Engineered Systems - April 2008 - (Page 66) Issues&Events D U C T E D TO ADJOINING ROOM Engineering Beat Newcomb & Boyd announced the licensure of three of its mechanical engineers. Kristina L. Taylor, P.E., has become a licensed professional engineer and a LEED® Accredited Professional (AP); Kasey P. Mitchell, P.E., an associate of the firm, has also become a licensed professional engineer; and Kidane H. Abebe, E.I.T., is now licensed in the state of Alabama. ington, DC, North Carolina, Washington, and Wisconsin. Smith Seckman Reid, Inc. hired Mike Mooney, P.E. as senior mechanical engineer in the firm’s Denver office. ACC E S S PA N E L RETURN AIR GRILLE Syska Hennessy Group, Inc. announced the appointment of Gary Brennen and Cyrus Izzo as co-chief executive officers and co-chief operating officers. A simply better way to heat/ cool multiple rooms. SIMPLE TO INSTALL Compact, single package units weigh as little as 125 lbs. and install front, left or right hand into small mechanical closet. SIMPLE TO MAINTAIN Electronic control panel on unit for easy diagnostics and servicing. Safety power disconnect. All servicing is performed indoors. SSOE continued its expansion announcing two new hires for the company’s headquarters in Toledo, OH: Matthew Oberts as mechanical department manager and Timothy Lajiness, P.E., as senior project manager. Alberici Constructors’ General Building Division announced that James G. Klingensmith, P.E., LAP, CCM, has joined the company as a new project director. Albert Kahn Associates, Inc. has been commissioned to serve as A/E of Record for construction of a new 2-millionsq-ft freight car manufacturing complex for National Industries, in Shoals, AL. Flack + Kurtz acquired SEi Companies, a mechanical and electrical consulting engineering firm with 150 employees. RDK Engineers Affiliated Engineers, Inc. announced the opening of a new office in Houston, complementing its practices in Arizona, California, Florida, Illinois, Washannounced that Matt Stelmach, P.E. and Scott Henriques, P.E., have joined the company’s team of senior engineering project managers. well as the annual convention for the International Association of Plumbing and Mechanical Officials (IAPMO), and the Maple Leaf Reception produced by the Canadian Institute of Plumbing and Heating (CIPH). ISH NA will be held October 1-3, 2008 at the Georgia World Congress Center in Atlanta, GA. DIGITAL T-STAT ASHRAE Webcast to focus on integrated building design “Integrated Building Design: Bringing the Pieces Together to Unleash the Power of Teamwork,” will be presented by ASHRAE on April 16, 1-4 p.m. EDT. This Webcast/ satellite broadcast will explain what members of the building team must do to advance highperformance buildings with improved design, construction, and operations processes. Buildings that meet the needs of occupants and truly achieve sustainability objectives can only be created if the building community shares its knowledge and experiences, and this virtual event is designed to 9,500 to 24,000 BTU/h Ductable to multiple rooms Insulated cabinets for quiet operation 100% run tested prior to shipment Custom color architectural louvers facilitate this sharing. The panel of presenters includes Walter Grondzik, architectural engineer and professor in the Department of Architecture, Ball State University; Charles E. Gulledge III, P.E., MAI, CSI, ASHRAE distinguished lecturer, senior mechanical engineer, AC Corporation, Greensboro, NC; Drury B. Crawley, technology development manager, DOE, Washington; and Paul Torcellini, team leader for commercial buildings research, National Renewal Energy Laboratory, Golden, CO; with Don Rheem serving as the moderator. Kent Peterson, ASHRAE’s 2007-2008 president, will introduce the broadcast program. The presentation segments will be titled: · “What is Integrated Building Design?” · “The Integrated Design Process” · “Achieving Net-Zero Energy Buildings Through Integrated Building Design?” · “Bringing the Pieces Together – Actual Applications” ASHRAE’s Chapter Technology Transfer Committee is sponsoring this free program. Three professional development hours or For more information call 1-866-418-6722 or go online www.friedrich.com FREE INFO: 204 66 En gi neer ed S y stem s April 2008 http://www.friedrich.com
Table of Contents Feed for the Digital Edition of Engineered Systems - April 2008 Engineered Systems - April 2008 Contents Editor’s Note Back2Basics HVAC Challenge Case In Point Commissioning Building Automation Energy Wiz HVACR Designer Tips This Time, Water Cooled Was All Wet Cleanroom Design In 10 Easy Steps It's Not The Heat, It's The Humidity Issues & Events Computers and Software Products Glossary Classifieds Advertiser Index Tomorrow’s Engineer Engineered Systems - April 2008 Engineered Systems - April 2008 - (Page Intro) Engineered Systems - April 2008 - Engineered Systems - April 2008 (Page 1) Engineered Systems - April 2008 - Engineered Systems - April 2008 (Page 2) Engineered Systems - April 2008 - Engineered Systems - April 2008 (Page 3) Engineered Systems - April 2008 - Contents (Page 4) Engineered Systems - April 2008 - Contents (Page 5) Engineered Systems - April 2008 - Contents (Page 6) Engineered Systems - April 2008 - Contents (Page 7) Engineered Systems - April 2008 - Editor’s Note (Page 8) Engineered Systems - April 2008 - Editor’s Note (Page 9) Engineered Systems - April 2008 - Back2Basics (Page 10) Engineered Systems - April 2008 - Back2Basics (Page 11) Engineered Systems - April 2008 - HVAC Challenge (Page 12) Engineered Systems - April 2008 - HVAC Challenge (Page 13) Engineered Systems - April 2008 - Case In Point (Page 14) Engineered Systems - April 2008 - Case In Point (Page 15) Engineered Systems - April 2008 - Case In Point (Page 16) Engineered Systems - April 2008 - Case In Point (Page 17) Engineered Systems - April 2008 - Case In Point (Page 18) Engineered Systems - April 2008 - Case In Point (Page 19) Engineered Systems - April 2008 - Case In Point (Page 20) Engineered Systems - April 2008 - Case In Point (Page 21) Engineered Systems - April 2008 - Case In Point (Page 22) Engineered Systems - April 2008 - Case In Point (Page 23) Engineered Systems - April 2008 - Case In Point (Page 24) Engineered Systems - April 2008 - Case In Point (Page 25) Engineered Systems - April 2008 - Commissioning (Page 26) Engineered Systems - April 2008 - Commissioning (Page 27) Engineered Systems - April 2008 - Building Automation (Page 28) Engineered Systems - April 2008 - Building Automation (Page 29) Engineered Systems - April 2008 - Energy Wiz (Page 30) Engineered Systems - April 2008 - Energy Wiz (Page 31) Engineered Systems - April 2008 - HVACR Designer Tips (Page 32) Engineered Systems - April 2008 - HVACR Designer Tips (Page 33) Engineered Systems - April 2008 - This Time, Water Cooled Was All Wet (Page 34) Engineered Systems - April 2008 - This Time, Water Cooled Was All Wet (Page 35) Engineered Systems - April 2008 - This Time, Water Cooled Was All Wet (Page 36) Engineered Systems - April 2008 - This Time, Water Cooled Was All Wet (Page 37) Engineered Systems - April 2008 - This Time, Water Cooled Was All Wet (Page 38) Engineered Systems - April 2008 - This Time, Water Cooled Was All Wet (Page 39) Engineered Systems - April 2008 - This Time, Water Cooled Was All Wet (Page 40) Engineered Systems - April 2008 - This Time, Water Cooled Was All Wet (Page 41) Engineered Systems - April 2008 - This Time, Water Cooled Was All Wet (Page 42) Engineered Systems - April 2008 - Cleanroom Design In 10 Easy Steps (Page 43) Engineered Systems - April 2008 - Cleanroom Design In 10 Easy Steps (Page 44) Engineered Systems - April 2008 - Cleanroom Design In 10 Easy Steps (Page 45) Engineered Systems - April 2008 - Cleanroom Design In 10 Easy Steps (Page 46) Engineered Systems - April 2008 - Cleanroom Design In 10 Easy Steps (Page 47) Engineered Systems - April 2008 - Cleanroom Design In 10 Easy Steps (Page 48) Engineered Systems - April 2008 - Cleanroom Design In 10 Easy Steps (Page 49) Engineered Systems - April 2008 - Cleanroom Design In 10 Easy Steps (Page 50) Engineered Systems - April 2008 - Cleanroom Design In 10 Easy Steps (Page 51) Engineered Systems - April 2008 - Cleanroom Design In 10 Easy Steps (Page 52) Engineered Systems - April 2008 - Cleanroom Design In 10 Easy Steps (Page 53) Engineered Systems - April 2008 - Cleanroom Design In 10 Easy Steps (Page 54) Engineered Systems - April 2008 - Cleanroom Design In 10 Easy Steps (Page 55) Engineered Systems - April 2008 - It's Not The Heat, It's The Humidity (Page 56) Engineered Systems - April 2008 - It's Not The Heat, It's The Humidity (Page 57) Engineered Systems - April 2008 - It's Not The Heat, It's The Humidity (Page 58) Engineered Systems - April 2008 - It's Not The Heat, It's The Humidity (Page 59) Engineered Systems - April 2008 - It's Not The Heat, It's The Humidity (Page 60) Engineered Systems - April 2008 - It's Not The Heat, It's The Humidity (Page 61) Engineered Systems - April 2008 - It's Not The Heat, It's The Humidity (Page 62) Engineered Systems - April 2008 - It's Not The Heat, It's The Humidity (Page 63) Engineered Systems - April 2008 - Issues & Events (Page 64) Engineered Systems - April 2008 - Issues & Events (Page 65) Engineered Systems - April 2008 - Issues & Events (Page 66) Engineered Systems - April 2008 - Issues & Events (Page 67) Engineered Systems - April 2008 - Issues & Events (Page 68) Engineered Systems - April 2008 - Computers and Software (Page 69) Engineered Systems - April 2008 - Products (Page 70) Engineered Systems - April 2008 - Products (Page 71) Engineered Systems - April 2008 - Products (Page 72) Engineered Systems - April 2008 - Glossary (Page 73) Engineered Systems - April 2008 - Classifieds (Page 74) Engineered Systems - April 2008 - Classifieds (Page 75) Engineered Systems - April 2008 - Classifieds (Page 76) Engineered Systems - April 2008 - Advertiser Index (Page 77) Engineered Systems - April 2008 - Tomorrow’s Engineer (Page 78) Engineered Systems - April 2008 - Tomorrow’s Engineer (Page 79) Engineered Systems - April 2008 - Tomorrow’s Engineer (Page 80)
For optimal viewing of this digital publication, please enable JavaScript and then refresh the page. If you would like to try to load the digital publication without using Flash Player detection, please click here.