Engineered Systems - April 2008 - (Page 20) When it has to be stainless, it has to be A-J! The experts in stainless steel clean air systems for CaseInPoint VAV diffusers critical to green agency’s Platinum building For over 30 years, StopWaste.org has been helping Alameda County, CA, residents and businesses adopt sustainable consumption and disposal habits. Therefore, there was no question that the 14,000sq-ft, two-story Oakland, CA, building that it purchased and renovated for its offices had to be green. The question was how green. Using the USGBC’s LEED® Green Building Rating System, the initial goal was a LEED Silver rating. As the project progressed, however, StopWaste.org decided to aim for the highest possible rating, LEED Platinum. An important part of achieving this goal was earning all of the possible LEED credits for optimizing energy performance. GOING FOR ALL 10 To achieve the 10 energy performance points, StopWaste.org asked Rumsey Engineers, an Oakland-based firm with extensive experience designing low energy building systems, to make the building and its HVAC systems far more efficient than a standard building — using at least 40% less energy than a standard building built to meet the stringent state Title 24 energy code. Energy modeling was an important design tool used to optimize the building’s energy performance. Maximizing the mechanical system efficiency required close coordination with the building architects, Komorous-Towey Architects, and StopWaste.org. Modeling showed that combining increased wall insulation levels with highperformance windows allowed for both large system control zones and also eliminated the need for a perimeter heating system. The investment in the envelope allowed the design team to completely eliminate reheat; this yielded significant construction cost and energy savings. The building was divided into four master zones: perimeter and core offices on the second floor, plus perimeter offices and a large boardroom on the first floor. The three office master zones are conditioned using a high-efficiency packaged DX and gas heat rooftop AHU with a variable-speed fan. The master zones are subzoned with 29 Acutherm model ST-HC and two model TK-HC Therma-Fuser thermally powered VAV diffusers. operating rooms plus: • Custom fabrication • Rush deliveries A-J Manufacturing offers a complete line of custom and standard stainless steel air distribution products, all designed and manufactured to offer durable, dependable and low maintenance performance necessary for hospitals, labs, wash down areas and more. What’s more, with our state-of-the-art manufacturing capabilities, we can also offer you the industry’s shortest lead times for custom orders. So for continuous linear, security grilles, modular diffusers and much more, contact A-J Manufacturing today! A-J Manufacturing 800-247-5746 • www.ajmfg.com FREE INFO: 13 As part of the quest for a LEED® Platinum certification at this public agency building, Rumsey Engineers was challenged to earn all 10 LEED energy credits on a small budget. A simple system utilizing operable windows, an optimized shell, and diffusers met the challenge. FREE INFO: 49 20 En gi neer ed S y stem s April 2008 http://StopWaste.org http://StopWaste.org http://StopWaste.org http://www.ajmfg.com http://StopWaste.org
Table of Contents Feed for the Digital Edition of Engineered Systems - April 2008 Engineered Systems - April 2008 Contents Editor’s Note Back2Basics HVAC Challenge Case In Point Commissioning Building Automation Energy Wiz HVACR Designer Tips This Time, Water Cooled Was All Wet Cleanroom Design In 10 Easy Steps It's Not The Heat, It's The Humidity Issues & Events Computers and Software Products Glossary Classifieds Advertiser Index Tomorrow’s Engineer Engineered Systems - April 2008 Engineered Systems - April 2008 - (Page Intro) Engineered Systems - April 2008 - Engineered Systems - April 2008 (Page 1) Engineered Systems - April 2008 - Engineered Systems - April 2008 (Page 2) Engineered Systems - April 2008 - Engineered Systems - April 2008 (Page 3) Engineered Systems - April 2008 - Contents (Page 4) Engineered Systems - April 2008 - Contents (Page 5) Engineered Systems - April 2008 - Contents (Page 6) Engineered Systems - April 2008 - Contents (Page 7) Engineered Systems - April 2008 - Editor’s Note (Page 8) Engineered Systems - April 2008 - Editor’s Note (Page 9) Engineered Systems - April 2008 - Back2Basics (Page 10) Engineered Systems - April 2008 - Back2Basics (Page 11) Engineered Systems - April 2008 - HVAC Challenge (Page 12) Engineered Systems - April 2008 - HVAC Challenge (Page 13) Engineered Systems - April 2008 - Case In Point (Page 14) Engineered