Engineered Systems - August 2008 - (Page 30) GLASS BOX TO GRAND CASINO cooler air “puddles” at the floor level of the space because of the temperature differential. Physical objects such as tables and shelves (anything other than a solid wall) are not problematic, as the air just pools around them. When the cool air reaches a heating source such as a person, or slot machine, it warms up and rises past them, to be exhausted at the top of the space, in this case, by the existing AHUs or by natural means when possible. EH Price, the supplier, actually built a mock-up of a small area of the casino at its plant in Winnipeg to demonstrate the system’s effectiveness. All of the desired effects were tested and confirmed by both the EH Price mock-up and our energy modeling. This system provides several advantages over the UFAD or traditional overhead supply systems. The warmer supply air temperature allows for more free cooling throughout the year. When coupled with the low supply velocity, it also eliminates uncomfortable cold spots and drafts. The low velocity also creates very quiet space (not that noise is an issue in a casino gaming area). In addition, the system can provide either 100% outdoor air for better air quality or return air for energy efficiency. The system uses CO2 sensors to constantly evaluate the two options, and its automatic controls maintain good IAQ. The low velocity delivery and reduced duct losses also increase the system’s energy efficiency of the system. The displacement cooling design is a good match for the double façade, because it also works with the laws of physics rather than against them. It takes advantage of natural stratification to exhaust warm, “used” air and only conditions the lower, occupied space. This works especially well in this double-height building. The question of dehumidification arose, which is not generally a consideration in Vancouver’s mild climate. Dehumidification was built into the system by providing the heating coil Input 215 at www.esmagazine.com/instantproductinfo ESM08084Dynamic.indd 1 7/21/08 2:59:04 PM Engineers and building owners rely on Belimo to ensure reliable, energy efficient performance in their HVAC systems. The consistent quality, delivery and performance of Belimo products have solved comfort challenges, improved energy efficiencies and earned trust through long and productive life. The Pressure Independent Characterized Control Valve (PICCV) combines the proven CCV technology plus a dynamic regulator. PICCV reacts to pressure variations, performing a continual balancing function to maintain optimum system performance. Want the best? Specify Belimo > Get the details: www.piccv.com BELIMO • 877.833.1609 • www.belimo.com Input 65 at www.esmagazine.com/instantproductinfo 30 ESM07084Belimo.indd 1 En gi neer ed S y stem s August 2008 6/23/08 11:31:48 AM http://DynamicsAQS.com http://DynamicsAQS.com http://www.esmagazine.com/instantproductinfo http://www.belimo.com http://www.piccv.com http://www.belimo.com http://www.esmagazine.com/instantproductinfo
Table of Contents Feed for the Digital Edition of Engineered Systems - August 2008 Engineered Systems - August 2008 Contents Editor's Note Back2Basics HVAC Challenge Case In Point Commissioning Building Automation Efficiency Incentives HVACR Designer Tips Glass Box to Grand Casino Looking Radiant In Green Mechanical Products Sourcebook Q&A: Dehumidification In Schools Building Oversight Management: M&V And More Products Classifieds Advertiser Index Tomorrow's Environment Engineered Systems - August 2008 Engineered Systems - August 2008 - (Page Intro) Engineered Systems - August 2008 - Engineered Systems - August 2008 (Page Cover1) Engineered Systems - August 2008 - Engineered Systems - August 2008 (Page Cover2) Engineered Systems - August 2008 - Engineered Systems - August 2008 (Page 3) Engineered Systems - August 2008 - Contents (Page 4) Engineered Systems - August 2008 - Contents (Page 5) Engineered Systems - August 2008 - Contents (Page 6) Engineered Systems - August 2008 - Contents (Page 7) Engineered Systems - August 2008 - Editor's Note (Page 8) Engineered Systems - August 2008 - Editor's Note (Page 9) Engineered Systems - August 2008 - Back2Basics (Page 10) Engineered Systems - August 2008 - Back2Basics (Page 11) Engineered Systems - August 2008 - HVAC Challenge (Page 12) Engineered Systems - August 2008 - HVAC Challenge (Page 13) Engineered Systems - August 2008 - Case In Point (Page 14) Engineered Systems - August 2008 - Case In Point (Page 15) Engineered Systems - August 2008 - Commissioning (Page 16) Engineered Systems - August 2008 - Commissioning (Page 17) Engineered Systems - August 2008 - Building Automation (Page 18) Engineered Systems - August 2008 - Building Automation (Page 19) Engineered Systems - August 2008 - Efficiency Incentives (Page 20) Engineered Systems - August 2008 - Efficiency Incentives (Page 21) Engineered Systems - August 2008 - HVACR Designer Tips (Page 22) Engineered Systems - August 2008 - HVACR Designer Tips (Page 23) Engineered Systems - August 2008 - Glass Box to Grand Casino (Page 24) Engineered Systems - August 2008 - Glass Box to Grand Casino (Page 25) Engineered Systems - August 2008 - Glass Box to Grand Casino (Page 26) Engineered Systems - August 2008 - Glass Box to Grand Casino (Page 27) Engineered Systems - August 2008 - Glass Box to Grand Casino (Page 28) Engineered Systems - August 2008 - Glass Box to Grand Casino (Page 29) Engineered Systems - August 2008 - Glass Box to Grand Casino (Page 30) Engineered Systems - August 2008 - Glass Box to Grand Casino (Page 31) Engineered Systems - August 2008 - Glass Box to Grand Casino (Page 32) Engineered Systems - August 2008 - Glass Box to Grand Casino (Page 33) Engineered Systems - August 2008 - Looking Radiant In Green (Page 34) Engineered Systems - August 2008 - Looking Radiant In Green (Page 35) Engineered Systems - August 2008 - Looking Radiant In Green (Page 36) Engineered Systems - August 2008 - Looking Radiant In Green (Page 37) Engineered Systems - August 2008 - Looking Radiant In Green (Page 38) Engineered Systems - August 2008 - Looking Radiant In Green (Page 39) Engineered Systems - August 2008 - Mechanical Products Sourcebook (Page 1M) Engineered Systems - August 2008 - Mechanical Products Sourcebook (Page 2M) Engineered Systems - August 2008 - Mechanical Products Sourcebook (Page 3M) Engineered Systems - August 2008 - Mechanical Products Sourcebook (Page 4M) Engineered Systems - August 2008 - Mechanical Products Sourcebook (Page 5M) Engineered Systems - August 2008 - Mechanical Products Sourcebook (Page 6M) Engineered Systems - August 2008 - Mechanical Products Sourcebook (Page 7M) Engineered Systems - August 2008 - Mechanical Products Sourcebook (Page 8M) Engineered Systems - August 2008 - Mechanical Products Sourcebook (Page 9M) Engineered Systems - August 2008 - Mechanical Products Sourcebook (Page 10M) Engineered Systems - August 2008 - Mechanical Products Sourcebook (Page 11M) Engineered Systems - August 2008 - Mechanical Products Sourcebook (Page 12M) Engineered Systems - August 2008 - Mechanical Products Sourcebook (Page 13M) Engineered Systems - August 2008 - Mechanical Products Sourcebook (Page 14M) Engineered Systems - August 2008 - Mechanical Products Sourcebook (Page 15M) Engineered Systems - August 2008 - Mechanical Products Sourcebook (Page 16M) Engineered Systems - August 2008 - Q&A: Dehumidification In Schools (Page 56) Engineered Systems - August 2008 - Q&A: Dehumidification In Schools (Page 57) Engineered Systems - August 2008 - Q&A: Dehumidification In Schools (Page 58) Engineered Systems - August 2008 - Q&A: Dehumidification In Schools (Page 59) Engineered Systems - August 2008 - Q&A: Dehumidification In Schools (Page 60) Engineered Systems - August 2008 - Q&A: Dehumidification In Schools (Page 61) Engineered Systems - August 2008 - Building Oversight Management: M&V And More (Page 62) Engineered Systems - August 2008 - Building Oversight Management: M&V And More (Page 63) Engineered Systems - August 2008 - Building Oversight Management: M&V And More (Page 64) Engineered Systems - August 2008 - Building Oversight Management: M&V And More (Page 65) Engineered Systems - August 2008 - Building Oversight Management: M&V And More (Page 66) Engineered Systems - August 2008 - Building Oversight Management: M&V And More (Page 67) Engineered Systems - August 2008 - Products (Page 68) Engineered Systems - August 2008 - Products (Page 69) Engineered Systems - August 2008 - Products (Page 70) Engineered Systems - August 2008 - Products (Page 71) Engineered Systems - August 2008 - Products (Page 72) Engineered Systems - August 2008 - Classifieds (Page 73) Engineered Systems - August 2008 - Classifieds (Page 74) Engineered Systems - August 2008 - Classifieds (Page 75) Engineered Systems - August 2008 - Classifieds (Page 76) Engineered Systems - August 2008 - Advertiser Index (Page 77) Engineered Systems - August 2008 - Tomorrow's Environment (Page 78) Engineered Systems - August 2008 - Tomorrow's Environment (Page Cover3) Engineered Systems - August 2008 - Tomorrow's Environment (Page Cover4)
For optimal viewing of this digital publication, please enable JavaScript and then refresh the page. If you would like to try to load the digital publication without using Flash Player detection, please click here.