Engineered Systems - June 2008 - (Page 42) HVACRDesignerTips BY AMANDA MCKEW COMMERCIAL AND PUBLIC BUILDINGS Commissioning and Project Closeout Checklist Equipment type: Rooftop units Equipment designation: RTU-1 Barcode designation: 11111 Area served: One-story office space Equipment location: Rooftop • Confirm LEED measuring and verification plan is programmed and trending. • Confirm 10-month warranty meeting to revisit site and discuss lessons-learned, etc. DOCUMENTATION TO BUILDING MANAGER BASIS OF DESIGN • Review and confirm design intent has been met. • Review and confirm control set points are within range of design criteria. • Review BAS computer trending to date. • Transfer final commissioning report, including: • BofD/DID • Commissioning plan/specification (for future building program use) • PFPT checklists • Observation checklists • Field reports • Continuous commissioning BAS computer process is in place (if applicable) • Scrubbed FPT narratives for future use • Meeting minutes • Project photograph log and associated photographs • Lessons-learned meeting minutes • Transfer CAD-layered record drawings • Transfer CAD-layered facility management drawings. • Transfer barcoded equipment, panel, and valve database. • Confirm equipment, panels, and valves are barcoded. • Post system flow diagram and TAB flow diagram. • Transfer barcode scanner. • Transfer Commissioning 1-2-3 electronic files. • Transfer CMMS with/or equipment database. • Transfer planned maintenance workorders. • Transfer service contract. • Transfer recommissioning manual. • Transfer ownership of laptop or tablet computer with Internet access and BAS computer for off-site monitoring. • Transfer recommended operating budget. ES SPECIFICATION REVIEW • Confirm Division 1 mechanical and electrical requirements (O&M manuals, record drawings, etc.) have been submitted. • Confirm Division 15 mechanical requirements have been met. • Confirm Division 16 electrical requirements have been met. • Confirm Division 17 building automation requirements have been met. DRAWING REVIEW • Confirm equipment complies with shop drawing submittal. • Confirm equipment and distribution complies with standard details. • Review trade contractor’s punchlist. • Review contractor startup sheets. • Review building automation points list checkout. • Complete site inspection punchlist. • Review water balancing report data-to-actual performance (pressure gauge readings, flow meter readings, etc.). • Review air balancing and temperature operating data (cfm/fan, discharge temperature/fan). BUILDING SYSTEM DEMONSTRATION • Commissioning engineer facilitates FPTs. • Spot-check system training during FPTs. • Spot-check O&M manuals during FPTs. • Confirm PM workorders are complete and ready to begin at time of certificate of occupancy. • Confirm BAS computer predictive maintenance monitoring and workorder initiation is complete and ready to begin at time of certificate of occupancy. • Maintain corrective action log and perform necessary re-testing. • Set and observe that deferred seasonal FPT has been completed. • Complete final commissioning report. ❍ Central Equipment ❍ Terminal Equipment & Space ✔ ❍ Project Closeout McKew is an HVAC commissioning engineer in the Building Solutions Group at RDK Engineers. If you have any comments, suggestions, or questions regarding this designer checklist, contact Amanda McKew at amckew@rdkengineers.com. This column is meant to provide some basic guidelines for good design. Always consult all necessary codes and resources relevant to each particular project. LEED® CERTIFICATION COMPLIANCE • Complete recommissioning manual. • Confirm system training completion and facility staff signoff on training class attendance. • Confirm LEED® energy optimization software and associated system simulation is programmed and trending. 42 En gi neer ed S y stem s June 2008
Table of Contents Feed for the Digital Edition of Engineered Systems - June 2008 Engineered Systems - June 2008 Contents Editor’s Note Letters To The Editor Back2Basics HVAC Challenge Case In Point Commissioning Efficiency Incentives HydroTech Building Automation Energy Wiz HVACR Designer Tips Notre Dame Tackles the Heat State Of The Arts Time For A Transplant? Project Delivery: What Can IPD Do For You? Issues & Events Computers & Software Products Application Checklist Glossary Classifieds Advertiser Index Tomorrow’s Engineer Engineered Systems - June 2008 Engineered Systems - June 2008 - (Page Intro) Engineered Systems - June 2008 - Engineered Systems - June 2008 (Page Cover1) Engineered Systems - June 2008 - Engineered Systems - June 2008 (Page Cover2) Engineered Systems - June 2008 - Engineered Systems - June 2008 (Page 3) Engineered Systems - June 2008 - Contents (Page 4) Engineered Systems - June 2008 - Contents (Page 5) Engineered Systems - June 2008 - Contents (Page 6) Engineered Systems - June 2008 - Contents (Page 7) Engineered Systems - June 2008 - Editor’s Note (Page 8) Engineered Systems - June 2008 - Editor’s Note (Page 9) Engineered Systems - June 2008 - Editor’s Note (Page 10) Engineered