Engineered Systems - June 2008 - (Page 17) Maverick IP Sensor Appliance • Embedded lean TCP-IP stack - HTTP, SMTP, DHCP, DNS, FTP, and ARP • 2048 samples data logging on each input with programmable interval from 1 sec. to 99 hours • Data logged in CSV files and can be imported into Note pad, Excel, Word, or any other application which accepts comma separated files • Logged data can also be viewed as a graph with adjustable X & Y scales • Embedded XML formatted input & output data • Lowest cost HTML & XML node for enterprise systems • Programmable email alerts on all inputs to two email addresses • Option to attach logged data CSV file to the email alert • Power cycle email alert • DHCP IP change email alert • Real time clock with SuperCap 10-day power back up • Browser initiated remote manual control on all outputs • Time-of-day based output control • Sensor input based setpoint control with adjustable deadband • Two versions: 8 inputs or 4 inputs & 4 relay outputs • Digital, 0-5/0-10 Vdc or 4-20 mA inputs • Output relays rated @ 5 Amp 250 VAC • Coming Soon: July ‘08: Sub Metering Appliance - Metering Maverick accumulates pulses from electric, gas, water or steam meters and displays hourly, daily, monthly accumulated totals. Sends email alerts if demand or consumption exceeds threshold. August ‘08: Environmental Appliance - IP programmable thermostat with humidity control for light commercial or residential applications. September '08: Home / Light Commercial Automation Appliance Programmable Thermostat, with humidity, ERV and zone control with auxiliary I/O for lawn sprinklers, outside light control and compliance monitoring for ventilation. October '08: AHU Automation Appliance - Single stage rooftop or heat pump appliance with programmable thermostat, humidity, dry bulb or enthalpy economizer control and ventilation compliance monitoring. December '08: AHU Multistage Automation Appliance - Two stage heat and cool, humidity, dry bulb or enthalpy economizer, programmable thermostat, zone control and auxiliary I/O with setpoint or PID control. MSRP US$ 295.00 & 345.00 each ® MAMAC SYSTEMS Input 162 at www.esmagazine.com/instantproductinfo 7400 Flying Cloud Drive • Minneapolis, MN 55344-3720 • USA 800-843-5116 • 952-835-1626 • Fax 952-829-5331 sales@mamacsys.com • www.mamacsys.com http://www.mamacsys.com http://www.mamacsys.com http://www.esmagazine.com/instantproductinfo
Table of Contents Feed for the Digital Edition of Engineered Systems - June 2008 Engineered Systems - June 2008 Contents Editor’s Note Letters To The Editor Back2Basics HVAC Challenge Case In Point Commissioning Efficiency Incentives HydroTech Building Automation Energy Wiz HVACR Designer Tips Notre Dame Tackles the Heat State Of The Arts Time For A Transplant? Project Delivery: What Can IPD Do For You? Issues & Events Computers & Software Products Application Checklist Glossary Classifieds Advertiser Index Tomorrow’s Engineer Engineered Systems - June 2008 Engineered Systems - June 2008 - (Page Intro) Engineered Systems - June 2008 - Engineered Systems - June 2008 (Page Cover1) Engineered Systems - June 2008 - Engineered Systems - June 2008 (Page Cover2) Engineered Systems - June 2008 - Engineered Systems - June 2008 (Page 3) Engineered Systems - June 2008 - Contents (Page 4) Engineered Systems - June 2008 - Contents (Page 5) Engineered Systems - June 2008 - Contents (Page 6) Engineered Systems - June 2008 - Contents (Page 7) Engineered Systems - June 2008 - Editor’s Note (Page 8) Engineered Systems - June 2008 - Editor’s Note (Page 9) Engineered Systems - June 2008 - Editor’s Note (Page 10) Engineered Systems - June 2008 - Letters To The Editor (Page 11) Engineered Systems - June 2008 - Letters To The Editor (Page 12) Engineered Systems - June 2008 - Letters To The Editor (Page 13) Engineered Systems - June 2008 - Back2Basics (Page 14) Engineered Systems - June 2008 - Back2Basics (Page 15) Engineered Systems - June 2008 - Back2Basics (Page 16) Engineered Systems - June 2008 - Back2Basics (Page 17) Engineered Systems - June 2008 - HVAC Challenge (Page 18) Engineered Systems - June 2008 - HVAC Challenge (Page 19) Engineered Systems - June 2008 - Case In Point (Page 20) Engineered Systems - June 2008 - Case In Point (Page 21) Engineered Systems - June 2008 - Case In Point (Page 22) Engineered Systems - June 2008 - Case In Point (Page 