Engineered Systems - September 2008 - (Page 14B) COMPANY PROFILE BACnet SUPPLEMENT SECTION Reliable Controls Local Enterprise, Global Scale With over 20 years of design excellence, and a five-year warranty, Reliable Controls® empowers a global network of Authorized Dealers to achieve exceptional service. The BACnet® protocol is a key driver for Reliable Controls Authorized Dealers, permitting interoperability across multi-vendor lines. Projects such as the Architect of the Capitol, Montgomery College, and the new U.S. Department of Transportation headquarters are prime examples of multi-vendor BACnet installations using the Reliable Controls MACHSystem. For Building Automation Controls of Newington, Virginia, the interoperable capabilities of BACnet allowed them the freedom to expand the existing Architect of the Capitol system by using Reliable Controls. Similarly, at Montgomery College in Maryland, Reliable Controls is installed using BACnet across both the Rockville and the Takoma Park campuses. This interoperability allows facility managers to maximize the return on investment of their existing multi-vendor, multi-campus infrastructure. To control the 2 million sq ft of the new U.S. Department of Transportation headquarters, a native BACnet system was selected after an exhaustive procurement process based heavily on the capabilities of Reliable Controls and Pritchett Controls. In addition to providing HVAC control, the Reliable Controls MACH-System also integrates packaged pump skids, VFDs, lighting controls, and power monitoring via BACnet. The U.S. Department of Transportation headquarters was the largest BACnet new construction project awarded in 2004. The scalability and extensibility of the BACnet protocol are second to none, allowing Authorized Dealers to engineer solutions and provide excellent service. For your next BACnet project, visit www.reliablecontrols.com and request a quote, today. C O N TA C T I N F O R M AT I O N : Tom Zaban Reliable Controls Corporation 120 Hallowell Road Victoria, British Columbia Canada, V94 7K2 PH: 877-475-9301 FX: 250-475-2096 www.reliablecontrols.com 14B B AC n e t C o n f e r e n c e a n d E xp o Su p p l emen t http://www.reliablecontrols.com http://www.reliablecontrols.com http://www.reliablecontrols.com
Table of Contents Feed for the Digital Edition of Engineered Systems - September 2008 Engineered Systems - September 2008 Contents Editor's Note HVAC Challenge Back2Basics Case In Point Commissioning Building Automation HVACR Designer Tips Application Checklist LEED®, Or Get (It) Out Of The Way? BACnet Supplement Race To Market Steam Humidification In Pharmaceutical Facilities Outside Air, Inside Data Centers Forecast: Increasingly Cloudy And Under Control Products Computers & Software Literature Glossary Classifieds Advertiser Index Tomorrow's Environment Engineered Systems - September 2008 Engineered Systems - September 2008 - Engineered Systems - September 2008 (Page Cover1) Engineered Systems - September 2008 - Engineered Systems - September 2008 (Page Cover2) Engineered Systems - September 2008 - Engineered Systems - September 2008 (Page 3) Engineered Systems - September 2008 - Contents (Page 4) Engineered Systems - September 2008 - Contents (Page 5) Engineered Systems - September 2008 - Contents (Page 6) Engineered Systems - September 2008 - Contents (Page 7) Engineered Systems - September 2008 - Editor's Note (Page 8) Engineered Systems - September 2008 - Editor's Note (Page 9) Engineered Systems - September 2008 - HVAC Challenge (Page 10) Engineered Systems - September 2008 - HVAC Challenge (Page 11) Engineered Systems - September 2008 - Back2Basics (Page 12) Engineered Systems - September 2008 - Back2Basics (Page 13) Engineered Systems - September 2008 - Case In Point (Page 14) Engineered Systems - September 2008 - Case In Point (Page 15) Engineered Systems - September 2008 - Case In Point (Page 16) Engineered Systems - September 2008 - Case In Point (Page 17) Engineered Systems - September 2008 - Case In Point (Page 18) Engineered Systems - September 2008 - Case In Point (Page 19) Engineered Systems - September 2008 - Case In Point (Page 20) Engineered Systems - September 2008 - Case In Point (Page 21) Engineered Systems - September 2008 - Case In Point (Page 22) Engineered Systems - September 2008 - Case In Point (Page 23) Engineered Systems - September 2008 - Case In Point (Page 24) Engineered Systems - September 2008 - Case In Point (Page 25) Engineered Systems - September 2008 - Case In Point (Page 26) Engineered Systems - September 2008 - Case In Point (Page 27) Engineered Systems - September 2008 - Commissioning (Page 28) Engineered Systems - September 2008 - Commissioning (Page 29) Engineered Systems - September 2008 - Building Automation (Page 30) Engineered Systems - September 2008 - Building Automation (Page 31) Engineered Systems - September 2008 - HVACR Designer Tips (Page 32) Engineered Systems - September 2008 - HVACR Designer Tips (Page 33) Engineered Systems - September 2008 - Application Checklist (Page 34) Engineered Systems - September 2008 - Application Checklist (Page 35) Engineered Systems - September 2008 - LEED®, Or Get (It) Out Of The Way? (Page 36) Engineered Systems - September 2008 - LEED®, Or Get (It) Out Of The Way? (Page 37) Engineered Systems - September 2008 - LEED®, Or Get (It) Out Of The Way? (Page 38) Engineered Systems - September 2008 - LEED®, Or Get (It) Out Of The Way? (Page 39) Engineered Systems - September 2008 - LEED®, Or Get (It) Out Of The Way? (Page 40) Engineered Systems - September 2008 - LEED®, Or Get (It) Out Of The Way? (Page 41) Engineered Systems - September 2008 - LEED®, Or Get (It) Out Of The Way? (Page 42) Engineered Systems - September 2008 - LEED®, Or Get (It) Out Of The Way? (Page 43) Engineered Systems - September 2008 - LEED®, Or Get (It) Out Of The Way? (Page 44) Engineered Systems - September 2008 - BACnet Supplement (Page 1B) Engineered Systems - September 2008 - BACnet Supplement (Page 2B) Engineered Systems - September 2008 - BACnet Supplement (Page 3B) Engineered Systems - September 2008 - BACnet Supplement (Page 4B) Engineered Systems - September 2008 - BACnet Supplement (Page 5B) Engineered Systems - September 2008 - BACnet Supplement (Page 6B) Engineered Systems - September 2008 - BACnet Supplement (Page 7B) Engineered Systems - September 2008 - BACnet Supplement (Page 8B) Engineered Systems - September 2008 - BACnet Supplement (Page 9B) Engineered Systems - September 2008 - BACnet Supplement (Page 10B) Engineered Systems - September 2008 - BACnet Supplement (Page 11B) Engineered Systems - September 2008 - BACnet Supplement (Page 12B) Engineered Systems - September 2008 - BACnet Supplement (Page 13B) Engineered Systems - September 2008 - BACnet Supplement (Page 14B) Engineered Systems - September 2008 - BACnet Supplement (Page 15B) Engineered Systems - September 2008 - BACnet Supplement (Page 16B) Engineered Systems - September 2008 - BACnet Supplement (Page 17B) Engineered Systems - September 2008 - BACnet Supplement (Page 18B) Engineered Systems - September 2008 - BACnet Supplement (Page 19B) Engineered Systems - September 2008 - BACnet Supplement (Page 20B) Engineered Systems - September 2008 - BACnet Supplement (Page 21B) Engineered Systems - September 2008 - Race To Market (Page 66) Engineered Systems - September 2008 - Race To Market (Page 67) Engineered Systems - September 2008 - Race To Market (Page 68) Engineered Systems - September 2008 - Race To Market (Page 69) Engineered Systems - September 2008 - Race To Market (Page 70) Engineered Systems - September 2008 - Race To Market (Page 71) Engineered Systems - September 2008 - Steam Humidification In Pharmaceutical Facilities (Page 72) Engineered Systems - September 2008 - Steam Humidification In Pharmaceutical Facilities (Page 73) Engineered Systems - September 2008 - Steam Humidification In Pharmaceutical Facilities (Page 74) Engineered Systems - September 2008 - Steam Humidification In Pharmaceutical Facilities (Page 75) Engineered Systems - September 2008 - Outside Air, Inside Data Centers (Page 76) Engineered Systems - September 2008 - Outside Air, Inside Data Centers (Page 77) Engineered Systems - September 2008 - Outside Air, Inside Data Centers (Page 78) Engineered Systems - September 2008 - Outside Air, Inside Data Centers (Page 79) Engineered Systems - September 2008 - Outside Air, Inside Data Centers (Page 80) Engineered Systems - September 2008 - Forecast: Increasingly Cloudy And Under Control (Page 81) Engineered Systems - September 2008 - Forecast: Increasingly Cloudy And Under Control (Page 82) Engineered Systems - September 2008 - Forecast: Increasingly Cloudy And Under Control (Page 83) Engineered Systems - September 2008 - Forecast: Increasingly Cloudy And Under Control (Page 84) Engineered Systems - September 2008 - Forecast: Increasingly Cloudy And Under Control (Page 85) Engineered Systems - September 2008 - Forecast: Increasingly Cloudy And Under Control (Page 86) Engineered Systems - September 2008 - Products (Page 87) Engineered Systems - September 2008 - Products (Page 88) Engineered Systems - September 2008 - Products (Page 89) Engineered Systems - September 2008 - Computers & Software (Page 90) Engineered Systems - September 2008 - Literature (Page 91) Engineered Systems - September 2008 - Glossary (Page 92) Engineered Systems - September 2008 - Classifieds (Page 93) Engineered Systems - September 2008 - Classifieds (Page 94) Engineered Systems - September 2008 - Classifieds (Page 95) Engineered Systems - September 2008 - Classifieds (Page 96) Engineered Systems - September 2008 - Advertiser Index (Page 97) Engineered Systems - September 2008 - Tomorrow's Environment (Page 98) Engineered Systems - September 2008 - Tomorrow's Environment (Page Cover3) Engineered Systems - September 2008 - Tomorrow's Environment (Page Cover4)
For optimal viewing of this digital publication, please enable JavaScript and then refresh the page. If you would like to try to load the digital publication without using Flash Player detection, please click here.