Engineered Systems - August 2008 - (Page 22) HVACRDesignerTips BY AMANDA MCKEW EQUIPMENT STARTUP CHECKLIST For Places of Assembly: The School Gymnasium Equipment type: Two AHUs Equipment designation: AHU-1, AHU-2 Barcode designation: 111111 Area served: School gymnasium Equipment location: Rooftop • Confirm there is the manufacturers’ recommended clearance around equipment. • Consider if routine maintenance can be achieved without shutting unit down. • Attach equipment schedule and design criteria to checklist • Attach sequence of operation to checklist. • Attach associated contract detail drawing to checklist. ELECTRICAL INSPECTION • Confirm that electrical connections are complete. • Disconnect installed per code compliance. • Starter and wire sizing per contract documents. • Motor bumped to verify rotation. • Terminations and panel circuit labeled. • Voltage and motor amps (per phase) documented. • Electric reheat connected (if applicable). • Electric humidifier connected (if applicable). [Y] [N] ❍ ❍ ❍ ❍ ❍ ❍ ❍ ❍ ❍ ❍ ❍ ❍ ❍ ❍ ❍ ❍ REFERENCE • 2008 ASHRAE Handbook –Systems & Equipment, Chapter 1, “HVAC System Analysis and Selection,” and Chapter 2, “Decentralized Cooling & Heating.” • 2007 ASHRAE Handbook –HVAC Applications, Chapter “Places of Assembly” 4, EQUIPMENT INSTALLATION (PER CONTRACT DRAWINGS AND SPECIFICATION) [Y] [N] • Piping installation complete at unit (CHW, CW or DX). • Vibration isolation complete (if applicable). • Seismic restraints complete (if applicable). • Interior of unit is clean of any debris. • Filters are clean with no restricted airflow. • Manufacturer’s O&M info available. • Manufacturer’s startup sheets attached with this checklist. • Warranty certificate available. ❍ ❍ ❍ ❍ ❍ ❍ ❍ ❍ ❍ ❍ ❍ ❍ ❍ ❍ ❍ ❍ NOTE • Refer to equipment manufacturers’ literature for additional data and requirements. • Refer to building owner standards and guidelines for additional criteria. ES DISTRIBUTION (TO AND FROM EQUIPMENT) [Y] [N] ❍ ❍ ❍ ❍ ❍ ❍ ❍ If you have any comments, suggestions, or questions regarding this designer checklist, contact Amanda McKew at amckew@ rdkengineers.com. • Piping pressure tested per contract documents (no leaks). ❍ • Humidification installation complete (if applicable). ❍ • Insulation completed. ❍ • Non-toxic glycol solution at correct percentage (if applicable). ❍ • Installation per contract documents (specification and details). ❍ • TAB report and field notes attached with this checklist. ❍ • Identification per contract documents. ❍ AUTOMATIC CONTROLS • Control points confirmed. • Alarm types determined and enabled. • Alarm limits programmed. • Electrical system interlocks complete. • Unit furnished controls interfaced with owner’s BAS computer. [Y] [N] ❍ ❍ ❍ ❍ ❍ ❍ ❍ ❍ ❍ ❍ DESIGN REVIEW AND TRICKS-OF-THE TRADE • Create an airflow diagram indicating CFM, air changes, and space pressure. • Confirm there is safe access to the equipment. 22 En gi neer ed S y stem s August 2008
Table of Contents Feed for the Digital Edition of Engineered Systems - August 2008 Engineered Systems - August 2008 Contents Editor's Note Back2Basics HVAC Challenge Case In Point Commissioning Building Automation Efficiency Incentives HVACR Designer Tips Glass Box to Grand Casino Looking Radiant In Green Mechanical Products Sourcebook Q&A: Dehumidification In Schools Building Oversight Management: M&V And More Products Classifieds Advertiser Index Tomorrow's Environment Engineered Systems - August 2008 Engineered Systems - August 2008 - (Page Intro) Engineered Systems - August 2008 - Engineered Systems - August 2008 (Page Cover1) Engineered Systems - August 2008 - Engineered Systems - August 2008 (Page Cover2) Engineered Systems - August 2008 - Engineered Systems - August 2008 (Page 3) Engineered Systems - August 2008 - Contents (Page 4) Engineered Systems - August 2008 - Contents (Page 5) Engineered Systems - August 2008 - Contents (Page 6) Engineered Systems - August 2008 - Contents (Page 7) Engineered Systems - August 2008 - Editor's Note (Page 8) Engineered Systems - August 2008 - Editor's Note (Page 9) Engineered Systems - August 2008 - Back2Basics (Page 10) Engineered Systems - August 2008 - Back2Basics (Page 11) Engineered Systems - August 2008 - HVAC Challenge (Page 12) Engineered Systems - August 2008 - HVAC Challenge (Page 13) Engineered Systems - August 2008 - Case In Point (Page 14) Engineered Systems - August 2008 - Case In Point (Page 15) Engineered Systems - August 2008 - Commissioning (Page 16) Engineered Systems - August 2008 - Commissioning (Page 17) Engineered Systems - August 2008 - Building Automation (Page 18) Engineered Systems - August 