hot water for the entire building and kitchen. As Smet explained, “We accessed the existing four-in. water heating loop by welding two closely spaced two-and-a-half-in. tees and valves behind the boilers using a primary/secondary configuration. The two boilers were then piped in cleanly and easily, utilizing their own circulating pumps.” FREE INFO: 8 FREE INFO: 137 w w w. esmag a zin e . c o m 17 http://www.marsair.com http://www.marsair.com http://www.automatedbuildings.com http://www.esmagazine.com
Table of Contents Feed for the Digital Edition of Engineered Systems - April 2008 Engineered Systems - April 2008 Contents Editor’s Note Back2Basics HVAC Challenge Case In Point Commissioning Building Automation Energy Wiz HVACR Designer Tips This Time, Water Cooled Was All Wet Cleanroom Design In 10 Easy Steps It's Not The Heat, It's The Humidity Issues & Events Computers and Software Products Glossary Classifieds Advertiser Index Tomorrow’s Engineer Engineered Systems - April 2008 Engineered Systems - April 2008 - (Page Intro) Engineered Systems - April 2008 - Engineered Systems - April 2008 (Page 1) Engineered Systems - April 2008 - Engineered Systems - April 2008 (Page 2) Engineered Systems - April 2008 - Engineered Systems - April 2008 (Page 3) Engineered Systems - April 2008 - Contents (Page 4) Engineered Systems - April 2008 - Contents (Page 5) Engineered Systems - April 2008 - Contents (Page 6) Engineered Systems - April 2008 - Contents (Page 7) Engineered Systems - April 2008 - Editor’s Note (Page 8) Engineered Systems - April 2008 - Editor’s Note (Page 9) Engineered Systems - April 2008 - Back2Basics (Page 10) Engineered Systems - April 2008 - Back2Basics (Page 11) Engineered Systems - April 2008 - HVAC Challenge (Page 12) Engineered Systems - April 2008 - HVAC Challenge (Page 13) Engineered Systems - April 2008 - Case In Point (Page 14) Engineered Systems - April 2008 - Case In Point (Page 15) Engineered Systems - April 2008 - Case In Point (Page 16) Engineered Systems - April 2008 - Case In Point (Page 17) Engineered Systems - April 2008 - Case In Point (Page 18) Engineered Systems - April 2008 - Case In Point (Page 19) Engineered Systems - April 2008 - Case In Point (Page 20) Engineered Systems - April 2008 - Case In Point (Page 21) Engineered Systems - April 2008 - Case In Point (Page 22) Engineered Systems - April 2008 - Case In Point (Page 23) Engineered Systems - April 2008 - Case In Point (Page 24) Engineered Systems - April 2008 - Case In Point (Page 25) Engineered Systems - April 2008 - Commissioning (Page 26) Engineered Systems - April 2008 - Commissioning (Page 27) Engineered Systems - April 2008 - Building Automation (Page 28) Engineered Systems - April 2008 - Building Automation (Page 29) Engineered Systems - April 2008 - Energy Wiz (Page 30) Engineered Systems - April 2008 - Energy Wiz (Page 31) Engineered Systems - April 2008 - HVACR Designer Tips (Page 32) Engineered Systems - April 2008 - HVACR Designer Tips (Page 33) Engineered Systems - April 2008 - This Time, Water Cooled Was All Wet (Page 34) Engineered Systems - April 2008 - This Time, Water Cooled Was All Wet (Page 35) Engineered Systems - April 2008 - This Time, Water Cooled Was All Wet (Page 36) Engineered Systems - April 2008 - This Time, Water Cooled Was All Wet (Page 37) Engineered Systems - April 2008 - This Time, Water Cooled Was All Wet (Page 38) Engineered Systems - April 2008 - This Time, Water Cooled Was All Wet (Page 39) Engineered Systems - April 2008 - This Time, Water Cooled Was All Wet (Page 40) Engineered Systems - April 2008 - This Time, Water Cooled Was All Wet (Page 41) Engineered Systems - April 2008 - This Time, Water Cooled Was All Wet (Page 42) Engineered Systems - April 2008 - Cleanroom Design In 10 Easy Steps (Page 43) Engineered Systems - April 2008 - Cleanroom Design In 10 Easy Steps (Page 44) Engineered Systems - April 2008 - Cleanroom Design In 10 Easy Steps (Page 45) Engineered Systems - April 2008 - Cleanroom Design In 10 Easy Steps (Page 46) Engineered Systems - April 2008 - Cleanroom Design In 10 Easy Steps (Page 47) Engineered Systems - April 2008 - Cleanroom Design In 10 Easy Steps (Page 48) Engineered Systems - April 2008 - Cleanroom Design In 10 Easy Steps (Page 49) Engineered Systems - April 2008 - Cleanroom Design In 10 Easy Steps (Page 50) Engineered Systems - April 2008 - Cleanroom Design In 10 Easy Steps (Page 51) Engineered Systems - April 2008 - Cleanroom Design In 10 Easy Steps (Page 52) Engineered Systems - April 2008 - Cleanroom Design In 10 Easy Steps (Page 53) Engineered Systems - April 2008 - Cleanroom Design In 10 Easy Steps (Page 54) Engineered Systems - April 2008 - Cleanroom Design In 10 Easy Steps (Page 55) Engineered Systems - April 2008 - It's Not The Heat, It's The Humidity (Page 56) Engineered Systems - April 2008 - It's Not The Heat, It's The Humidity (Page 57) Engineered Systems - April 2008 - It's Not The Heat, It's The Humidity (Page 58) Engineered Systems - April 2008 - It's Not The Heat, It's The Humidity (Page 59) Engineered Systems - April 2008 - It's Not The Heat, It's The Humidity (Page 60) Engineered Systems - April 2008 - It's Not The Heat, It's The Humidity (Page 61) Engineered Systems - April 2008 - It's Not The Heat, It's The Humidity (Page 62) Engineered Systems - April 2008 - It's Not The Heat, It's The Humidity (Page 63) Engineered Systems - April 2008 - Issues & Events (Page 64) Engineered Systems - April 2008 - Issues & Events (Page 65) Engineered Systems - April 2008 - Issues & Events (Page 66) Engineered Systems - April 2008 - Issues & Events (Page 67) Engineered Systems - April 2008 - Issues & Events (Page 68) Engineered Systems - April 2008 - Computers and Software (Page 69) Engineered Systems - April 2008 - Products (Page 70) Engineered Systems - April 2008 - Products (Page 71) Engineered Systems - April 2008 - Products (Page 72) Engineered Systems - April 2008 - Glossary (Page 73) Engineered Systems - April 2008 - Classifieds (Page 74) Engineered Systems - April 2008 - Classifieds (Page 75) Engineered Systems - April 2008 - Classifieds (Page 76) Engineered Systems - April 2008 - Advertiser Index (Page 77) Engineered Systems - April 2008 - Tomorrow’s Engineer (Page 78) Engineered Systems - April 2008 - Tomorrow’s Engineer (Page 79) Engineered Systems - April 2008 - Tomorrow’s Engineer (Page 80)
For optimal viewing of this digital publication, please enable JavaScript and then refresh the page. If you would like to try to load the digital publication without using Flash Player detection, please click here.