Systems - April 2008 - Case In Point (Page 15) Engineered Systems - April 2008 - Case In Point (Page 16) Engineered Systems - April 2008 - Case In Point (Page 17) Engineered Systems - April 2008 - Case In Point (Page 18) Engineered Systems - April 2008 - Case In Point (Page 19) Engineered Systems - April 2008 - Case In Point (Page 20) Engineered Systems - April 2008 - Case In Point (Page 21) Engineered Systems - April 2008 - Case In Point (Page 22) Engineered Systems - April 2008 - Case In Point (Page 23) Engineered Systems - April 2008 - Case In Point (Page 24) Engineered Systems - April 2008 - Case In Point (Page 25) Engineered Systems - April 2008 - Commissioning (Page 26) Engineered Systems - April 2008 - Commissioning (Page 27) Engineered Systems - April 2008 - Building Automation (Page 28) Engineered Systems - April 2008 - Building Automation (Page 29) Engineered Systems - April 2008 - Energy Wiz (Page 30) Engineered Systems - April 2008 - Energy Wiz (Page 31) Engineered Systems - April 2008 - HVACR Designer Tips (Page 32) Engineered Systems - April 2008 - HVACR Designer Tips (Page 33) Engineered Systems - April 2008 - This Time, Water Cooled Was All Wet (Page 34) Engineered Systems - April 2008 - This Time, Water Cooled Was All Wet (Page 35) Engineered Systems - April 2008 - This Time, Water Cooled Was All Wet (Page 36) Engineered Systems - April 2008 - This Time, Water Cooled Was All Wet (Page 37) Engineered Systems - April 2008 - This Time, Water Cooled Was All Wet (Page 38) Engineered Systems - April 2008 - This Time, Water Cooled Was All Wet (Page 39) Engineered Systems - April 2008 - This Time, Water Cooled Was All Wet (Page 40) Engineered Systems - April 2008 - This Time, Water Cooled Was All Wet (Page 41) Engineered Systems - April 2008 - This Time, Water Cooled Was All Wet (Page 42) Engineered Systems - April 2008 - Cleanroom Design In 10 Easy Steps (Page 43) Engineered Systems - April 2008 - Cleanroom Design In 10 Easy Steps (Page 44) Engineered Systems - April 2008 - Cleanroom Design In 10 Easy Steps (Page 45) Engineered Systems - April 2008 - Cleanroom Design In 10 Easy Steps (Page 46) Engineered Systems - April 2008 - Cleanroom Design In 10 Easy Steps (Page 47) Engineered Systems - April 2008 - Cleanroom Design In 10 Easy Steps (Page 48) Engineered Systems - April 2008 - Cleanroom Design In 10 Easy Steps (Page 49) Engineered Systems - April 2008 - Cleanroom Design In 10 Easy Steps (Page 50) Engineered Systems - April 2008 - Cleanroom Design In 10 Easy Steps (Page 51) Engineered Systems - April 2008 - Cleanroom Design In 10 Easy Steps (Page 52) Engineered Systems - April 2008 - Cleanroom Design In 10 Easy Steps (Page 53) Engineered Systems - April 2008 - Cleanroom Design In 10 Easy Steps (Page 54) Engineered Systems - April 2008 - Cleanroom Design In 10 Easy Steps (Page 55) Engineered Systems - April 2008 - It's Not The Heat, It's The Humidity (Page 56) Engineered Systems - April 2008 - It's Not The Heat, It's The Humidity (Page 57) Engineered Systems - April 2008 - It's Not The Heat, It's The Humidity (Page 58) Engineered Systems - April 2008 - It's Not The Heat, It's The Humidity (Page 59) Engineered Systems - April 2008 - It's Not The Heat, It's The Humidity (Page 60) Engineered Systems - April 2008 - It's Not The Heat, It's The Humidity (Page 61) Engineered Systems - April 2008 - It's Not The Heat, It's The Humidity (Page 62) Engineered Systems - April 2008 - It's Not The Heat, It's The Humidity (Page 63) Engineered Systems - April 2008 - Issues & Events (Page 64) Engineered Systems - April 2008 - Issues & Events (Page 65) Engineered Systems - April 2008 - Issues & Events (Page 66) Engineered Systems - April 2008 - Issues & Events (Page 67) Engineered Systems - April 2008 - Issues & Events (Page 68) Engineered Systems - April 2008 - Computers and Software (Page 69) Engineered Systems - April 2008 - Products (Page 70) Engineered Systems - April 2008 - Products (Page 71) Engineered Systems - April 2008 - Products (Page 72) Engineered Systems - April 2008 - Glossary (Page 73) Engineered Systems - April 2008 - Classifieds (Page 74) Engineered Systems - April 2008 - Classifieds (Page 75) Engineered Systems - April 2008 - Classifieds (Page 76) Engineered Systems - April 2008 - Advertiser Index (Page 77) Engineered Systems - April 2008 - Tomorrow’s Engineer (Page 78) Engineered Systems - April 2008 - Tomorrow’s Engineer (Page 79) Engineered Systems - April 2008 - Tomorrow’s Engineer (Page 80)
For optimal viewing of this digital publication, please enable JavaScript and then refresh the page. If you would like to try to load the digital publication without using Flash Player detection, please click here.