Engineered Systems - September 2008 - (Page 41) they are proposing dropping down to 10%). This hit me in the early stages of a design where the process load for my building was already approaching 70% of the total. Now instead of meeting 90.1, and likely beating it by a little, I was mandated to beat it by 14%. So let’s run that familiar equation one more time: 100% - (30% x 0.47) = 86% I’m good, but I couldn’t for the life of me figure out how to cut the energy use associated with regulated loads by 47% on a building with an already efficient envelope, hardly any glass to start with, a low occupancy, and very few lights I could play with. On top of that, ideas like natural ventilation and airside economizers on a data center floor were just non-starters for this client. So you know what happened? Well, of course you don’t, you weren’t there. But I will tell you: the client bailed on the green targets altogether. Oh, I’m not saying that energy efficiency was no longer a mandate, but as an overriding theme, once LEED was off the table, from a sustainability perspective, the design team fragmented. Now you may say shame on us for letting that happen, but in the throes of a design when you are barreling toward a deadline on a building where reliability and budget are drivers, if halfway through the process your green paradigm gets tossed, it’s hard to refocus, especially when it was a secondary goal to begin with. Input 49 at www.esmagazine.com/instantproductinfo Q&A The adjustments made to NC 2.2 are punitive and will likely discourage some from pursuing sustainable data center designs, but maybe I’m just a pessimist. Maybe I have become jaded on green (pun painfully intended). Has anyone asked the powers that be for a fair adjudication? In February 2007, an official interpretation and request for relief from this onerous requirement of equal process loads was submitted to the USGBC. In so many words, they acknowledged the challenge but offered no sanctuary2. Again in July of 2007, the same question was asked, and the USGBC stood by their guns3. In both cases these were data center designs hamstrung by the new requirements. In August of last year, yours truly submitted an interpretation request to ASHRAE regarding the very applicability of 90.1 to data centers in the first place, since they are primarily buildings dedicated to a commercial process (a specific exception under 2.3.c of the standard). ASHRAE responded, stating that the building envelope and systems must meet all requirements of the standard with the exception of the “space conditioning system installed specifically to support the Datacom equipment.4” I found no comfort in this response because it appeared to be taking even more stuff out of my control, further increasing the percentage I must bleed from the remainder. Just FYI, further clarification has been requested from the Committee. And one more report to belabor the point, and possibly confuse. The EPA’s Report to Congress on data center energy efficiency5 states, “The current ASHRAE standards, however, exclude energy that is primarily used for commercial, industrial, or manufacturing processes. Thus ASHRAE 90.1 excludes data center heating and cooling (which mainly cools equipment, not people) and IT equipment (ASHRAE 2004a, Section 2.3). However, ASHRAE is developing guidance to address aspects of data center design … Input 16 at www.esmagazine.com/instantproductinfo w w w. esmag a zine . c o m ESM09084Parker.indd 1 41 8/19/08 3:25:17 PM http://www.esmagazine.com/instantproductinfo http://www.parkerboiler.com http://www.parkerboiler.com http://www.esmagazine.com/instantproductinfo http://www.esmagazine.com
Table of Contents Feed for the Digital Edition of Engineered Systems - September 2008 Engineered Systems - September 2008 Contents Editor's Note HVAC Challenge Back2Basics Case In Point Commissioning Building Automation HVACR Designer Tips Application Checklist LEED®, Or Get (It) Out Of The Way? BACnet Supplement Race To Market Steam Humidification In Pharmaceutical Facilities Outside Air, Inside Data Centers Forecast: Increasingly Cloudy And Under Control Products Computers & Software Literature Glossary Classifieds Advertiser Index Tomorrow's Environment Engineered Systems - September 2008 Engineered Systems - September 2008 - Engineered Systems - September 2008 (Page Cover1) Engineered Systems - September 2008 - Engineered Systems - September 2008 (Page Cover2) Engineered Systems - September 2008 - Engineered Systems - September 2008 (Page 3) Engineered Systems - September 2008 - Contents (Page 4) Engineered Systems - September 2008 - Contents (Page 5) Engineered Systems - September 2008 - Contents (Page 6) Engineered Systems - September 2008 - Contents (Page 7) Engineered Systems - September 2008 - Editor's Note (Page 8) Engineered Systems - September 2008 - Editor's Note (Page 9) Engineered Systems - September 2008 - HVAC Challenge (Page 10) Engineered Systems - September 2008 - HVAC Challenge (Page 11) Engineered Systems - September 2008 - Back2Basics (Page 12) Engineered Systems - September 2008 - Back2Basics (Page 13) Engineered Systems - September 2008 - Case In Point (Page 14) Engineered Systems - September 2008 - Case In Point (Page 15) Engineered Systems - September 2008 - Case In Point (Page 16) Engineered Systems - September 2008 - Case In Point (Page 17) Engineered Systems - September 2008 - Case In Point (Page 18) Engineered Systems - September 2008 - Case In Point (Page 19) Engineered Systems - September 2008 - Case In Point (Page 20) Engineered Systems - September 2008 - Case In Point (Page 21) Engineered Systems - September 2008 - Case In Point (Page 22) Engineered Systems - September 2008 - Case In Point (Page 23) Engineered