Engineered Systems - September 2008 - (Page 20) CaseInPoint Gibraltar Design. Envoy hired Correct Construction as mechanical contractor and Morris Sheet Metal to fabricate and install the ductwork. Morris Sheet Metal began work in December 2006 fabricating internally insulated sheet metal ducts of varying sizes. For the larger gathering areas, such as the auditorium, great hall, gymnasium, and field house, the contractor made large, round ducts, ranging from 20- to 48-in. dia. For the rest of the school, they fabricated rectangular ducts in sizes from 8-in.-by-6-in. to 96-in.-by 24-in. As the new ducts were produced, Morris Sheet Metal began installing them with a crew of eight throughout the school building. They hung the larger ductwork with trapeze hangers, made from all thread rod and angle iron. They hung the smaller ducts with 1-in. metal straps. RAMPING UP FOR THE BIGGEST CHALLENGE The contractor’s biggest challenge came when hanging ductwork in the auditorium, which has sloped floors and a 40-ft structure above. To reach the structure, the crew used tall scissor lifts, but the sloped floors presented a difficulty, placing them at awkward angles during duct installation. The crew was able to overcome this obstacle, however, by using ramps. “We had solid wood ramps built for the scissor lifts,” said Curt Kelsey, project manager for Morris Sheet Metal. “Every time we wanted to move to another spot, we had to drive off the ramp, reposition it, drive back on it, and load the lift up with another piece of duct and take it up to the structure above. This helped us to go straight up, instead of at an angle.” Coleman Insulation Company followed behind the Morris Sheet Metal Crew, installing SoftTouch Duct Wrap over the ductwork. The HVAC portion of the Hobart High School construction project is expected to be complete in July, and the school is scheduled to open for classes in January 2009. So far, the school has received positive reviews. “We’re very pleased with how the school is turning out,” Carlson said. “We’ve got some very good contractors working on the project.” The new Hobart High School will hold 1,400 students, with room to grow to the east and west of the building. The building is 331,750 sq ft and sits on 84 acres of land. Self-reliance dotcom — online facility services strengthens university’s physical plant operations Since its inception in 1911, the University of Regina in Saskatchewan’s capital city has grown to mirror the dynamic people and economy of the Canadian province, providing an ideal study and work environment for more than 12,000 full- and part-time students. In recent years, the university has experienced impressive physical expansion, due in large part to its academic reputation. Since 1995, the school has doubled its footprint to support a long-range goal of accommodating a student population of more than 25,000. ON ITS TOES — AND ITS OWN Without question, the university’s need to serve the educational require- Engineers and building owners rely on Belimo to ensure reliable, energy efficient performance in their HVAC systems. The consistent quality, delivery and performance of Belimo products have solved comfort challenges, improved energy efficiencies and earned trust through long and productive life. The Pressure Independent Characterized Control Valve (PICCV) combines the proven CCV technology plus a dynamic regulator. PICCV reacts to pressure variations, performing a continual balancing function to maintain optimum system performance. Want the best? Specify Belimo > Get the details: www.piccv.com BELIMO • 877.833.1609 • www.belimo.com Input 65 at www.esmagazine.com/instantproductinfo ESM07084Belimo.indd 1 ed S y stem s 20 En gi neer September 2008 6/23/08 11:31:48 AM http://www.belimo.com http://www.piccv.com http://www.belimo.com http://www.esmagazine.com/instantproductinfo
Table of Contents Feed for the Digital Edition of Engineered Systems - September 2008 Engineered Systems - September 2008 Contents Editor's Note HVAC Challenge Back2Basics Case In Point Commissioning Building Automation HVACR Designer Tips Application Checklist LEED®, Or Get (It) Out Of The Way? BACnet Supplement Race To Market Steam Humidification In Pharmaceutical Facilities Outside Air, Inside Data Centers Forecast: Increasingly Cloudy And Under Control Products Computers & Software Literature Glossary Classifieds Advertiser Index Tomorrow's Environment Engineered Systems - September 2008 Engineered Systems - September 2008 - Engineered Systems - September 2008 (Page Cover1) Engineered Systems - September 2008 - Engineered Systems - September 2008 (Page Cover2) Engineered Systems - September 2008 - Engineered Systems - September 2008 (Page 3) Engineered Systems - September 2008 - Contents (Page 4) Engineered Systems - September 2008 - Contents (Page 5) Engineered Systems - September 2008 - Contents (Page 6) Engineered Systems - September 2008 - Contents (Page 7) Engineered Systems - September 2008 - Editor's Note (Page 8) Engineered Systems - September 2008 - Editor's Note (Page 9) Engineered Systems - September 2008 - HVAC Challenge (Page 10) Engineered Systems - September 2008 - HVAC Challenge (Page 11) Engineered Systems - September 2008 - Back2Basics (Page 12) Engineered Systems - September 2008 - Back2Basics (Page 13) Engineered Systems - September 2008 - Case In Point (Page 14) Engineered Systems - September 2008 - Case In Point (Page 15) Engineered Systems - September 2008 - Case In Point (Page 16) Engineered Systems - September 2008 - Case In Point (Page 17) Engineered Systems - September 2008 - Case In Point (Page 18) Engineered Systems - September 2008 - Case In Point (Page 19) Engineered Systems - September 2008 - Case In Point (Page 20) Engineered Systems - September 2008 - Case In Point (Page 21) Engineered Systems - September 2008 - Case In Point (Page 22) Engineered Systems - September 2008 - Case In Point (Page 23) Engineered Systems - September 2008 - Case In Point (Page 24) Engineered Systems - September 2008 - Case In Point (Page 25) Engineered Systems - September 2008 - Case In Point (Page 26) Engineered Systems - September 2008 - Case In Point (Page 27) Engineered Systems - September 2008 - Commissioning (Page 28) Engineered Systems - September 2008 - Commissioning (Page 29) Engineered Systems - September 2008 - Building Automation (Page 30) Engineered Systems - September 2008 - Building Automation (Page 31) Engineered Systems - September 2008 - HVACR Designer Tips (Page 32) Engineered Systems - September 2008 - HVACR Designer Tips (Page 33) Engineered Systems - September 2008 - Application Checklist (Page 34) Engineered Systems - September 2008 - Application Checklist (Page 35) Engineered Systems - September 2008 - LEED®, Or Get (It) Out Of The Way? (Page 36) Engineered Systems - September 2008 - LEED®, Or Get (It) Out Of The Way? (Page 37) Engineered Systems - September 2008 - LEED®, Or Get (It) Out Of The Way? (Page 38) Engineered Systems - September 2008 - LEED®, Or Get (It) Out Of The Way? (Page 39) Engineered Systems - September 2008 - LEED®, Or Get (It) Out Of The Way? (Page 40) Engineered Systems - September 2008 - LEED®, Or Get (It) Out Of The Way? (Page 41) Engineered Systems - September 2008 - LEED®, Or Get (It) Out Of The Way? (Page 42) Engineered Systems - September 2008 - LEED®, Or Get (It) Out Of The Way? (Page 43) Engineered Systems - September 2008 - LEED®, Or Get (It) Out Of The Way? (Page 44) Engineered Systems - September 2008 - BACnet Supplement (Page 1B) Engineered Systems - September 2008 - BACnet Supplement (Page 2B) Engineered Systems - September 2008 - BACnet Supplement (Page 3B) Engineered Systems - September 2008 - BACnet Supplement (Page 4B) Engineered Systems - September 2008 - BACnet Supplement (Page 5B) Engineered Systems - September 2008 - BACnet Supplement (Page 6B) Engineered Systems - September 2008 - BACnet Supplement (Page 7B) Engineered Systems - September 2008 - BACnet Supplement (Page 8B) Engineered Systems - September 2008 - BACnet Supplement (Page 9B) Engineered Systems - September 2008 - BACnet Supplement (Page 10B) Engineered Systems - September 2008 - BACnet Supplement (Page 11B) Engineered Systems - September 2008 - BACnet Supplement (Page 12B) Engineered Systems - September 2008 - BACnet Supplement (Page 13B) Engineered Systems - September 2008 - BACnet Supplement (Page 14B) Engineered Systems - September 2008 - BACnet Supplement (Page 15B) Engineered Systems - September 2008 - BACnet Supplement (Page 16B) Engineered Systems - September 2008 - BACnet Supplement (Page 17B) Engineered Systems - September 2008 - BACnet Supplement (Page 18B) Engineered Systems - September 2008 - BACnet Supplement (Page 19B) Engineered Systems - September 2008 - BACnet Supplement (Page 20B) Engineered Systems - September 2008 - BACnet Supplement (Page 21B) Engineered Systems - September 2008 - Race To Market (Page 66) Engineered Systems - September 2008 - Race To Market (Page 67) Engineered Systems - September 2008 - Race To Market (Page 68) Engineered Systems - September 2008 - Race To Market (Page 69) Engineered Systems - September 2008 - Race To Market (Page 70) Engineered Systems - September 2008 - Race To Market (Page 71) Engineered Systems - September 2008 - Steam Humidification In Pharmaceutical Facilities (Page 72) Engineered Systems - September 2008 - Steam Humidification In Pharmaceutical Facilities (Page 73) Engineered Systems - September 2008 - Steam Humidification In Pharmaceutical Facilities (Page 74) Engineered Systems - September 2008 - Steam Humidification In Pharmaceutical Facilities (Page 75) Engineered Systems - September 2008 - Outside Air, Inside Data Centers (Page 76) Engineered Systems - September 2008 - Outside Air, Inside Data Centers (Page 77) Engineered Systems - September 2008 - Outside Air, Inside Data Centers (Page 78) Engineered Systems - September 2008 - Outside Air, Inside Data Centers (Page 79) Engineered Systems - September 2008 - Outside Air, Inside Data Centers (Page 80) Engineered Systems - September 2008 - Forecast: Increasingly Cloudy And Under Control (Page 81) Engineered Systems - September 2008 - Forecast: Increasingly Cloudy And Under Control (Page 82) Engineered Systems - September 2008 - Forecast: Increasingly Cloudy And Under Control (Page 83) Engineered Systems - September 2008 - Forecast: Increasingly Cloudy And Under Control (Page 84) Engineered Systems - September 2008 - Forecast: Increasingly Cloudy And Under Control (Page 85) Engineered Systems - September 2008 - Forecast: Increasingly Cloudy And Under Control (Page 86) Engineered Systems - September 2008 - Products (Page 87) Engineered Systems - September 2008 - Products (Page 88) Engineered Systems - September 2008 - Products (Page 89) Engineered Systems - September 2008 - Computers & Software (Page 90) Engineered Systems - September 2008 - Literature (Page 91) Engineered Systems - September 2008 - Glossary (Page 92) Engineered Systems - September 2008 - Classifieds (Page 93) Engineered Systems - September 2008 - Classifieds (Page 94) Engineered Systems - September 2008 - Classifieds (Page 95) Engineered Systems - September 2008 - Classifieds (Page 96) Engineered Systems - September 2008 - Advertiser Index (Page 97) Engineered Systems - September 2008 - Tomorrow's Environment (Page 98) Engineered Systems - September 2008 - Tomorrow's Environment (Page Cover3) Engineered Systems - September 2008 - Tomorrow's Environment (Page Cover4)
For optimal viewing of this digital publication, please enable JavaScript and then refresh the page. If you would like to try to load the digital publication without using Flash Player detection, please click here.