Engineered Systems - April 2008 - (Page 22) CaseInPoint “StopWaste org received “StopWaste.org received a total total project score project score of 54, and all 54 and all 10 credits for optimizing energy credits for optimizing ener redi ptimizin ergy performance. Software energy performance. Software energy modeling sh modeling shows that the building hows th hat the building ildi out outperforms Title 24-2005, tperf forms itle 24 2005 l 5, Californi California’s stringent energy lif ia’ st ge t g code by 47%.” de, 47% ” Therma-Fuser diffusers were selected in order to gain energy savings, and to meet budget concerns. Rumsey Engineers’ detailed energy models calculated that these systems use less energy than a standard VAV box-based system. UNDER CONTROL Controls were kept as simple as possible to minimize project costs and to protect against efficiency decay — the inevitable misadjustments, overrides, and sensor drift — that increases the energy use of more complex control systems over time. The use of Therma-Fusers, combined with the elimination of reheat, through the use of high-efficiency windows, met the client’s demands for tight, zoned control and resulted in significant budget savings. Because of the high-efficiency goals, these savings were invested in high-efficiency package units with variable-speed fans and modulating gas valves in the heating sections. Natural ventilation from open windows is used in the building whenever possible to save heating and cooling energy. Outdoor conditions are continually monitored with green or red LEDs, notifying occupants when the mechanical cooling is off and the outdoor conditions are optimum for opening windows. Allowing occupants to control the windows reduces the amount of controls hardware required and provides another degree of individual control. At night, based on the time and outdoor air temperature, the system operates at a reduced air volume to precool the building mass, providing a significant flywheel effect in the mild California climate. This night purge operation is controlled in a manner similar to an economizer cycle, which is also enabled after hours. A comparison of indoor and outdoor temperatures detects the times in summer when night purge is not optimal. Four sensors monitor CO2 levels; this indirectly detects the number of people in the building and increases or reduces the amount of outside air. The CO2 sensors do not alter the amount of air delivered, but rather the percentage of outdoor air included in the delivered air. Therma-Fuser diffusers control airflow volume via fan pressure control, while the CO2 sensors actuate outside air dampers. While commissioning is a prerequisite of a LEED certified building, the owner elected to have enhanced commissioning performed, gaining another LEED point. How do I make my building green? We all want to make our existing buildings a greener place. Commissioning a building with our precise tools allow you to assess and improve building HVAC efficiency and minimize environmental impact. That means less wasted energy and more green in your pocket. By going green, you can make a difference. TSI: making the world greener— one building at a time. We offer the 9555 VelociCalc Multi-Function Ventilation Meter ® tools to help you meet your green goals. To learn more, visit www.tsi.com/GREEN. Tel: 800 874 2811 E-mail: info@tsi.com FREE INFO: 116 22 En gi neer ed S y stem s April 2008 http://www.tsi.com/GREEN http://www.tsi.com/GREEN
Table of Contents Feed for the Digital Edition of Engineered Systems - April 2008 Engineered Systems - April 2008 Contents Editor’s Note Back2Basics HVAC Challenge Case In Point Commissioning Building Automation Energy Wiz HVACR Designer Tips This Time, Water Cooled Was All Wet Cleanroom Design In 10 Easy Steps It's Not The Heat, It's The Humidity Issues & Events Computers and Software Products Glossary Classifieds Advertiser Index Tomorrow’s Engineer Engineered Systems - April 2008 Engineered Systems - April 2008 - (Page Intro) Engineered Systems - April 2008 - Engineered Systems - April 2008 (Page 1) Engineered Systems - April 2008 - Engineered Systems - April 2008 (Page 2) Engineered Systems - April 2008 - Engineered Systems - April 2008 (Page 3) Engineered Systems - April 2008 - Contents (Page 4) Engineered Systems - April 2008 - Contents (Page 5) Engineered Systems - April 2008 - Contents (Page 6) Engineered Systems - April 2008 - Contents (Page 7) Engineered Systems - April 2008 - Editor’s Note (Page 8) Engineered Systems - April 2008 - Editor’s Note (Page 9) Engineered Systems - April 2008 - Back2Basics (Page 10) Engineered Systems - April 2008 - Back2Basics (Page 11) Engineered Systems - April 2008 - HVAC Challenge (Page 12) Engineered Systems - April 2008 - HVAC