Engineered Systems - June 2008 - (Page 67) They say that change is good. However, it certainly isn’t good later in the design/construction process, where inadequate planning or teamwork up front can eventually cost a lot of time and money to rectify. The author offers his ideas about integrated project planning and delivery, which range from maintaining a common knowledge base for smarter decisions to coordinating meetings effectively. With real-life successes in applications ranging from hospitals to a ballpark, the five-point approach can fit like a glove for complex projects. Maybe it’ll help you get a grip on your next challenge. BY PHILIP PATRICK SUN, AIA, ACHA rojects all seem to start with optimism and an acknowledgement that there may be a few bumps along the way. “Sunny, with a chance of showers,” is one way of putting it. Are your projects running smoothly and without question? Have the design and construction team and the owner developed a relationship based on trust and not just technical roles? Is the cost remaining stable or swaying from number to number, with the plan changing from week to week? How do we make project delivery more consistent and more reliable? Having worked on hundreds of health care projects over the years, lessons learned have become consistent. The impact of cost increases and delays has become more severe. Davis Langdon, a major cost planning organization, reported hospital construction costs were $330/sq ft in 2003 and increased to $550 in 2006. Currently the cost of construction for hospitals on the West Coast exceeds $900/sq ft. That is an average increase of 18.5% per annum. Peter Morris with Davis Langdon reports a continuing increase while Dinesh Ghia, vice president and a chief estimator for Gilbane Building Company, currently suggests an annual rate of increase of over 12%. Whether the rate of increase stops or slows down or not, changes cost time, and time costs money. P While I have presented papers over the years about planning and design processes which help stem delays and changes which seem to infect most projects, this article will hit at the symptoms of a building program going astray and common problems. We also need to recognize that the cost of operations in health care far exceeds the construction cost of the buildings over time. The cost of operations is based on many factors, including the functionality and layout of the facility. Poorly planned buildings result in poor continuing operational costs, and poor planning is usually accompanied by changes and delays. Changes contribute to wasted effort. Construction delays due to changes and poorly planned buildings, therefore, present the most vexing problems and the most waste. ANATOMY OF A PROBLEM Why and how do these changes take place? Common early symptoms of potential problems leading to potential changes: • The project starts without clarity regarding who is responsible for which decisions. • There was a desire to look at ways for the department to become w w w. esmag a zin e. c o m 67 www.esmagazine.com
Table of Contents Feed for the Digital Edition of Engineered Systems - June 2008 Engineered Systems - June 2008 Contents Editor’s Note Letters To The Editor Back2Basics HVAC Challenge Case In Point Commissioning Efficiency Incentives HydroTech Building Automation Energy Wiz HVACR Designer Tips Notre Dame Tackles the Heat State Of The Arts Time For A Transplant? Project Delivery: What Can IPD Do For You? Issues & Events Computers & Software Products Application Checklist Glossary Classifieds Advertiser Index Tomorrow’s Engineer Engineered Systems - June 2008 Engineered Systems - June 2008 - (Page Intro) Engineered Systems - June 2008 - Engineered Systems - June 2008 (Page Cover1) Engineered Systems - June 2008 - Engineered Systems - June 2008 (Page Cover2) Engineered Systems - June 2008 - Engineered Systems - June 2008 (Page 3) Engineered Systems - June 2008 - Contents (Page 4) Engineered Systems - June 2008 - Contents (Page 5) Engineered Systems - June 2008 - Contents (Page 6) Engineered Systems - June 2008 - Contents (Page 7) Engineered Systems - June 2008 - Editor’s Note (Page 8) Engineered Systems - June 2008 - Editor’s Note (Page 9) Engineered Systems - June 2008 - Editor’s Note (Page 10) Engineered Systems - June 2008 - Letters To The Editor (Page 11) Engineered Systems - June 2008 - Letters To The Editor (Page 12) Engineered Systems - June 2008 - Letters To The Editor (Page 13) Engineered Systems - June 2008 - Back2Basics (Page 14) Engineered Systems - June 2008 - Back2Basics (Page 15) Engineered Systems - June 2008 - Back2Basics (Page 16) Engineered Systems - June 2008 - Back2Basics (Page 17) Engineered