Engineered Systems - August 2008 - (Page 32) GLASS BOX TO GRAND CASINO downstream of the cooling coil for all of the interior fancoil units, but it hasn’t been needed yet. We achieved this at no extra cost; the simple rearrangement of the coils allows us to first dehumidify with the cooling coil if we need to, and then reheat the air if warm air is required. One challenge did arise within the first year of operation: during the winter, the high heat losses at the entryway due to constantly opening doors were difficult to handle by blowing warm air in the façade and with the displacement system delivering air just below room temperature. To solve this problem, the entryway was redesigned with a welcoming vestibule, with offset interior and exterior doors to keep the warm interior air from rushing out and the cold exterior air from rushing in. This entryway challenge requires careful consideration in any climate, hot or cold. CONCLUSIONS Since completion and amendment of the entry vestibule in 2005, the double façade and displacement cooling system have been a huge success. Although a temporary project, the building has become a key example of displacement cooling, especially for the niche casino market. At the time of completion, this building was the largest application of displacement cooling in North America. Casino owners from Las Vegas have toured the facility to examine the displacement ventilation system and explore the possibilities it offers for smoking environments. Smoke would simply rise up with the stratified air and get exhausted to the outside without ever mixing with the low-level supply air. This would be a practical, low-cost, energy-efficient alternative to the traditional “muscle” approach of high exhaust volume, which is energy-intensive and creates uncomfortable drafts. The project was a learning experience for all involved, and a great opportunity to apply integrated design and modern engineering solutions tied to the oldest laws of physics. ES Ms. Hayes joined Cobalt Engineering in June 2005 after completing her engineering degree at Queen’s University in Kingston. As a sustainable designer, her practice includes sustainable building systems design and thermal modeling. E-mail her at shayes@cobaltengineering.com. Mr. Newbert is a founding partner of Cobalt Engineering. He designed the first C2000 project in Western Canada (pre-LEED) and one of the first 100% naturally ventilated office buildings in Canada. As technical director and mentor of Cobalt’s emerging engineers, he draws on over 25 years of diverse industry experience. E-mail him at knewbert@cobaltengineering.com. For more information, visit www.cobaltengineering.com. Input 183 at www.esmagazine.com/instantproductinfo ESM08084Emon.indd 1 ed S y stem s August 2008 32 En gi neer 7/18/08 10:36:21 AM http://www.cobaltengineering.com http://www.emon.com/es8.asp http://www.emon.com/es8.asp http://www.esmagazine.com/instantproductinfo
Table of Contents Feed for the Digital Edition of Engineered Systems - August 2008 Engineered Systems - August 2008 Contents Editor's Note Back2Basics HVAC Challenge Case In Point Commissioning Building Automation Efficiency Incentives HVACR Designer Tips Glass Box to Grand Casino Looking Radiant In Green Mechanical Products Sourcebook Q&A: Dehumidification In Schools Building Oversight Management: M&V And More Products Classifieds Advertiser Index Tomorrow's Environment Engineered Systems - August 2008 Engineered Systems - August 2008 - (Page Intro) Engineered Systems - August 2008 - Engineered Systems - August 2008 (Page Cover1) Engineered Systems - August 2008 - Engineered Systems - August 2008 (Page Cover2) Engineered Systems - August 2008 - Engineered Systems - August 2008 (Page 3) Engineered Systems - August 2008 - Contents (Page 4) Engineered Systems - August 2008 - Contents (Page 5) Engineered Systems - August 2008 - Contents (Page 6) Engineered Systems - August 2008 - Contents (Page 7) Engineered Systems - August 2008 - Editor's Note (Page 8) Engineered Systems - August 2008 - Editor's Note (Page 9) Engineered Systems - August 2008 - Back2Basics (Page 10) Engineered Systems - August 2008 - Back2Basics (Page 11) Engineered Systems - August 2008 - HVAC Challenge (Page 12) Engineered Systems - August 2008 - HVAC Challenge (Page 13) Engineered Systems - August 2008 - Case In Point (Page 14) Engineered Systems - August 2008 - Case In Point (Page 15) Engineered Systems - August 2008 - Commissioning (Page 16) Engineered Systems - August 2008 - Commissioning (Page 17) Engineered Systems - August 2008 - Building Automation (Page 18) Engineered Systems - August 2008 - Building Automation (Page 19) Engineered Systems - August 2008 - Efficiency Incentives (Page 20) Engineered Systems - August 2008 - Efficiency Incentives (Page 21) Engineered Systems - August 2008 - HVACR Designer Tips (Page 22) Engineered Systems - August 2008 - HVACR Designer Tips (Page 23) Engineered Systems - August 2008 - Glass Box to Grand Casino (Page 24) Engineered Systems - August 2008 - Glass Box to Grand Casino (Page 25) Engineered Systems - August 2008 - Glass Box to Grand Casino (Page 26) Engineered Systems - August 2008 - Glass Box to Grand Casino (Page 27) Engineered Systems - August 2008 - Glass Box to Grand Casino (Page 28) Engineered Systems - August 2008 - Glass Box to Grand Casino (Page 29) Engineered Systems - August 2008 - Glass Box to Grand Casino (Page 30) Engineered Systems - August 2008 - Glass Box to Grand Casino (Page 31) Engineered Systems - August 2008 - Glass Box to Grand Casino (Page 32) Engineered Systems - August 2008 - Glass Box to Grand Casino (Page 33) Engineered Systems - August 2008 - Looking Radiant In Green (Page 34) Engineered Systems - August 2008 - Looking Radiant In Green (Page 35) Engineered Systems - August 2008 - Looking Radiant In Green (Page 36) Engineered Systems - August 2008 - Looking Radiant In Green (Page 37) Engineered Systems - August 2008 - Looking Radiant In Green (Page 38) Engineered Systems - August 2008 - Looking Radiant In Green (Page 39) Engineered Systems - August 2008 - Mechanical Products Sourcebook (Page 1M) Engineered Systems - August 2008 - Mechanical Products Sourcebook (Page 2M) Engineered Systems - August 2008 - Mechanical Products Sourcebook (Page 3M) Engineered Systems - August 2008 - Mechanical Products Sourcebook (Page 4M) Engineered Systems - August 2008 - Mechanical Products Sourcebook (Page 5M) Engineered Systems - August 2008 - Mechanical Products Sourcebook (Page 6M) Engineered Systems - August 2008 - Mechanical Products Sourcebook (Page 7M) Engineered Systems - August 2008 - Mechanical Products Sourcebook (Page 8M) Engineered Systems - August 2008 - Mechanical Products Sourcebook (Page 9M) Engineered Systems - August 2008 - Mechanical Products Sourcebook (Page 10M) Engineered Systems - August 2008 - Mechanical Products Sourcebook (Page 11M) Engineered Systems - August 2008 - Mechanical Products Sourcebook (Page 12M) Engineered Systems - August 2008 - Mechanical Products Sourcebook (Page 13M) Engineered Systems - August 2008 - Mechanical Products Sourcebook (Page 14M) Engineered Systems - August 2008 - Mechanical Products Sourcebook (Page 15M) Engineered Systems - August 2008 - Mechanical Products Sourcebook (Page 16M) Engineered Systems - August 2008 - Q&A: Dehumidification In Schools (Page 56) Engineered Systems - August 2008 - Q&A: Dehumidification In Schools (Page 57) Engineered Systems - August 2008 - Q&A: Dehumidification In Schools (Page 58) Engineered Systems - August 2008 - Q&A: Dehumidification In Schools (Page 59) Engineered Systems - August 2008 - Q&A: Dehumidification In Schools (Page 60) Engineered Systems - August 2008 - Q&A: Dehumidification In Schools (Page 61) Engineered Systems - August 2008 - Building Oversight Management: M&V And More (Page 62) Engineered Systems - August 2008 - Building Oversight Management: M&V And More (Page 63) Engineered Systems - August 2008 - Building Oversight Management: M&V And More (Page 64) Engineered Systems - August 2008 - Building Oversight Management: M&V And More (Page 65) Engineered Systems - August 2008 - Building Oversight Management: M&V And More (Page 66) Engineered Systems - August 2008 - Building Oversight Management: M&V And More (Page 67) Engineered Systems - August 2008 - Products (Page 68) Engineered Systems - August 2008 - Products (Page 69) Engineered Systems - August 2008 - Products (Page 70) Engineered Systems - August 2008 - Products (Page 71) Engineered Systems - August 2008 - Products (Page 72) Engineered Systems - August 2008 - Classifieds (Page 73) Engineered Systems - August 2008 - Classifieds (Page 74) Engineered Systems - August 2008 - Classifieds (Page 75) Engineered Systems - August 2008 - Classifieds (Page 76) Engineered Systems - August 2008 - Advertiser Index (Page 77) Engineered Systems - August 2008 - Tomorrow's Environment (Page 78) Engineered Systems - August 2008 - Tomorrow's Environment (Page Cover3) Engineered Systems - August 2008 - Tomorrow's Environment (Page Cover4)
For optimal viewing of this digital publication, please enable JavaScript and then refresh the page. If you would like to try to load the digital publication without using Flash Player detection, please click here.