Challenge (Page 13) Engineered Systems - April 2008 - Case In Point (Page 14) Engineered Systems - April 2008 - Case In Point (Page 15) Engineered Systems - April 2008 - Case In Point (Page 16) Engineered Systems - April 2008 - Case In Point (Page 17) Engineered Systems - April 2008 - Case In Point (Page 18) Engineered Systems - April 2008 - Case In Point (Page 19) Engineered Systems - April 2008 - Case In Point (Page 20) Engineered Systems - April 2008 - Case In Point (Page 21) Engineered Systems - April 2008 - Case In Point (Page 22) Engineered Systems - April 2008 - Case In Point (Page 23) Engineered Systems - April 2008 - Case In Point (Page 24) Engineered Systems - April 2008 - Case In Point (Page 25) Engineered Systems - April 2008 - Commissioning (Page 26) Engineered Systems - April 2008 - Commissioning (Page 27) Engineered Systems - April 2008 - Building Automation (Page 28) Engineered Systems - April 2008 - Building Automation (Page 29) Engineered Systems - April 2008 - Energy Wiz (Page 30) Engineered Systems - April 2008 - Energy Wiz (Page 31) Engineered Systems - April 2008 - HVACR Designer Tips (Page 32) Engineered Systems - April 2008 - HVACR Designer Tips (Page 33) Engineered Systems - April 2008 - This Time, Water Cooled Was All Wet (Page 34) Engineered Systems - April 2008 - This Time, Water Cooled Was All Wet (Page 35) Engineered Systems - April 2008 - This Time, Water Cooled Was All Wet (Page 36) Engineered Systems - April 2008 - This Time, Water Cooled Was All Wet (Page 37) Engineered Systems - April 2008 - This Time, Water Cooled Was All Wet (Page 38) Engineered Systems - April 2008 - This Time, Water Cooled Was All Wet (Page 39) Engineered Systems - April 2008 - This Time, Water Cooled Was All Wet (Page 40) Engineered Systems - April 2008 - This Time, Water Cooled Was All Wet (Page 41) Engineered Systems - April 2008 - This Time, Water Cooled Was All Wet (Page 42) Engineered Systems - April 2008 - Cleanroom Design In 10 Easy Steps (Page 43) Engineered Systems - April 2008 - Cleanroom Design In 10 Easy Steps (Page 44) Engineered Systems - April 2008 - Cleanroom Design In 10 Easy Steps (Page 45) Engineered Systems - April 2008 - Cleanroom Design In 10 Easy Steps (Page 46) Engineered Systems - April 2008 - Cleanroom Design In 10 Easy Steps (Page 47) Engineered Systems - April 2008 - Cleanroom Design In 10 Easy Steps (Page 48) Engineered Systems - April 2008 - Cleanroom Design In 10 Easy Steps (Page 49) Engineered Systems - April 2008 - Cleanroom Design In 10 Easy Steps (Page 50) Engineered Systems - April 2008 - Cleanroom Design In 10 Easy Steps (Page 51) Engineered Systems - April 2008 - Cleanroom Design In 10 Easy Steps (Page 52) Engineered Systems - April 2008 - Cleanroom Design In 10 Easy Steps (Page 53) Engineered Systems - April 2008 - Cleanroom Design In 10 Easy Steps (Page 54) Engineered Systems - April 2008 - Cleanroom Design In 10 Easy Steps (Page 55) Engineered Systems - April 2008 - It's Not The Heat, It's The Humidity (Page 56) Engineered Systems - April 2008 - It's Not The Heat, It's The Humidity (Page 57) Engineered Systems - April 2008 - It's Not The Heat, It's The Humidity (Page 58) Engineered Systems - April 2008 - It's Not The Heat, It's The Humidity (Page 59) Engineered Systems - April 2008 - It's Not The Heat, It's The Humidity (Page 60) Engineered Systems - April 2008 - It's Not The Heat, It's The Humidity (Page 61) Engineered Systems - April 2008 - It's Not The Heat, It's The Humidity (Page 62) Engineered Systems - April 2008 - It's Not The Heat, It's The Humidity (Page 63) Engineered Systems - April 2008 - Issues & Events (Page 64) Engineered Systems - April 2008 - Issues & Events (Page 65) Engineered Systems - April 2008 - Issues & Events (Page 66) Engineered Systems - April 2008 - Issues & Events (Page 67) Engineered Systems - April 2008 - Issues & Events (Page 68) Engineered Systems - April 2008 - Computers and Software (Page 69) Engineered Systems - April 2008 - Products (Page 70) Engineered Systems - April 2008 - Products (Page 71) Engineered Systems - April 2008 - Products (Page 72) Engineered Systems - April 2008 - Glossary (Page 73) Engineered Systems - April 2008 - Classifieds (Page 74) Engineered Systems - April 2008 - Classifieds (Page 75) Engineered Systems - April 2008 - Classifieds (Page 76) Engineered Systems - April 2008 - Advertiser Index (Page 77) Engineered Systems - April 2008 - Tomorrow’s Engineer (Page 78) Engineered Systems - April 2008 - Tomorrow’s Engineer (Page 79) Engineered Systems - April 2008 - Tomorrow’s Engineer (Page 80)
For optimal viewing of this digital publication, please enable JavaScript and then refresh the page. If you would like to try to load the digital publication without using Flash Player detection, please click here.