Systems - September 2008 - Case In Point (Page 24) Engineered Systems - September 2008 - Case In Point (Page 25) Engineered Systems - September 2008 - Case In Point (Page 26) Engineered Systems - September 2008 - Case In Point (Page 27) Engineered Systems - September 2008 - Commissioning (Page 28) Engineered Systems - September 2008 - Commissioning (Page 29) Engineered Systems - September 2008 - Building Automation (Page 30) Engineered Systems - September 2008 - Building Automation (Page 31) Engineered Systems - September 2008 - HVACR Designer Tips (Page 32) Engineered Systems - September 2008 - HVACR Designer Tips (Page 33) Engineered Systems - September 2008 - Application Checklist (Page 34) Engineered Systems - September 2008 - Application Checklist (Page 35) Engineered Systems - September 2008 - LEED®, Or Get (It) Out Of The Way? (Page 36) Engineered Systems - September 2008 - LEED®, Or Get (It) Out Of The Way? (Page 37) Engineered Systems - September 2008 - LEED®, Or Get (It) Out Of The Way? (Page 38) Engineered Systems - September 2008 - LEED®, Or Get (It) Out Of The Way? (Page 39) Engineered Systems - September 2008 - LEED®, Or Get (It) Out Of The Way? (Page 40) Engineered Systems - September 2008 - LEED®, Or Get (It) Out Of The Way? (Page 41) Engineered Systems - September 2008 - LEED®, Or Get (It) Out Of The Way? (Page 42) Engineered Systems - September 2008 - LEED®, Or Get (It) Out Of The Way? (Page 43) Engineered Systems - September 2008 - LEED®, Or Get (It) Out Of The Way? (Page 44) Engineered Systems - September 2008 - BACnet Supplement (Page 1B) Engineered Systems - September 2008 - BACnet Supplement (Page 2B) Engineered Systems - September 2008 - BACnet Supplement (Page 3B) Engineered Systems - September 2008 - BACnet Supplement (Page 4B) Engineered Systems - September 2008 - BACnet Supplement (Page 5B) Engineered Systems - September 2008 - BACnet Supplement (Page 6B) Engineered Systems - September 2008 - BACnet Supplement (Page 7B) Engineered Systems - September 2008 - BACnet Supplement (Page 8B) Engineered Systems - September 2008 - BACnet Supplement (Page 9B) Engineered Systems - September 2008 - BACnet Supplement (Page 10B) Engineered Systems - September 2008 - BACnet Supplement (Page 11B) Engineered Systems - September 2008 - BACnet Supplement (Page 12B) Engineered Systems - September 2008 - BACnet Supplement (Page 13B) Engineered Systems - September 2008 - BACnet Supplement (Page 14B) Engineered Systems - September 2008 - BACnet Supplement (Page 15B) Engineered Systems - September 2008 - BACnet Supplement (Page 16B) Engineered Systems - September 2008 - BACnet Supplement (Page 17B) Engineered Systems - September 2008 - BACnet Supplement (Page 18B) Engineered Systems - September 2008 - BACnet Supplement (Page 19B) Engineered Systems - September 2008 - BACnet Supplement (Page 20B) Engineered Systems - September 2008 - BACnet Supplement (Page 21B) Engineered Systems - September 2008 - Race To Market (Page 66) Engineered Systems - September 2008 - Race To Market (Page 67) Engineered Systems - September 2008 - Race To Market (Page 68) Engineered Systems - September 2008 - Race To Market (Page 69) Engineered Systems - September 2008 - Race To Market (Page 70) Engineered Systems - September 2008 - Race To Market (Page 71) Engineered Systems - September 2008 - Steam Humidification In Pharmaceutical Facilities (Page 72) Engineered Systems - September 2008 - Steam Humidification In Pharmaceutical Facilities (Page 73) Engineered Systems - September 2008 - Steam Humidification In Pharmaceutical Facilities (Page 74) Engineered Systems - September 2008 - Steam Humidification In Pharmaceutical Facilities (Page 75) Engineered Systems - September 2008 - Outside Air, Inside Data Centers (Page 76) Engineered Systems - September 2008 - Outside Air, Inside Data Centers (Page 77) Engineered Systems - September 2008 - Outside Air, Inside Data Centers (Page 78) Engineered Systems - September 2008 - Outside Air, Inside Data Centers (Page 79) Engineered Systems - September 2008 - Outside Air, Inside Data Centers (Page 80) Engineered Systems - September 2008 - Forecast: Increasingly Cloudy And Under Control (Page 81) Engineered Systems - September 2008 - Forecast: Increasingly Cloudy And Under Control (Page 82) Engineered Systems - September 2008 - Forecast: Increasingly Cloudy And Under Control (Page 83) Engineered Systems - September 2008 - Forecast: Increasingly Cloudy And Under Control (Page 84) Engineered Systems - September 2008 - Forecast: Increasingly Cloudy And Under Control (Page 85) Engineered Systems - September 2008 - Forecast: Increasingly Cloudy And Under Control (Page 86) Engineered Systems - September 2008 - Products (Page 87) Engineered Systems - September 2008 - Products (Page 88) Engineered Systems - September 2008 - Products (Page 89) Engineered Systems - September 2008 - Computers & Software (Page 90) Engineered Systems - September 2008 - Literature (Page 91) Engineered Systems - September 2008 - Glossary (Page 92) Engineered Systems - September 2008 - Classifieds (Page 93) Engineered Systems - September 2008 - Classifieds (Page 94) Engineered Systems - September 2008 - Classifieds (Page 95) Engineered Systems - September 2008 - Classifieds (Page 96) Engineered Systems - September 2008 - Advertiser Index (Page 97) Engineered Systems - September 2008 - Tomorrow's Environment (Page 98) Engineered Systems - September 2008 - Tomorrow's Environment (Page Cover3) Engineered Systems - September 2008 - Tomorrow's Environment (Page Cover4)
For optimal viewing of this digital publication, please enable JavaScript and then refresh the page. If you would like to try to load the digital publication without using Flash Player detection, please click here.