Systems - June 2008 - HVAC Challenge (Page 18) Engineered Systems - June 2008 - HVAC Challenge (Page 19) Engineered Systems - June 2008 - Case In Point (Page 20) Engineered Systems - June 2008 - Case In Point (Page 21) Engineered Systems - June 2008 - Case In Point (Page 22) Engineered Systems - June 2008 - Case In Point (Page 23) Engineered Systems - June 2008 - Case In Point (Page 24) Engineered Systems - June 2008 - Case In Point (Page 25) Engineered Systems - June 2008 - Case In Point (Page 26) Engineered Systems - June 2008 - Case In Point (Page 27) Engineered Systems - June 2008 - Case In Point (Page 28) Engineered Systems - June 2008 - Case In Point (Page 29) Engineered Systems - June 2008 - Case In Point (Page 30) Engineered Systems - June 2008 - Case In Point (Page 31) Engineered Systems - June 2008 - Commissioning (Page 32) Engineered Systems - June 2008 - Efficiency Incentives (Page 33) Engineered Systems - June 2008 - Efficiency Incentives (Page 34) Engineered Systems - June 2008 - Efficiency Incentives (Page 35) Engineered Systems - June 2008 - HydroTech (Page 36) Engineered Systems - June 2008 - HydroTech (Page 37) Engineered Systems - June 2008 - Building Automation (Page 38) Engineered Systems - June 2008 - Building Automation (Page 39) Engineered Systems - June 2008 - Energy Wiz (Page 40) Engineered Systems - June 2008 - Energy Wiz (Page 41) Engineered Systems - June 2008 - HVACR Designer Tips (Page 42) Engineered Systems - June 2008 - HVACR Designer Tips (Page 43) Engineered Systems - June 2008 - Notre Dame Tackles the Heat (Page 44) Engineered Systems - June 2008 - Notre Dame Tackles the Heat (Page 45) Engineered Systems - June 2008 - Notre Dame Tackles the Heat (Page 46) Engineered Systems - June 2008 - Notre Dame Tackles the Heat (Page 47) Engineered Systems - June 2008 - Notre Dame Tackles the Heat (Page 48) Engineered Systems - June 2008 - Notre Dame Tackles the Heat (Page 49) Engineered Systems - June 2008 - Notre Dame Tackles the Heat (Page 50) Engineered Systems - June 2008 - Notre Dame Tackles the Heat (Page 51) Engineered Systems - June 2008 - Notre Dame Tackles the Heat (Page 52) Engineered Systems - June 2008 - Notre Dame Tackles the Heat (Page 53) Engineered Systems - June 2008 - Notre Dame Tackles the Heat (Page 54) Engineered Systems - June 2008 - State Of The Arts (Page 55) Engineered Systems - June 2008 - State Of The Arts (Page 56) Engineered Systems - June 2008 - State Of The Arts (Page 57) Engineered Systems - June 2008 - State Of The Arts (Page 58) Engineered Systems - June 2008 - State Of The Arts (Page 59) Engineered Systems - June 2008 - Time For A Transplant? (Page 60) Engineered Systems - June 2008 - Time For A Transplant? (Page 61) Engineered Systems - June 2008 - Time For A Transplant? (Page 62) Engineered Systems - June 2008 - Time For A Transplant? (Page 63) Engineered Systems - June 2008 - Time For A Transplant? (Page 64) Engineered Systems - June 2008 - Time For A Transplant? (Page 65) Engineered Systems - June 2008 - Time For A Transplant? (Page 66) Engineered Systems - June 2008 - Project Delivery: What Can IPD Do For You? (Page 67) Engineered Systems - June 2008 - Project Delivery: What Can IPD Do For You? (Page 68) Engineered Systems - June 2008 - Project Delivery: What Can IPD Do For You? (Page 69) Engineered Systems - June 2008 - Project Delivery: What Can IPD Do For You? (Page 70) Engineered Systems - June 2008 - Project Delivery: What Can IPD Do For You? (Page 71) Engineered Systems - June 2008 - Issues & Events (Page 72) Engineered Systems - June 2008 - Issues & Events (Page 73) Engineered Systems - June 2008 - Issues & Events (Page 74) Engineered Systems - June 2008 - Issues & Events (Page 75) Engineered Systems - June 2008 - Issues & Events (Page 76) Engineered Systems - June 2008 - Issues & Events (Page 77) Engineered Systems - June 2008 - Computers & Software (Page 78) Engineered Systems - June 2008 - Products (Page 79) Engineered Systems - June 2008 - Application Checklist (Page 80) Engineered Systems - June 2008 - Glossary (Page 81) Engineered Systems - June 2008 - Classifieds (Page 82) Engineered Systems - June 2008 - Classifieds (Page 83) Engineered Systems - June 2008 - Classifieds (Page 84) Engineered Systems - June 2008 - Advertiser Index (Page 85) Engineered Systems - June 2008 - Tomorrow’s Engineer (Page 86) Engineered Systems - June 2008 - Tomorrow’s Engineer (Page Cover3) Engineered Systems - June 2008 - Tomorrow’s Engineer (Page Cover4)
For optimal viewing of this digital publication, please enable JavaScript and then refresh the page. If you would like to try to load the digital publication without using Flash Player detection, please click here.