Systems - June 2008 - Letters To The Editor (Page 11) Engineered Systems - June 2008 - Letters To The Editor (Page 12) Engineered Systems - June 2008 - Letters To The Editor (Page 13) Engineered Systems - June 2008 - Back2Basics (Page 14) Engineered Systems - June 2008 - Back2Basics (Page 15) Engineered Systems - June 2008 - Back2Basics (Page 16) Engineered Systems - June 2008 - Back2Basics (Page 17) Engineered Systems - June 2008 - HVAC Challenge (Page 18) Engineered Systems - June 2008 - HVAC Challenge (Page 19) Engineered Systems - June 2008 - Case In Point (Page 20) Engineered Systems - June 2008 - Case In Point (Page 21) Engineered Systems - June 2008 - Case In Point (Page 22) Engineered Systems - June 2008 - Case In Point (Page 23) Engineered Systems - June 2008 - Case In Point (Page 24) Engineered Systems - June 2008 - Case In Point (Page 25) Engineered Systems - June 2008 - Case In Point (Page 26) Engineered Systems - June 2008 - Case In Point (Page 27) Engineered Systems - June 2008 - Case In Point (Page 28) Engineered Systems - June 2008 - Case In Point (Page 29) Engineered Systems - June 2008 - Case In Point (Page 30) Engineered Systems - June 2008 - Case In Point (Page 31) Engineered Systems - June 2008 - Commissioning (Page 32) Engineered Systems - June 2008 - Efficiency Incentives (Page 33) Engineered Systems - June 2008 - Efficiency Incentives (Page 34) Engineered Systems - June 2008 - Efficiency Incentives (Page 35) Engineered Systems - June 2008 - HydroTech (Page 36) Engineered Systems - June 2008 - HydroTech (Page 37) Engineered Systems - June 2008 - Building Automation (Page 38) Engineered Systems - June 2008 - Building Automation (Page 39) Engineered Systems - June 2008 - Energy Wiz (Page 40) Engineered Systems - June 2008 - Energy Wiz (Page 41) Engineered Systems - June 2008 - HVACR Designer Tips (Page 42) Engineered Systems - June 2008 - HVACR Designer Tips (Page 43) Engineered Systems - June 2008 - Notre Dame Tackles the Heat (Page 44) Engineered Systems - June 2008 - Notre Dame Tackles the Heat (Page 45) Engineered Systems - June 2008 - Notre Dame Tackles the Heat (Page 46) Engineered Systems - June 2008 - Notre Dame Tackles the Heat (Page 47) Engineered Systems - June 2008 - Notre Dame Tackles the Heat (Page 48) Engineered Systems - June 2008 - Notre Dame Tackles the Heat (Page 49) Engineered Systems - June 2008 - Notre Dame Tackles the Heat (Page 50) Engineered Systems - June 2008 - Notre Dame Tackles the Heat (Page 51) Engineered Systems - June 2008 - Notre Dame Tackles the Heat (Page 52) Engineered Systems - June 2008 - Notre Dame Tackles the Heat (Page 53) Engineered Systems - June 2008 - Notre Dame Tackles the Heat (Page 54) Engineered Systems - June 2008 - State Of The Arts (Page 55) Engineered Systems - June 2008 - State Of The Arts (Page 56) Engineered Systems - June 2008 - State Of The Arts (Page 57) Engineered Systems - June 2008 - State Of The Arts (Page 58) Engineered Systems - June 2008 - State Of The Arts (Page 59) Engineered Systems - June 2008 - Time For A Transplant? (Page 60) Engineered Systems - June 2008 - Time For A Transplant? (Page 61) Engineered Systems - June 2008 - Time For A Transplant? (Page 62) Engineered Systems - June 2008 - Time For A Transplant? (Page 63) Engineered Systems - June 2008 - Time For A Transplant? (Page 64) Engineered Systems - June 2008 - Time For A Transplant? (Page 65) Engineered Systems - June 2008 - Time For A Transplant? (Page 66) Engineered Systems - June 2008 - Project Delivery: What Can IPD Do For You? (Page 67) Engineered Systems - June 2008 - Project Delivery: What Can IPD Do For You? (Page 68) Engineered Systems - June 2008 - Project Delivery: What Can IPD Do For You? (Page 69) Engineered Systems - June 2008 - Project Delivery: What Can IPD Do For You? (Page 70) Engineered Systems - June 2008 - Project Delivery: What Can IPD Do For You? (Page 71) Engineered Systems - June 2008 - Issues & Events (Page 72) Engineered Systems - June 2008 - Issues & Events (Page 73) Engineered Systems - June 2008 - Issues & Events (Page 74) Engineered Systems - June 2008 - Issues & Events (Page 75) Engineered Systems - June 2008 - Issues & Events (Page 76) Engineered Systems - June 2008 - Issues & Events (Page 77) Engineered Systems - June 2008 - Computers & Software (Page 78) Engineered Systems - June 2008 - Products (Page 79) Engineered Systems - June 2008 - Application Checklist (Page 80) Engineered Systems - June 2008 - Glossary (Page 81) Engineered Systems - June 2008 - Classifieds (Page 82) Engineered Systems - June 2008 - Classifieds (Page 83) Engineered Systems - June 2008 - Classifieds (Page 84) Engineered Systems - June 2008 - Advertiser Index (Page 85) Engineered Systems - June 2008 - Tomorrow’s Engineer (Page 86) Engineered Systems - June 2008 - Tomorrow’s Engineer (Page Cover3) Engineered Systems - June 2008 - Tomorrow’s Engineer (Page Cover4)
For optimal viewing of this digital publication, please enable JavaScript and then refresh the page. If you would like to try to load the digital publication without using Flash Player detection, please click here.