Engineered Systems - April 2008 - (Page 18) CaseInPoint For the first time since 1969, the Dominican Sisters living at this facility have access to cold rather than lukewarm water, as well as nearly instantaneous hot water in all of their dorm rooms and the kitchen, thanks to new boilers and a hot water heater. Welcome to the greener side of the fence. It’s obvious that Carlyle compressors are green, but did you know Carlyle can help you be green in more ways than one? Carlyle compressors have an average life span of 9.9 years, nearly double that of the competition’s life span of 5.2 years. That reliability translates to a $15,000 savings per store in critical downtime, repair and replacement costs for you. Also, a more reliable compressor means less scrap waste going into the environment. And for low temperature applications Carlyle offers our Compound Cooling compressor, the most energy efficient compressor in the industry. So why not consider the option that allows you to save time, money and the environment? There’s never been a better time to go green. For more information regarding Carlyle’s reliability data and the cost savings per store, visit www.CarlyleCompressor.com. The direct venting was accomplished by running the PVC piping up through the ceiling of the basement to the main floor, into the attic, and then out above the architectural roof. The Standard team took advantage of the KNIGHT’s built-in cascading sequencer by simply wiring the two new boilers with a two wire pair and then completing the quick and easy set up of the controls and burners. Piping for the ARMOR domestic water heater and tank was simple and straightforward. The new piping was run to the existing hot and cold water pipes located in the building’s basement. Since the water softener had been piped to the heating system in the old boiler room 150 ft away, it had to be relocated and piped in next to the ARMOR. The cold water line coming into the building remained the same, but the hot water line had to be cut and isolated from the old boiler room. The lead installer for the project, Dan Sem, then converted the old hot water line, which had been cut in the tunnel leaving the center, to a hot water recirculation line for the new system by coupling the newly cut end to a three-quarter-in. PEX line and running it all the way back to the ARMOR water heater with a mini pump. A LONG WAIT FOR COLD WATER Once this isolation and recirculation line was complete, the ARMOR was fired up and the new domestic hot water system was running beautifully. The Smart System control on both the KNIGHT and ARMOR made the set up of the cascade, outdoor reset, night setback, and heating and domestic water setpoints and controls a quick and painless endeavor. For the first time since 1969, the Dominican Sisters have access to cold rather than lukewarm water, as well as nearly instantaneous hot water in all of their dorm rooms and the kitchen. The 100 gal of stored domestic hot water is now maintained at 140°, and the building’s water heating setpoint is controlled solely on the cascade modulation of the boilers and the outdoor temperature. The new system is dramatically more stable and efficient than the previous system. With an investment of $65,500, the center can expect a minimum of 35% fuel savings; and with the local utility company’s 30% reimbursement, a three- to four-year payback will easily be achieved. FREE INFO: 131 18 En gi neer ed S y stem s April 2008 http://www.CarlyleCompressor.com http://www.CarlyleCompressor.com
Table of Contents Feed for the Digital Edition of Engineered Systems - April 2008 Engineered Systems - April 2008 Contents Editor’s Note Back2Basics HVAC Challenge Case In Point Commissioning Building Automation Energy Wiz HVACR Designer Tips This Time, Water Cooled Was All Wet Cleanroom Design In 10 Easy Steps It's Not The Heat, It's The Humidity Issues & Events Computers and Software Products Glossary Classifieds Advertiser Index Tomorrow’s Engineer Engineered Systems - April 2008 Engineered Systems - April 2008 - (Page Intro) Engineered Systems - April 2008 - Engineered Systems - April 2008 (Page 1) Engineered Systems - April 2008 - Engineered Systems - April 2008 (Page 2) Engineered Systems - April 2008 - Engineered Systems - April 2008 (Page 3) Engineered Systems - April 2008 - Contents (Page 4) Engineered Systems - April 2008 - Contents (Page 5) Engineered Systems - April 2008 - Contents (Page 6) Engineered Systems - April 2008 - Contents (Page 7) Engineered Systems - April 2008 - Editor’s Note (Page 8) Engineered Systems - April 2008 - Editor’s Note (Page 9) Engineered Systems - April 2008 - Back2Basics (Page 10) Engineered Systems - April 2008 - Back2Basics (Page 11) Engineered Systems - April 2008 - HVAC Challenge (Page 12) Engineered Systems - April 2008 - HVAC Challenge (Page 13) Engineered Systems - April 2008 - Case In Point (Page 14) Engineered Systems - April 2008 - Case In Point (Page 15) Engineered Systems - April 2008 - Case In Point (Page 16) Engineered Systems - April 2008 - Case In Point (Page 17) Engineered Systems - April 2008 - Case In Point (Page 18) Engineered Systems - April 2008 - Case In Point (Page 19) Engineered Systems - April 2008 - Case In Point (Page 20) Engineered Systems - April 2008 - Case In Point (Page 21) Engineered Systems - April 2008 - Case In Point (Page 22) Engineered Systems - April 2008 - Case In Point (Page 23) Engineered Systems - April 2008 - Case In Point (Page 24) Engineered Systems - April 2008 - Case In Point (Page 25) Engineered Systems - April 2008 - Commissioning (Page 26) Engineered Systems - April 2008 - Commissioning (Page 27) Engineered Systems - April 2008 - Building Automation (Page 28) Engineered Systems - April 2008 - Building Automation (Page 29) Engineered Systems - April 2008 - Energy Wiz (Page 30) Engineered Systems - April 2008 - Energy Wiz (Page 31) Engineered Systems - April 2008 - HVACR Designer Tips (Page 32) Engineered Systems - April 2008 - HVACR Designer Tips (Page 33) Engineered Systems - April 2008 - This Time, Water Cooled Was All Wet (Page 34) Engineered Systems - April 2008 - This Time, Water Cooled Was All Wet (Page 35) Engineered Systems - April 2008 - This Time, Water Cooled Was All Wet (Page 36) Engineered Systems - April 2008 - This Time, Water Cooled Was All Wet (Page 37) Engineered Systems - April 2008 - This Time, Water Cooled Was All Wet (Page 38) Engineered Systems - April 2008 - This Time, Water Cooled Was All Wet (Page 39) Engineered Systems - April 2008 - This Time, Water Cooled Was All Wet (Page 40) Engineered Systems - April 2008 - This Time, Water Cooled Was All Wet (Page 41) Engineered Systems - April 2008 - This Time, Water Cooled Was All Wet (Page 42) Engineered Systems - April 2008 - Cleanroom Design In 10 Easy Steps (Page 43) Engineered Systems - April 2008 - Cleanroom Design In 10 Easy Steps (Page 44) Engineered Systems - April 2008 - Cleanroom Design In 10 Easy Steps (Page 45) Engineered Systems - April 2008 - Cleanroom Design In 10 Easy Steps (Page 46) Engineered Systems - April 2008 - Cleanroom Design In 10 Easy Steps (Page 47) Engineered Systems - April 2008 - Cleanroom Design In 10 Easy Steps (Page 48) Engineered Systems - April 2008 - Cleanroom Design In 10 Easy Steps (Page 49) Engineered Systems - April 2008 - Cleanroom Design In 10 Easy Steps (Page 50) Engineered Systems - April 2008 - Cleanroom Design In 10 Easy Steps (Page 51) Engineered Systems - April 2008 - Cleanroom Design In 10 Easy Steps (Page 52) Engineered Systems - April 2008 - Cleanroom Design In 10 Easy Steps (Page 53) Engineered Systems - April 2008 - Cleanroom Design In 10 Easy Steps (Page 54) Engineered Systems - April 2008 - Cleanroom Design In 10 Easy Steps (Page 55) Engineered Systems - April 2008 - It's Not The Heat, It's The Humidity (Page 56) Engineered Systems - April 2008 - It's Not The Heat, It's The Humidity (Page 57) Engineered Systems - April 2008 - It's Not The Heat, It's The Humidity (Page 58) Engineered Systems - April 2008 - It's Not The Heat, It's The Humidity (Page 59) Engineered Systems - April 2008 - It's Not The Heat, It's The Humidity (Page 60) Engineered Systems - April 2008 - It's Not The Heat, It's The Humidity (Page 61) Engineered Systems - April 2008 - It's Not The Heat, It's The Humidity (Page 62) Engineered Systems - April 2008 - It's Not The Heat, It's The Humidity (Page 63) Engineered Systems - April 2008 - Issues & Events (Page 64) Engineered Systems - April 2008 - Issues & Events (Page 65) Engineered Systems - April 2008 - Issues & Events (Page 66) Engineered Systems - April 2008 - Issues & Events (Page 67) Engineered Systems - April 2008 - Issues & Events (Page 68) Engineered Systems - April 2008 - Computers and Software (Page 69) Engineered Systems - April 2008 - Products (Page 70) Engineered Systems - April 2008 - Products (Page 71) Engineered Systems - April 2008 - Products (Page 72) Engineered Systems - April 2008 - Glossary (Page 73) Engineered Systems - April 2008 - Classifieds (Page 74) Engineered Systems - April 2008 - Classifieds (Page 75) Engineered Systems - April 2008 - Classifieds (Page 76) Engineered Systems - April 2008 - Advertiser Index (Page 77) Engineered Systems - April 2008 - Tomorrow’s Engineer (Page 78) Engineered Systems - April 2008 - Tomorrow’s Engineer (Page 79) Engineered Systems - April 2008 - Tomorrow’s Engineer (Page 80)
For optimal viewing of this digital publication, please enable JavaScript and then refresh the page. If you would like to try to load the digital publication without using Flash Player detection, please click here.