Engineered Systems - June 2008 - (Page 54) Notre Dame Tackles The Heat tems of South Bend was in charge of the insulation, and Ziolkowski Construction provided general trade support for the press box project. GAME TIME TEST The installation was completed in 2007, just in time for the annual spring football game with 200 members of the press in attendance. “When we started up the system around 8 a.m. on game day it was 83° in the press box. By 10 a.m. it was 67°. At game time it was 67° with a packed room. At the end of each quarter it was still 67°. All systems performed flawlessly,” said Bruce Heberle with Excelsior. For his part, Quigley is happy with the VRF system, which solved both of his installation problems. “The system allowed us to move refrigerant instead of air, which meant we could make the same precarious journey from roof to press room with eight small 1 7/8-in. copper lines instead of multiple 4-ft by 3-ft supply and return duct runs, solving the installation problem,” Quigley said. Inside the box, specific air handlers were placed in front of the glass to give the glass area a constant air wash, while air handlers installed in other areas of the room did not need to be load intensive. All of the air handlers incorporate linear expansion valves, which means they produce the precise amount of cooling that each area needs at all times. “This is a huge energy saver, since the glass load goes from extremely intense to rather mild depending upon the time of the day, and the location of the sun, and the units only work as much as is necessary to produce the amount of cooling needed to handle the load,” Quigley said. At times when the load is low, the inverter compressor, and air handlers cycle down as low as 16% of their rated capacity, meaning 84% less energy used. “This solved the comfort problem,” he added. As for the offer of donated equipment, which doesn’t happen every day, Quigley said that free equipment is pretty tough competition for a bid. However, due to the creative, practical, and functional solutions made possible by the VRF system, Notre Dame turned down the offer for the free air source rooftop units and opted to invest in this technology instead. “They knew they were money ahead for years to come, and the integrity of the building would not be affected by our installation,” he added. ES Commercial Replacement Coils Tel: 800-225-4328 Fax 662-229-4212 OEM Coils Tel: 662-229-2000 Fax 662-229-2297 Aluminum Coils Tel: 662-229-2587 Fax 662-229-2571 ● ● ● ● ● ● ● Quality Lead-time Reliability Factory Trained Representation Selection/Rating Software ARI & UL Certification UL Qualified Client Test Data Program Fritz is ES’ managing editor. Reach her at fritzc@bnpmedia.com. coils@luvata.com www.luvata.com/heatcraft Input 208 at www.esmagazine.com/instantproductinfo BIBLIOGRAPHY Amarnath, Ammi, and Morton Blatt, “Variable Refrigerant flow: Where, Why, and How,” Engineered Systems, February 2008, Vol. 25, No.2:54. Goetzler, William, “Variable Refrigerant Flow Systems,” AHSRAE Journal, April 2007:24. 54 En gi neer ed S y stem s June 2008 http://www.luvata.com/heatcraft http://www.luvata.com/heatcraft http://www.esmagazine.com/instantproductinfo
Table of Contents Feed for the Digital Edition of Engineered Systems - June 2008 Engineered Systems - June 2008 Contents Editor’s Note Letters To The Editor Back2Basics HVAC Challenge Case In Point Commissioning Efficiency Incentives HydroTech Building Automation Energy Wiz HVACR Designer Tips Notre Dame Tackles the Heat State Of The Arts Time For A Transplant? Project Delivery: What Can IPD Do For You? Issues & Events Computers & Software Products Application Checklist Glossary Classifieds Advertiser Index Tomorrow’s Engineer Engineered Systems - June 2008 Engineered Systems - June 2008 - (Page Intro) Engineered Systems - June 2008 - Engineered Systems - June 2008 (Page Cover1) Engineered Systems - June 2008 - Engineered Systems - June 2008 (Page Cover2) Engineered Systems - June 2008 - Engineered Systems - June 2008 (Page 3) Engineered Systems - June 2008 - Contents (Page 4) Engineered Systems - June 2008 - Contents (Page 5) Engineered Systems - June 2008 - Contents (Page 6) Engineered Systems - June 2008 - Contents (Page 7) Engineered Systems - June 2008 - Editor’s Note (Page 8) Engineered Systems - June 2008 - Editor’s Note (Page 9) Engineered Systems - June 2008 - Editor’s Note (Page 10) Engineered Systems - June 2008 - Letters To The Editor (Page 11) Engineered Systems - June 2008 - Letters To The Editor (Page 12) Engineered Systems - June 2008 - Letters To The Editor (Page 13) Engineered Systems - June 2008 - Back2Basics (Page 14) Engineered Systems - June 2008 - Back2Basics (Page 15) Engineered Systems - June 2008 - Back2Basics (Page 16) Engineered Systems - June 2008 - Back2Basics (Page 17) Engineered Systems - June 2008 - HVAC Challenge (Page 18) Engineered Systems - June 2008 - HVAC Challenge (Page 19) Engineered Systems - June 2008 - Case In Point (Page 20) Engineered Systems - June 2008 - Case In Point (Page 21) Engineered Systems - June 2008 - Case In Point (Page 22) Engineered Systems - June 2008 - Case In Point (Page 23) Engineered Systems - June 2008 - Case In Point (Page 24) Engineered Systems - June 2008 - Case In Point (Page 25) Engineered Systems - June 2008 - Case In Point (Page 26) Engineered Systems - June 2008 - Case In Point (Page 27) Engineered Systems - June 2008 - Case In Point (Page 28) Engineered Systems - June 2008 - Case In Point (Page 29) Engineered Systems - June 2008 - Case In Point (Page 30) Engineered Systems - June 2008 - Case In Point (Page 31) Engineered Systems - June 2008 - Commissioning (Page 32) Engineered Systems - June 2008 - Efficiency Incentives (Page 33) Engineered Systems - June 2008 - Efficiency Incentives (Page 34) Engineered Systems - June 2008 - Efficiency Incentives (Page 35) Engineered Systems - June 2008 - HydroTech (Page 36) Engineered Systems - June 2008 - HydroTech (Page 37) Engineered Systems - June 2008 - Building Automation (Page 38) Engineered Systems - June 2008 - Building Automation (Page 39) Engineered Systems - June 2008 - Energy Wiz (Page 40) Engineered Systems - June 2008 - Energy Wiz (Page 41) Engineered Systems - June 2008 - HVACR Designer Tips (Page 42) Engineered Systems - June 2008 - HVACR Designer Tips (Page 43) Engineered Systems - June 2008 - Notre Dame Tackles the Heat (Page 44) Engineered Systems - June 2008 - Notre Dame Tackles the Heat (Page 45) Engineered Systems - June 2008 - Notre Dame Tackles the Heat (Page 46) Engineered Systems - June 2008 - Notre Dame Tackles the Heat (Page 47) Engineered Systems - June 2008 - Notre Dame Tackles the Heat (Page 48) Engineered Systems - June 2008 - Notre Dame Tackles the Heat (Page 49) Engineered Systems - June 2008 - Notre Dame Tackles the Heat (Page 50) Engineered Systems - June 2008 - Notre Dame Tackles the Heat (Page 51) Engineered Systems - June 2008 - Notre Dame Tackles the Heat (Page 52) Engineered Systems - June 2008 - Notre Dame Tackles the Heat (Page 53) Engineered Systems - June 2008 - Notre Dame Tackles the Heat (Page 54) Engineered Systems - June 2008 - State Of The Arts (Page 55) Engineered Systems - June 2008 - State Of The Arts (Page 56) Engineered Systems - June 2008 - State Of The Arts (Page 57) Engineered Systems - June 2008 - State Of The Arts (Page 58) Engineered Systems - June 2008 - State Of The Arts (Page 59) Engineered Systems - June 2008 - Time For A Transplant? (Page 60) Engineered Systems - June 2008 - Time For A Transplant? (Page 61) Engineered Systems - June 2008 - Time For A Transplant? (Page 62) Engineered Systems - June 2008 - Time For A Transplant? (Page 63) Engineered Systems - June 2008 - Time For A Transplant? (Page 64) Engineered Systems - June 2008 - Time For A Transplant? (Page 65) Engineered Systems - June 2008 - Time For A Transplant? (Page 66) Engineered Systems - June 2008 - Project Delivery: What Can IPD Do For You? (Page 67) Engineered Systems - June 2008 - Project Delivery: What Can IPD Do For You? (Page 68) Engineered Systems - June 2008 - Project Delivery: What Can IPD Do For You? (Page 69) Engineered Systems - June 2008 - Project Delivery: What Can IPD Do For You? (Page 70) Engineered Systems - June 2008 - Project Delivery: What Can IPD Do For You? (Page 71) Engineered Systems - June 2008 - Issues & Events (Page 72) Engineered Systems - June 2008 - Issues & Events (Page 73) Engineered Systems - June 2008 - Issues & Events (Page 74) Engineered Systems - June 2008 - Issues & Events (Page 75) Engineered Systems - June 2008 - Issues & Events (Page 76) Engineered Systems - June 2008 - Issues & Events (Page 77) Engineered Systems - June 2008 - Computers & Software (Page 78) Engineered Systems - June 2008 - Products (Page 79) Engineered Systems - June 2008 - Application Checklist (Page 80) Engineered Systems - June 2008 - Glossary (Page 81) Engineered Systems - June 2008 - Classifieds (Page 82) Engineered Systems - June 2008 - Classifieds (Page 83) Engineered Systems - June 2008 - Classifieds (Page 84) Engineered Systems - June 2008 - Advertiser Index (Page 85) Engineered Systems - June 2008 - Tomorrow’s Engineer (Page 86) Engineered Systems - June 2008 - Tomorrow’s Engineer (Page Cover3) Engineered Systems - June 2008 - Tomorrow’s Engineer (Page Cover4)
For optimal viewing of this digital publication, please enable JavaScript and then refresh the page. If you would like to try to load the digital publication without using Flash Player detection, please click here.