23) Engineered Systems - June 2008 - Case In Point (Page 24) Engineered Systems - June 2008 - Case In Point (Page 25) Engineered Systems - June 2008 - Case In Point (Page 26) Engineered Systems - June 2008 - Case In Point (Page 27) Engineered Systems - June 2008 - Case In Point (Page 28) Engineered Systems - June 2008 - Case In Point (Page 29) Engineered Systems - June 2008 - Case In Point (Page 30) Engineered Systems - June 2008 - Case In Point (Page 31) Engineered Systems - June 2008 - Commissioning (Page 32) Engineered Systems - June 2008 - Efficiency Incentives (Page 33) Engineered Systems - June 2008 - Efficiency Incentives (Page 34) Engineered Systems - June 2008 - Efficiency Incentives (Page 35) Engineered Systems - June 2008 - HydroTech (Page 36) Engineered Systems - June 2008 - HydroTech (Page 37) Engineered Systems - June 2008 - Building Automation (Page 38) Engineered Systems - June 2008 - Building Automation (Page 39) Engineered Systems - June 2008 - Energy Wiz (Page 40) Engineered Systems - June 2008 - Energy Wiz (Page 41) Engineered Systems - June 2008 - HVACR Designer Tips (Page 42) Engineered Systems - June 2008 - HVACR Designer Tips (Page 43) Engineered Systems - June 2008 - Notre Dame Tackles the Heat (Page 44) Engineered Systems - June 2008 - Notre Dame Tackles the Heat (Page 45) Engineered Systems - June 2008 - Notre Dame Tackles the Heat (Page 46) Engineered Systems - June 2008 - Notre Dame Tackles the Heat (Page 47) Engineered Systems - June 2008 - Notre Dame Tackles the Heat (Page 48) Engineered Systems - June 2008 - Notre Dame Tackles the Heat (Page 49) Engineered Systems - June 2008 - Notre Dame Tackles the Heat (Page 50) Engineered Systems - June 2008 - Notre Dame Tackles the Heat (Page 51) Engineered Systems - June 2008 - Notre Dame Tackles the Heat (Page 52) Engineered Systems - June 2008 - Notre Dame Tackles the Heat (Page 53) Engineered Systems - June 2008 - Notre Dame Tackles the Heat (Page 54) Engineered Systems - June 2008 - State Of The Arts (Page 55) Engineered Systems - June 2008 - State Of The Arts (Page 56) Engineered Systems - June 2008 - State Of The Arts (Page 57) Engineered Systems - June 2008 - State Of The Arts (Page 58) Engineered Systems - June 2008 - State Of The Arts (Page 59) Engineered Systems - June 2008 - Time For A Transplant? (Page 60) Engineered Systems - June 2008 - Time For A Transplant? (Page 61) Engineered Systems - June 2008 - Time For A Transplant? (Page 62) Engineered Systems - June 2008 - Time For A Transplant? (Page 63) Engineered Systems - June 2008 - Time For A Transplant? (Page 64) Engineered Systems - June 2008 - Time For A Transplant? (Page 65) Engineered Systems - June 2008 - Time For A Transplant? (Page 66) Engineered Systems - June 2008 - Project Delivery: What Can IPD Do For You? (Page 67) Engineered Systems - June 2008 - Project Delivery: What Can IPD Do For You? (Page 68) Engineered Systems - June 2008 - Project Delivery: What Can IPD Do For You? (Page 69) Engineered Systems - June 2008 - Project Delivery: What Can IPD Do For You? (Page 70) Engineered Systems - June 2008 - Project Delivery: What Can IPD Do For You? (Page 71) Engineered Systems - June 2008 - Issues & Events (Page 72) Engineered Systems - June 2008 - Issues & Events (Page 73) Engineered Systems - June 2008 - Issues & Events (Page 74) Engineered Systems - June 2008 - Issues & Events (Page 75) Engineered Systems - June 2008 - Issues & Events (Page 76) Engineered Systems - June 2008 - Issues & Events (Page 77) Engineered Systems - June 2008 - Computers & Software (Page 78) Engineered Systems - June 2008 - Products (Page 79) Engineered Systems - June 2008 - Application Checklist (Page 80) Engineered Systems - June 2008 - Glossary (Page 81) Engineered Systems - June 2008 - Classifieds (Page 82) Engineered Systems - June 2008 - Classifieds (Page 83) Engineered Systems - June 2008 - Classifieds (Page 84) Engineered Systems - June 2008 - Advertiser Index (Page 85) Engineered Systems - June 2008 - Tomorrow’s Engineer (Page 86) Engineered Systems - June 2008 - Tomorrow’s Engineer (Page Cover3) Engineered Systems - June 2008 - Tomorrow’s Engineer (Page Cover4)
For optimal viewing of this digital publication, please enable JavaScript and then refresh the page. If you would like to try to load the digital publication without using Flash Player detection, please click here.