2008 - Building Automation (Page 19) Engineered Systems - August 2008 - Efficiency Incentives (Page 20) Engineered Systems - August 2008 - Efficiency Incentives (Page 21) Engineered Systems - August 2008 - HVACR Designer Tips (Page 22) Engineered Systems - August 2008 - HVACR Designer Tips (Page 23) Engineered Systems - August 2008 - Glass Box to Grand Casino (Page 24) Engineered Systems - August 2008 - Glass Box to Grand Casino (Page 25) Engineered Systems - August 2008 - Glass Box to Grand Casino (Page 26) Engineered Systems - August 2008 - Glass Box to Grand Casino (Page 27) Engineered Systems - August 2008 - Glass Box to Grand Casino (Page 28) Engineered Systems - August 2008 - Glass Box to Grand Casino (Page 29) Engineered Systems - August 2008 - Glass Box to Grand Casino (Page 30) Engineered Systems - August 2008 - Glass Box to Grand Casino (Page 31) Engineered Systems - August 2008 - Glass Box to Grand Casino (Page 32) Engineered Systems - August 2008 - Glass Box to Grand Casino (Page 33) Engineered Systems - August 2008 - Looking Radiant In Green (Page 34) Engineered Systems - August 2008 - Looking Radiant In Green (Page 35) Engineered Systems - August 2008 - Looking Radiant In Green (Page 36) Engineered Systems - August 2008 - Looking Radiant In Green (Page 37) Engineered Systems - August 2008 - Looking Radiant In Green (Page 38) Engineered Systems - August 2008 - Looking Radiant In Green (Page 39) Engineered Systems - August 2008 - Mechanical Products Sourcebook (Page 1M) Engineered Systems - August 2008 - Mechanical Products Sourcebook (Page 2M) Engineered Systems - August 2008 - Mechanical Products Sourcebook (Page 3M) Engineered Systems - August 2008 - Mechanical Products Sourcebook (Page 4M) Engineered Systems - August 2008 - Mechanical Products Sourcebook (Page 5M) Engineered Systems - August 2008 - Mechanical Products Sourcebook (Page 6M) Engineered Systems - August 2008 - Mechanical Products Sourcebook (Page 7M) Engineered Systems - August 2008 - Mechanical Products Sourcebook (Page 8M) Engineered Systems - August 2008 - Mechanical Products Sourcebook (Page 9M) Engineered Systems - August 2008 - Mechanical Products Sourcebook (Page 10M) Engineered Systems - August 2008 - Mechanical Products Sourcebook (Page 11M) Engineered Systems - August 2008 - Mechanical Products Sourcebook (Page 12M) Engineered Systems - August 2008 - Mechanical Products Sourcebook (Page 13M) Engineered Systems - August 2008 - Mechanical Products Sourcebook (Page 14M) Engineered Systems - August 2008 - Mechanical Products Sourcebook (Page 15M) Engineered Systems - August 2008 - Mechanical Products Sourcebook (Page 16M) Engineered Systems - August 2008 - Q&A: Dehumidification In Schools (Page 56) Engineered Systems - August 2008 - Q&A: Dehumidification In Schools (Page 57) Engineered Systems - August 2008 - Q&A: Dehumidification In Schools (Page 58) Engineered Systems - August 2008 - Q&A: Dehumidification In Schools (Page 59) Engineered Systems - August 2008 - Q&A: Dehumidification In Schools (Page 60) Engineered Systems - August 2008 - Q&A: Dehumidification In Schools (Page 61) Engineered Systems - August 2008 - Building Oversight Management: M&V And More (Page 62) Engineered Systems - August 2008 - Building Oversight Management: M&V And More (Page 63) Engineered Systems - August 2008 - Building Oversight Management: M&V And More (Page 64) Engineered Systems - August 2008 - Building Oversight Management: M&V And More (Page 65) Engineered Systems - August 2008 - Building Oversight Management: M&V And More (Page 66) Engineered Systems - August 2008 - Building Oversight Management: M&V And More (Page 67) Engineered Systems - August 2008 - Products (Page 68) Engineered Systems - August 2008 - Products (Page 69) Engineered Systems - August 2008 - Products (Page 70) Engineered Systems - August 2008 - Products (Page 71) Engineered Systems - August 2008 - Products (Page 72) Engineered Systems - August 2008 - Classifieds (Page 73) Engineered Systems - August 2008 - Classifieds (Page 74) Engineered Systems - August 2008 - Classifieds (Page 75) Engineered Systems - August 2008 - Classifieds (Page 76) Engineered Systems - August 2008 - Advertiser Index (Page 77) Engineered Systems - August 2008 - Tomorrow's Environment (Page 78) Engineered Systems - August 2008 - Tomorrow's Environment (Page Cover3) Engineered Systems - August 2008 - Tomorrow's Environment (Page Cover4)
For optimal viewing of this digital publication, please enable JavaScript and then refresh the page. If you would like to try to load the digital publication without using Flash Player detection, please click here.